City of Tigard
41 Transportation Advisory Committee Agenda
MEETING DATE/TIME: October 7, 2015— 6:30 to 8:30 p.m.
MEETING LOCATION: Tigard Library, 2nd Floor Conf. Room, 13500 SW Hall Blvd.
1. CALL TO ORDER Kevin 6:30
Welcome and Introductions
2. CONSIDER MINUTES Kevin 6:35
3. PUBLIC COMMENT Kevin 6:40
4. CIP PRESENTATION &DISCUSSION Staff 6:45
5. "KEY POINTS" REVIEW&EVALUATION Kevin/All 7:30
6. BIKE/PED SUBCOMMITTEE OVERVIEW Ben 8:15
7. PROJECT UPDATES Mike 8:25
8. PLANNING CALENDAR Kevin 8:35
9. OTHER BUSINESS All 8:40
10. ADJOURNMENT Kevin 8:45
Supporting materials/handouts
September 2,2015 Minutes
Key Points September 2015
Planning Calendar
TRANSPORTATION ADVISORY COMMITTEE AGENDA— October 7, 2015
City of Tigard 1 13125 SW Hall Blvd.,Tigard,OR 97223 1 503-639-4171 1 www.tigard-or.gov I Page 1 oft
I.-\Community Development\Boards Committees Commissions\TTAC2015\10_0ctober\TlACAgenda 20151007.docx
CITY OF TIGARD
TIGARD TRANSPORTATION ADVISORY COMMITTEE
Meeting Minutes
October 7, 2015
Members Present: Kevin Watkins (Chair), Karen Hughart (Vice Chair), Benjamin Gooley,Don
Schmidt, Evelyn Murphy,Erik Halstead,Jennifer Stanfield,Mark Bogert, Stephanie McKee,Joseph
Vasicek (alternate), Ravi Nagaraj (alternate), and Timothy Esau (alternate).
Members Absent: Elise Shearer.
Staff Present: Kenny Asher, Community Development Director;Brian Rager, Public Works
Director;Buff Brown, Sr. Transportation Planner;Mike McCarthy, Streets and Transportation Sr.
Project Engineer; and Joe Patton, Sr. Administrative Specialist.
Others Present: City Councilor John Goodhouse,TTAC Liaison; and Alex Hawk,Tigard resident.
1. CALL TO ORDER
Chair Watkins called the meeting to order at 6:30 pm. The meeting was held in the Tigard Library,
2"d Floor Conference Room, at 13500 SW Hall Blvd.
2. CONSIDER MINUTES
The September 2, 2015 meeting Minutes were approved.
3. PUBLIC COMMENT
There was no public comment.
4. CIP PRESENTATION & DISCUSSION
Kenny Asher and Brian Rager provided an overview of the staff process of selecting projects for the
CIP list,including the Flowchart CIP Project Selection,Transportation Qualified List and the Uber
list. TTAC will meet on October 20 before the joint meeting with Council, and after if necessary, to
evaluate and rank the projects.After discussion, the Committee decided to send additional questions
regarding the CIP projects to Joe and he will ensure the questions and answers are shared with all
members. Likewise, any additional documents from staff will be distribution to TTAC by Joe. The
Qualified list will be the focus for TTAC,but the Uber list will be reviewed to see if there are
projects that should be moved to the Qualified list. The goal then is for TTAC to rank about 15
projects from the Transportation Qualified List for inclusion on the CIP list at the November
meeting.
5. "KEY POINTS" REVIEW& EVALUATION
After discussion,the consensus is to lead with the Key Points during the joint meeting with Council,
followed by a TTAC Year-in-Review (Planning Calendar), and ending with individual comments.
The general three key points are: increase transportation funding, develop traffic calming in 12— 15
months, and press Tri Met for specific mass transit improvements. Kevin will refine the general key
points into "actionable"items for subsequent review by the Committee.
6. BIKE/PED SUBCOMMITTEE OVERVIEW
The topic was postponed until the November meeting.
