Loading...
11/12/2014 - Packet Completeness Review for Boards, Commissions and Committee Records CITY OF TIGARD Intergovermental Water Board Name of Board, Commission or Committee 11/12/2014 Date of Meeting I have verified these documents are a complete copy of the official record. Judy Lawhead Print Name Si azure 12/23/2015 Date Intergovernmental Water Board Agenda SERVING TIGARD,KING CITY,DURHAM AND TIGARD WATER DISTRICT MEETING DATE: Wednesday, November 12, 2014, 5:30 p.m. MEETING LOCATION: Tigard Public Works Building 8777 SW Burnham Street Tigard, OR 97223 1. Call to Order, Roll Call and Introductions 2. Approval of Minutes — October 8, 2014 Action: Motion to approve the October 8, 2014, minutes. 3. Public Comments Call for comments from the public. 4. Water Supply Update—John Goodrich No action required. 5. Presentation of 2014 Water Study Results—Joe Healy, HDR Action: Motion to recommend the Tigard City Council regarding water rates. 6. Informational Items 7. Non-Agenda Items Call for non-agenda items from the board. 8. Next Meeting December 10, 2014, at 5:30 p.m. 8777 SW Burnham Street,Tigard, Oregon 9. Adjournment Action: Motion for adjournment. Executive Session The Intergovernmental Water Board may go into Executive Session. If an Executive Session is called to order, the appropriate ORS citation will be announced identifying the applicable statute. All discussions are confidential and those present may disclose nothing from the Session. Representatives of the news media are allowed to attend Executive Sessions, as provided by ORS 192.660(4), but must not disclose any information discussed. No Executive Session may be held for the purpose of taking any final action or making any final decision. Executive Sessions are closed to the public. INTERGOVERNMENTAL WATER BOARD AGENDA—November 125 2014 City of Tigard 1 13125 SW Hall Blvd.,Tigard,OR 97223 1 503-718-2591 1 www.tigard-or.gov I Page 1 of 2 The City of Tigard tries to make all reasonable modifications to ensure that people with disabilities have an equal opportunity to participate in all city meetings. Upon request,the city will do its best to arrange for the following services/equipment: ■ Assistive listening devices. ■ Qualified sign language interpreters. ■ Qualified bilingual interpreters. Because the city may need to hire outside service providers or arrange for specialized equipment,those requesting services/equipment should do so as far in advance as possible,but no later than 3 city work days prior to the meeting. To make a request,call 503-718-2591 (voice) or 503-684-2772 (TDD -Telecommunications Devices for the Dea�. INTERGOVERNMENTAL WATER BOARD AGENDA—November 12, 2014 City of Tigard 1 13125 SW Hall Blvd.,Tigard, OR 97223 ( 503-718-2591 1 www.tigard-or.gov I Page 2 of 2 Intergovernmental Water Board J") Minutes SERVING TIGARD,KING CITY,DURHAM AND TIGARD WATER DISTRICT MEETING DATE: Wednesday, November 12, 2014, 5:30 p.m. MEETING LOCATION: Tigard Public Works Building 8777 SW Burnham Street Tigard, OR 97223 Members Present: Ken Henschel Representing the Tigard Water District (TWD) Keith Jehnke Representing the City of Durham Jodie Inman Member-At-Large Note: King City representative David Newham resigned from the board in July 2014. The King City City Manager will notify Tigard staff when a new representative is appointed. Members Absent: Gretchen Buehner Representing the City of Tigard City of Tigard Staff Present: John Goodrich Interim Assistant Public Works Director Toby LaFrance Finance Director Judy Lawhead IWB Recorder Visitors: David Wells, King City City Manager 1. Call to Order, Roll Call and Introductions Commissioner Henschel called the meeting to order at 5:35 p.m. 2. Approval of Minutes —October 8,2014 Commissioner Inman moved to approve the October 8,2014,minutes. Commissioner Jehnke seconded the motion. The motion passed by unanimous vote of the commissioners present,with Commissioners Henschel,Jehnke, and Inman voting yes. 3. Public Comments There were no comments from the public. 4. Water Supply Update Mr. Goodrich reported: • Average water use for the month of October was 4.6 million gallons per day (mgd). This was about .14 mgd less than the 10-year average and .43 mgd more than was used during October 2013. • Due to current lack of demand, no water is being pumped from aquifer storage and recovery (ASR) wells. Currently water obtained from Portland Water Bureau is sufficient to meet daily system demands. • ASR well no. 1 produced 102 million gallons (mg) of native groundwater this year. ASR well no. 2 has 66 mg remaining in storage; and 75 mg was recovered during this water cycle. • Staff will begin the injection cycle for ASR well no. 2 sometime in December or January. 