Page 1 of 2
TIGARD TRANSPORTATION ADVISORY COMMITTEE
October 7, 2015
7. PROJECT UPDATES
The list of updates was provided but not discussed.
8. PLANNING CALENDAR
No discussion.
9. OTHER BUSINESS
None.
10. ADJOURNMENT
Chair Watkins adjouincd the meeting at$:43 pm.
joetvatton,TTAC Meeting Secretary
P
ATTEST; Kevin Watkins,Chair
Page 2 of 2
Figure 1. Flow Chart for Updating&Selecting Uber List
Transportation CIP Projects a. Check for TSP inclusion or compatibility
b. Identify Best Fit Funding Source(BFFS)
1. Maintain Uber List with new c. Categorize Project Service Area
(Type 1)Local Project/Local Funded
projects, completing all required (Type 2)Regional Project/Match Funded
fields (est. 20 min/project) d. Estimate Project Cost and City Cost
e. Categorize Project Type-Primary
2. Screen projects for Financial f. Identify Access Features
Feasibility and Strategic Plan
compatibility
3. Score eligible projects Financial Feasibility Screen
City Cost cannot exceed known capacity of
Tigard's projected share of BFFS within CIL
4. Balance and refresh Qualified List timeframes(15years)
annually
5. Update CIP List biennially
Strategic Plan Compatibility Screen
6. Recommend/adopt updated Enhances walkability,or helps people of all ages
Transportation CIP and abilities enjoy healthy,interconnected lives
Score QL-Eligible Projects Qualified List Financially Strategic Plan
(30 point scale) Eligible / \ Infeasible Incompatible Re-Scope
Safety Project(automatic prioritization)
Size/Select/Update Qualified List Annually
Project Factor 1: In Plan (0-3 pts)
Total Value of Tl Projects+
PF 2:Walk Along(-1—3 pts) / Match Value of T2 Projects=
2.5 x Current 6 Year CIP Revenue Forecast
PF 3:Walk Across(-1—6 pts)
PF 4:Connectivity(0-3 pts)
PF 5: Intersection Relief(0-3 pts) Check for Project Diversity and Balance
Project Types;#of Local Projects,#of Grant Projects
Location Factor 1:Corridor Demand(0-3 pts)
LF 2: Solution Impact(0-3 pts)
Update Forecast, Resources,
Access Factors(0-6 pts) Draw New CIP Cut Line Biennially
School/Public Building Parks Transit Network
Bike Network Commercial Area Opportunity/Equity
Develop/Update CIP List Biennially
7 with New CIP-Ready Projects
To be recommended to TTAC,TST,Budget Committee,
City Council
FY 17-22 Transportation CIP: Proposed Qualified List
Version 1.1 10/7/2015
Type: BFF-Best Fit
Name Description Project Cost City Cost Local(1)/Regional Funding Source Notes
(2)
Pavement Management Program(PMP) Annual program $1,830,000 $1,830,000 1 `%11' un capturlag r1.,as is n fisted in Le CIP.
Annual budget increases each year.
Hall Blvd/PfafGe St Traffic Signal Install new traffic signal;maintain existing lane $600,000 $180,000 2 ACTS
configuration
Bonita/Sequoia Intersection Traffic Signal $1,000,000 $300,000 2 ACTS
Add'schoo120 when Gashing signs at ES and HS;
Durham Rd School 20 when Gashing change school zone from 7am to 5pm to only when $150,000 $150,000 1 Local
Gashing
Outcome of si a trai gap project car likely
Program:Walkability/BikeabilitySmall A program is recommended in which funds are set drive this.Planning for this tobe an annual
Projects Program aside for smaller projects benefiting pedestrians $5,000,000 $5,000,000 1 Local program of about$300K/year.This amount
and cyclists. covers the entire 12-15 year period for the
ru,I tied list
North Dakota St(Fanno Creek)Bridge Replace with wider bridge with sidewalks and bike $3,000,000 $900,000 2 ODOT Bridge Grant
Replacement lanes.
Tigard St(Fanno Creek)Bridge Replacement Replacement bridge with bike lanes and sidewalks $3,000,000 $900,000 2 COOT Bridge Grant
121st Ave,Whistler to Ti tt Add Sidewalks and Bike Lanes;would complete $3,500,000 $1,050,000 2 MSTIP
pp� sidewalks and bike lanes from Walnut to Gaarde.
Analysis of the 72nd Avenue comdor with specific In lieu of discussing the multiple projects on the
72nd Avenuorrigard Triangle Study focus on the ingress/egress points into the Tigard $250,000 $250,000 1 Local Uber list related to 72nd Avenue,we agree to
Triangle. conduct this study to develop an agreeable
st at
Placeholder for any capital improvements that may
72nd Avenue Improvements(Placeholder) be recommended from the 72nd Avenue/Tigard $2,000,000 $2,000,000 1 Local
Triangle study
In lieu of discussing the multiple projects on the
Internal staff project to analyze the corridor and Uber list related to Hall Boulevard,we agree to
Hall Boulevard Study develop a strategy.May include development of a $30,000 $30,000 1 Local conduct this study to develop an agreeable
strategy.This study will need to collect all we
proposed list of projects to present to ODOT.
know about Hall Boulevard needs,including
work required as a part of the Library project.
Hall Boulevard Improvements(Placeholder) Placeholder for any capital improvements that may $2,000.000 $2,000,000 1 Local
be recommended from the Hall Boulevard Study.
Hunziker St(72nd to 77th)Sidewalk Add sidewalk on north side and Bike lanes; $600,000 $600,000 1 RFFA/Local?
ompleles sidewalk from 72nd to Hall
116th(Tigard-Katherine) New Trail across Summer Creek $200,000 $100,000 2 NIN
Summerlake Trail(segment 2)-Summerlake New trail along Summer Creek from 121st Ave to $800,000 $240,000 1 RFFA/Local?
Park to 121st Summerlake Park
Mike reports that the entire section from
Fanno Creek Trail(Bonita to Durham Rd)•" Bonita Rd to Durham Rd $4,000,000 $1,200,000 2 RFFA Bonita Road to the Tualatin River has various
alignment and right of way issues to solve.We
may be better off turning this into a study.
Barrows Rd Sidewalk on one side from Springwood to Anna $150,000 $150,000 1 Local
North Dakota Sidewalks(Fanno Creek to Greenburg to Fanno Creek Trail $1,000,000 $1,000,000 1 Local
Greenburg Rd)
Westside(Powerline Trail) New Trail along powerlins from Bull Mountain Rd to $4,000,000 $1,200,000 2 RFFA
Barrows Rd
Uber definition:"Sidewalk/Separated Trail along
Tigard St(Gallo to Fanno Creek) south side"NEW DEFINITION:Half-street $1,800,000 $1,800,000 1 Local Will need a fresh engineer's estimate
improvement adjacent to Dirksen Nature Park,as
required by nditi n of approval.
Dirksen-121st Ave Trail New imil along Summer Creek from Dirksen Nature $1,000,000 $300,000 1 Local
Park to 121 at Ave
Scoffins(Hall to Ash) Add sidewalks $1,000,000 $300,000 1 Local
Commercial Street Sidewalk from 951h to Lincoln $200,000 $60,000 2 CDBG
Fenno Creek Trail(Tiedeman Crossing Realigln trail east of Tiedeman with new bridge
Realignment) ss Fanno Creek so it intersects Tiedeman at $200,000 $60,000 2 NIN
the cross it
Hunziker Core Industrial Street New street from Hunziker to Tech Center Drive. $5,000,000 $10,000 2 EDA Grant Need engineer's estimate,especially to verify
anticipated city costs.
Incurrent CIP.Completes full-street improvements
Walnut Street Improvements between 116th Avenue and Tiedeman Street. $7,000,000 $657,000 2 Local In current CIP.Completion in FY 2017.
Project is managed by WACO.
Tiedeman Avenue Sidewalk d St.to
(Tiger In cunent CIP.Project will result in a new sidewalk
In current CIP.Slated for FYs 19 and 20.