5. Presentation of 2014 Water Study Results Joe Healy, Senior Financial Analyst with HDR,gave a presentation that summarized future water rate revenue requirements. A copy of the presentation is on file in the IWB meeting record. The study results offered these two scenarios for consideration: • A smoothed rate option would minimize short-term rate impacts. • A one-time rate hike would be a larger rate adjustment in 2015,while holding future annual rate adjustments to 2 percent or less. Commissioner Henschel asked for an explanation of franchise fees. Toby LaFrance gave a basic explanation and said that, due to the complexity of the subject, a more detailed answer can be given at a future meeting. After discussion of the two water rate increase options presented,it was determined that individual jurisdictions will need to present the study results to their constituents before giving a recommendation. 6. Informational Items Mr. Goodrich reported: • The pipe pullback into the tunnel under the Willamette River, using 250 foot lengths of welded pipe,was completed two weeks ago. What was expected to take 24 hours actually took approximately 12 hours. • The Waluga Reservoir walls have been formed up in preparation for the concrete pour. • Underground pipe work has begun at the Bonita Pump Station and forms are up and ready for concrete. 7. Non-Agenda Items There were no non-agenda items. 8. Next Meeting December 10, 2014, at 5:30 p.m. Public Works Auditorium, 8777 SW Burnham Street,Tigard, Oregon 9. Adjournment At 6:48 p.m. Commissioner Inman moved to adjourn the meeting. Commissioner Jehnke seconded the motion. The meeting adjourned by unanimous vote of the commissioners present,with Commissioners Henschel,Jehnke, and Inman voting yes. r 4G �c'hen Buehner, IWB hair Judy' Law ea , I" Recorder Date: f./ r Date: Submitted at the IWB Meeting 11/13/2014 By: _ �) Date: Agenda Item No.: KEY OBJECTIVES • Determine water rate revenue adjustments necessary to meet future revenue requirements • Adequately and properly fund capital infrastructure projects 1 11/13/2014 FUTURE REVENUE REQUIREMENTS INCLUDE SIZEABLE CAPITAL-RELATED EXPENDITURES Year CIP Costs* FY2015 $75.6 •. • Water • FY2016 25.7 FY2017 2.1 FY2018 2.1 FY2019 6.8 ASR ' FY2020 6.6 Pipeline: 1 Zone to 530 Zone FY2021 6.9Cach Reservoir and - FY2022 0.9 FY2023 0.9 _ FY2024 1.0 *Note:Projected costs include escalation. FINANCIAL PLANNING IS A "CASH-FLOW" APPROACH • Over time, revenue must be equal to or greater than the utility's costs +0&M Expenses +Total Capital Projects +Transfer Payments —Bond Proceeds (Revenue Bonds) + Debt Service (P&I) —Grants + Rate-Funded Capital Projects —Customer Contributions (e.g. SDCsJ =Total Revenue Requirements = Capital Projects Funded from Rates —Miscellaneous Revenues = Balance Required from Rates 2 11/13/2014 Con � Long-term Cash and Financing Option s debt reserves Lower, Send price Avoid rate Smoother signals shock Rate Changes �Gt•nf lflper �� Ca�ration Xmxia fhana& Rin�B FNm ��� Y1Yrtrri� 01� We1p�ncW Wn. Malaeer Mertaye� Dnyay Nrvgation Seem R I �r MG ❑� Rate Adjustments&Typical Bill Impacts ... Reserve Funds Pm)"hon 6% 51U 5% ... _ 56. _ e`4% SSU .% 50 91 — — 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2015 2016 2017 2018 2019 2020 2021 2022 2023 2924 true M1 _,Y."a+ clwxe.r ®MF..te——r.a­­ CIP and Financing Debt Service and Coverage "'in° $80 — --- 512.. - 20 $20 _ 510.0 1 e F 16 560 $50 _ 58.0 y— lA E 1.2 $4U — b' 56.0 — 10 5 530 a 54.0 .. - 06 �' 110 $2.0 510 - — --- o: 0,0 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 a�F��eac to®u�F,b.d cm omdi:� �,w.��ue xe�.� aaa�oea sa are �.sc o- r�Fe ce..:�:, ANALYSIS USING HDR'S FINANCIAL PLANNING MODEL 3 11/13/2014 PRELIMINARY CONCLUSION • HDR analyzed the City's data and developed scenarios with City staff. • Two scenarios are up for consideration: o Smoothed Rate Impact o One-Time Rate Hike in 2015 • Either scenario will meet the City's revenue requirements, target reserve levels, and financial benchmarks. 01 REVIEWED TWO RATE FORECAST OPTIONS 1. Smoothed Rate Impact — An analysis to identify optimal amounts of new debt and rates to pay for projects while minimizing short-term rate impacts. 2. np-T mp Rptp Hike in 901 — A financial forecast given a large rate adjustment in 2015, while holding future annual rate adjustments to 2% or less. 4 11/13/2014 SUMMARY OF • SMOOTHED RATES Rate Adjustments&typical Bill Impacts Fiscal Year Ending IDescription iz% 560 c n T C 0% $0 2015 2016 2017 2018 2019 �Ra�Adf. —•—Typical Bill Current115 2016 201712019 Rate Adj. 5.30°/ 5.30°/ 5.30°/ 2.00% 2.00% SUMMARY Monthly Bill $45.92 $48.35 $50.91 $53.61 $54.68 $55.77 $illlnarease 2.43 2.56 2.70 1.07 1.09 OF • Rate Adjustments&typical Bill Impacts Fiscal Year Ending 10% - — • $50 c N m a 296 $la o% So 2015 2016 2017 2016 2019 �Rate AdJ. —•—Typical BRI Dewri pti on Current 20151 117 2018 2019 Rate Adj. 10.50% 2.00% NW. � .00% 2.3.86 $541.06 1.08 5 11/13/2014 PROJECTED Reserve Funds Projection $so N C $10 / 2015 2016 2017 2018 2019 i"—d Water Fund ®CIP Fund ®DS Fund �SDC �Min.Reserves �Min.Water Fund Debt Service and Coverage $12.0 2.0 $10.0 1.8 c 1.6 ................. ......... .......... 1.4 2 E $8.0 1.2 m C', c $6.0 1.0 m 0.8 $4.0 - -- - — 0.6 u° < $2.0 - - 0.2 $0.0 - 0.0 2015 2016 2017 2018 2019 �Deht$ervice DSC ....0...Target Coverage 6 11/13/2014 7