Greenburg Road) and a bike lane from Tigard Street north along the $995,000 $995,000 1 Local Should this one be re-scored?
east side of Tiedeman Avenue to Greenburg Road.
In
rent"I"
STI Pr Enhance Project where STIP will cover
Commercial Street Sidewalk and Storm
In current CIP.Sidewalk along one side of Committed Funds $1305000.$50,000 needed from city
Detention Facility(Main to Lincoln) Commercial Street,from Main Street under the $1,769,000 $50,000 2 (STIP) transportation funds(currently unfunded
Pacific Highway overcrossing to Linton Avenue. NOTE:This is the project that previously
"disappeared"that one councilor raised as a
In current CIP for FY 17 and FY 18.There is
Continues the improvements from the railroad Committed Funds $1,234,424 remaining as part of the MTIP grant.
Main Street Green Street Retrofit(Phase 2) tracks to Scoffns Street. $2.961,000 $1,202,300 2 (MTIP) City portion is currently unfunded.Should this
an,be ho-ored?
This is a near-term project,according to the RT
Upgrade to urban standards from Scholls Ferry Committed Funds Funding Strategy for Phases 1 and 2(inside the
Roy Rogers Road Road to Beef Bend Road. $35,000,000 $8,000,000 2 (MSTIP) UGB).Strategy also says that developers could
get SDC credits for their contributions toward
these phases.Add this projrect to the Uber list.
Tigard Street Trail(along Portland&Western Connect Oregon This is or a permanentpenes rran r ra
ark
r
Rail) Main Street to Tiedeman Avenue $1,250,000 $375,000 2 Grant along this comdor,including linear p
amenities.
Other projects may be added to balance the full
TBD qualified list once rating/ranking process has been $2,000,000 $2,000,000 TBD TBD
Total of draft qualified list $47,480,000 $33,059,300
Uber List
Type: BFF-Best Fit Access
Name Description Project Cost Baseline Local(1)/Re TSP Funding Source City Cost Category (School/Parks/Comme
gional(2) rcial)
Murdock(East Butte to Templeton) Sidewalk $1,500,000 yes 1 X Local $1,500,000 Walk School/Park
Atlanta Street extension Extend Atlanta Street west to Dartmouth Street $4,000,000 yes 2 MSTIP $400,000 Connectivity Commercial
Walnut to Ash Street Extension Extend Walnut east of OR 99W to meet Ash Avenue. $12,000,000 yes 2 X MSTIP $1,200,000 Connectivity Commercial/Park
Fonner St(Walnut to 115th) Complete sidewalk on one side $2,000,000 yes 1 Local $2,000,000 Walk School/Parks
Bull Mtn Rd at Price Park and School Enhanced crosswalk between Alberta Rider School $100,000 yes 1 Local $100,000 Walk School/Parks
and Price Park
78th Ave(Pfaffle to Spruce) Sidewalk $800,000 yes 1 X Local $800,000 Walk Commercial
Greenburg/N Dakota Intersection geometry Aker realignment of Tiedeman,realign remaining legs $3,500,000 yes 2 X MSTIP $350,000 Connectivity
improvements to conventional form.
Hall/Hunziker/Scoffins intersection Realignment Realign offset intersection to cross intersection to $5,000,000 yes 2 X MSTIP $500,000 Connectivity Commercial
alleviate congestion and safety issues.
Wall Street New street from Hunziker to Tech Center $5,000,000 yes 2 EDA Grant $10,000 Connectivity Commercial
79th Ave(Bond to Bonita) Sidewalk and bike boulevard treatments $2,000,000 yes 1 Local $2,000,000 Walk
Krueger Creek&Summer Creek Summer Creek Trail to mary Woodward School $500,000 yes 1 Local $500,000 Trail School/Park
Park St(99W to Watkins) Add sidewalks and bike lanes $750,000 yes 1 Local $750,000 Walk School/Commercial
Washington Square Loop Trail Highway 217 to Hall Blvd Sidewalk and Bikeway $700,000 yes 2 Connect Oregon $70.,000 Trail Commercial/Transit
Hwy 217 Ped/Bike Over Crossing Washington New pedestrian and bicycle bridge over Hwy 217 $3,700,000 yes 2 MSTIP $370,000 Trail Commercial
Square Regional Center from Nimbus Avenue to Scholls Ferry Road
Ash Ave Extension(Burnham to Commercial) Extend Ash Avenue across the railroad tracks from $10,000,000 yes 2 X SW Corridor Bond $1,000,000 Connectivity Commercial
Burnham to Commercial Street.
68th/Atlanta/Haines Install a traffic signal and add turn lanes where $500,000 yes 2 SW Corridor Bond $50,000 Congestion-ITS Commercial
necessary
Red Rock Creek Greenway New trail parallel to and south of 99W in triangle $3,000,000 yes 2 Connect Oregon $900,000 Trail Commercial
North Dakota/Tiedeman Realignment Realign one street to meet the other west of the $10,000,000 yes 2 X MSTIP $1,000,000 Connectivity Commercial
railroad
Steve St to 84th Ave $336,000 yes 1 CDBG $336,000 Trail Park
Add sidewalks and bike lanes;Install bike boulevard
Frewing St(99W to O'Mara) treatments on both sides of the street from Highway $400,000 yes 1 X. Local $400,000 Walk School/Commercial
99W to O'Mara Street
100th Ave Pathway through S-Curves $100,000 yes 1 Local $100,000 Walk School
Greenburg?Raised Pedestrian Refuge and Marked Improve signing and striping at the existing signalized $130,000 yes 1 CDBG $130,000 Walk Commercial
Crosswalk crosswalk;raise and upgrade existing refuge island
1
Uber List
Murdock St ext to Hwy 99W New Trail $120,000 yes 1 CDBG $120,000 Connectivity
Tigard Triangle Signals Future Adaptive Signal Coordination $1,000,000 yes 2 RFFA $100,000 Congestion-ITS Commercial
Washington Square Loop Trail Fanno Creek to Hwy 217 Sidewalk and Bikeway $200,000 yes 2 CDBG $60,000 Trail
Improvements
103rd Ave(McDonald to View Terr) Sidewalk $1,500,000 yes 1 X Local $1,500,000 Walk Park
Washington Square Area Signals Adaptive Signal Coordination $1,000,000 yes 2 RFFA $100,000 Congestion-ITS Commercial
Tigard Trail along Portland&Western Rail Trail Main St to Tiedeman Ave $1,250,000 yes 2 X Connect Oregon $375,000 Trail Commercial
Walnut Street to North Dakota Street—two lanes
121st Street(Walnut to North Dakota) with turn lanes where necessary plus bike lanes and $6,000,000 yes 2 MSTIP $600,000 Congestion-Lanes
sidewalks
98th(Commercial to Greenburg) Sidewalk $500,000 yes 1 Local $500,000 Walk Commercial
Watkins St(Park to Walnut) Add sidewalks and bike lanes $1,000,000 yes 1 Local $1,000,000 Walk
115th(Genesis to Former) Sidewalk one side $100,000 yes 1 Local $100,000 Walk School
Tualatin River Trail 108th Ave Grading and Existing Trail Improvements $250,000 yes 1 RFFA $250,000 Trail
O'Mara St(Hall to McDonald) Sidewalk $2,000,000 yes 1 Local $2,000,000 Walk School/Parks
100th Ave(McDonald to Kable or Murdock) Sidewalk/or Speedhumps $2,000,000 yes 1 X Local $2,000,000 Walk School
Hunziker Link to Lake Oswego Linkage to Kruse Way Trail in Lake Oswego $2,010,000 yes 2 $603,000 Trail
Hwy 99W/Bull Mountain Rd.intersection Turn lanes,aux lanes,sidewalks,bike lanes, $5,000,000 yes 2 $1,500,000 Congestion-Lanes Commercial
improvements(NB left turn lane) crossings
Provide Arterial Corridor Management on 72nd
72nd Avenue Avenue along Corridor#2(1-5)(1-5)near the Upper $1,600,000 yes 2 X $480,000 Congestion-ITS
Boones Ferry Road Interchange in the Metro TSMO
Broadmoor-Rockingham Trail from Broadmoor PI to Rockingham Dr $75,000 yes 1 $75,000 Trail
92nd Ave(Durham to Waverley) Add sidewalk one side $1,000,000 yes 1 $1,000,000 Walk School
North Dakota St/Fanno Creek Replace with wider bridge with sidewalks and bike $3,000,000 yes 2 $900,000 Walk
lanes
Ascension Trail Ascension Trail Improvements $500,000 yes 1 $500,000 Trail
Hwy 99W Provide Arterial Corridor Management from $3,400,000 yes 2 $1,020,000 Congestion-ITS
Downtown Portland to Highway 217
Hwy99W Provide Arterial Corridor Management from Highway
$4,200,000 yes 2 $1,260,000 Congestion-ITS
217 to 124'Avenue
2
Uber List
Durham Road Provide Arterial Corridor Management along Corridor $1,400,000 yes 2 $420,000 Congestion-ITS School/Park
#2(1-5)in the Metro TSMO Plan
Durham Road Provide Arterial.Corridor Management along Corridor $1,500,000 yes 2 $450,000 Congestion-ITS School/Park
#19(Hwy 217)in the Metro TSMO Plan
Pathfinder-Genesis Trail Fanno Creek Trail to Pathfinder Ct Trail $715,000 yes 2 $214,500 Trail
Scholls Ferry Rd/North Dakota St/125th Ave Intersection Improvement $1,500,000 yes 2 $150,000 Intersection-Lanes
Gaarde-Quail Creek Trail from Gaarde St to Quail Creek Ln $50,000 yes 2 X $15,000 Trail
115th(Fonner to Fairview) Add sidewalk on west side $2,000,000 yes 2 $600,000 Walk
72nd Avenue Provide Arterial Corridor Management along Corridor $1,700,000
#19(Hwy 217)(Hwy 217)in the Metro TSMO Plan yes 2 $510,000 Congestion-ITS Commercial
Hall Boulevard Add an eastbound through lane on Hall Blvd.from $500,000 yes 2 $150,000 Congestion-Lanes
Pamelad Road to Greenburg Road
rovitle Arterial Corridor Management and Transit
Hall Boulevard Signal Priority on Hall Boulevard from Highway 217 to $3,700,000 yes 2 $1,110,000 Congestion-ITS
Hinhw v QQW
Hwy 217 NB Ramps/Highway 99W Add a second northbound left turn lane $1,500,000 yes 2 $450,000 Congestion-Lanes
Upper Boones Ferry Road. Provide Arterial Corridor Management along Corridor $1,300,000 yes 2 $390,000 Congestion-ITS
#2(1-5)in the Metro TSMO Plan
98th(Murdock to Sattler) Sidewalk $600,000 yes 1 $600,000 Walk School
Ash Ave(Fanno Creek-McDonald) Sidewalk $2,000,000 yes 1 X $2,000,000 Walk Commercial
97th Avenue Install sidewalk on both sides of street from $1,000,000 yes 2 $300,000 Walk School
McDonald.Street to Murdock Street
Scholls Ferry Rd Provide Arterial Corridor Management from River $4,200,000 yes 2 $1,260,000 Congestion-ITS
Road to Hall Boulevard
Bull Mtn Rd/Benchview/139th Roundabout $3,000,000 yes 2 X $300,000 Intersection-Lanes
Warner St extension Connect Warner St to Hall;include sidewalks and $500,000 yes 1 X $500,000 Connectivity
bike lanes
Hall Boulevard Provide Arterial Corridor Management from Highway $1,900,000 yes 2 $570,000 Congestion-ITS
99W to the south terminus
Hwy 99W/Dartmouth St. Turn lanes,aux lanes,sidewalks,bike lanes, $6,000,000 yes 2 $1,800,000 Congestion-Lanes Commercial
crossings;transit improvements
Street
Tigard Install sidewalks on both sides of the street from $970,000
9 115th Avenue to Highway 99W yes 2 $291,000 Walk Commercial
72nd/Upper Boones Ferry(Carman) Intersection Improvement $1,000,000 yes 2 $100,000 Congestion-Lanes
Hwy 217 NB On-ramp/Scholls Ferry
Road/Washington Square Road Interchange Intersection Improvement $750,000 yes 2 $75,000 Intersection-Lanes
Improvement
Benchview Terrace Install sidewalk on both sides of street from $280,000 yes 1 $280,000 Walk
Greenfield Drive to Bull Mountain Road
3
Uber List
Hwy 217 SB Ramps/Highway 99W Intersection Capacity Improvements including 2nd $2,500,000 yes 2 $750,000 Congestion-Lanes
right turn lane from off ramp
Implement access management strategies and
Hwy 99W Access Management median projects identified in the Highway 99W Plan $20,000,000 yes 2 $6,000,000 Congestion-ITS
(related to roadway project#66)
Hwy 99W Bike Lanes Fill in gaps in Bike lanes along Hwy 99W $500,000 yes 2 $150,000 Bike
Upper Boones Ferry Road Install bike lanes on both sides of street from 1-5 to $1,000,000 yes 2 $300,000 Bike
Durham Road
Hwy 99W/68th Ave Intersection Improvements.Provide protected left at $4,000,000 yes 2 $1,200,000 Congestion-ITS Commercial
68th;transit queue bypass
O'Mara Street Install bike boulevard treatments on both sides of the $60,000 yes 1 $60,000 Bike
street from McDonald Street to Hall Boulevard
Install bike boulevard treatments on both sides of the
Fanno Creek Drive street from the Fanno Creek Trailhead to Bonita $100,000 yes 1 $100,000 Walk School
Road
Tiedeman Street/Tigard Street Install a traffic signal;construct left-turn lanes, $1,000,000 yes 2 $300,000 Congestion-ITS
sidewalk,and bike lanes
Benchview Terrace Install bike boulevard markings and treatments $120,000 yes 1 $120,000 Bike
Greenfield Drive Install bike boulevard markings and $90,000 yes 1 $90,000 Bike
Tiedeman at Fanno Creek Trail Realign Trail for direct crossing $200,000 Committed Funds 2 NIN $60,000 Trail
Provide 2 travel lanes,tum lanes where necessary,
Main Street Green Street(Phase 11) on-street parking,good sidewalks,and lots of
pedestrian-friendly amenities on Main Street from the $2,000,000 Committed Funds 2 X RFFA $600,000 Walk Commercial
railroad tracks north to Highway 99W
Tiedeman Ave Sidewalks from Tigard St to Greenburg Rd $1,000,000 Committed Funds 1 X Local $1,000,000 Walk Commercial
Walnut St(116th to Tiedeman) Add middle turn lane and bike lanes and sidewalks $8,000,000 Committed Funds 2 MSTIP $800,000 Congestion-Lanes School/Parks
Fanno Creek Trail(Woodard to Grant) Woodard Park to Grant $670,000 Committed Funds 2 X RFFA $67,000 Trail Park/Commercial
Commercial St(Lincoln to Main under 99W) Install sidewalks on NE side of the street from Main $1,000,000 Committed Funds 2 STIP $100,000 Walk Commercial
Street to Lincoln Street
Fanno Creek Trail(Library to Bonita) Library to Milton Ct/Bonita Rd $2,000,000 Committed Funds 2 RFFA $600,000 Trail
Fanno Creek Trail(Durham to Tualatin River) Durham Rd to Tualatin River Trail $1,500,000 Committed Funds 2 X RFFA $150,000 Trail School/Parks
Fanno Creek Trail(Hall to Main) New bridge over Fanno Creek;facilitates CWS creek $1,000,000 Committed Funds 2 X RFFA $300,000 Trail Commercial
remeander
Roy Rogers Rd.widening to 5 Ln.from N of Scholls $35,000,000 Committed Funds 2 MSTIP Bond(fDT $3,500,000 Congestion-Lanes School
Ferry Rd.to S.of Beef Bend Rd.
Roy Rogers Road/Bull Mountain Rd traffic signal $1,000,000 Committed Funds 2 MSTIP Bond/TDT $100,000 Intersection-ITS
Roy Rogers Road/E-W collector traffic signal $1,000,000 Committed Funds 2 MSTIP Bond/TDT $100,000 Intersection-ITS
4
Uber List
Roy Rogers Road/Lorenzo Ln.extension traffic $1,000,000 Committed Funds 2 MSTIP Bond/TDT $100,000 Intersection-ITS
signal
Scholls Ferry Road/N-S collector traffic signal $1,000,000 Committed Funds 2 MSTIP Bond/TDT $100,000 Intersection-ITS
161st Ave.from Woodhue St.extension to Beef New complete street $3,500,000 Committed Funds 2 Developer,TDT, $350,000 Connectivity
Bend Rd. TSDC
Bull Mountain Rd./N-S collector intersection $1,500,000 Committed Funds 2 Developer,TDT, $150,000 Connectivity
TSDC
River Terrace Blvd/E-W collector intersection or $2,000,000 Committed Funds 2 Developer,TDT, $200,000 Connectivity
roundabout TSDC
Lorenzo Ln.from Roshak Rd.to Roy Rodgers Rd. $3,500,000 Committed Funds 2 Developer,TDT, $350,000 Connectivity
TSDC
Lorenzo Ln.from West UGB to Roy Rodgers Rd. $2,500,000 Committed Funds 2 Developer,TDT, $250,000 Connectivity
TSDC
River Terrace Blvd from Bull Mountain Rd.to the $18,750,000 Committed Funds 2 Developer,TDT, $1,875,000 Connectivity Park
south UGB TSDC
River Terrace Blvd from Lorenzo Ln.extension to $11,000,000 Committed Funds 2 Developer,TDT, $1,100,000 Connectivity
Bull Mountain Rd. TSDC
River Terrace Blvd from Scholls Ferry to Lorenzo $14,250,000 Committed Funds 2 Developer,TDT, $1,425,000 Connectivity
Ln.extension TSDC
River Terrace Improvements where new streets Developer,TDT,
meet existing streets(Collectors) $500,000 Committed Funds 2 TSDC $50,000 Intersection-Lanes
River Terrace Improvements where new streets $2,000,000 Committed Funds 2 Developer,TDT, $200,000 Intersection-Lanes
meet existing streets(Neighborhood) TSDC
River Terrace southern east-west collector between $2,500,000 Committed Funds 2 Developer,TDT, $250,000 Connectivity
Roy Rodgers Rd.and N-S collector TSDC
River Terrace Trail from Roy Rodgers Rd,to 150th $3,600,000 Committed Funds 2 Developer,TDT, $360,000 Trail
Ave. TSDC
Woodhue St./161st Ave.extension intersection or $2,000,000 Committed Funds 2 Developer,TDT, $200,000 Connectivity
roundabout TSDC
Walnut St/135th Ave Intersection Construct signal or roundabout $1,000,000 Committed Funds 2 X MSTIP $100,000 Intersection-ITS
Improvements to distribute east/west traffic between
Oak-Lincoln-Locust Street Collector Locust and Oak Streets and improve accessibility to
System(Washington Square Connectivity Lincoln Center commercial district.Includes Lincoln $3,000,000 Committed Funds $3,000,000 Connectivity School/Commercial
Improvements) Street extension to Oak Street.(Lincoln Street
portion anticipated to be constructed by
development)
Tigard Connector Service in the Tigard Triangle Local transit connector service within Tigard Triangle, $10,000,000 Major Regional Transit Commercial
downtown,and perhaps Washington Square areas
High Capacity Transit Planning Planning and Alternatives Analysis for HCT $5,000,000 Major Regional Transit
Add a southbound through lane on Hwy 217 at the
Hwy 217 Southbound Aux Lane current capacity pinch point under the Allen and $20,000,000 Major Regional Congestion-Lanes
Denney overpasses
Hwy 217 Northbound Aux Lane Add a northbound through lane under the Hwy 99W $20,000,000 Major Regional Congestion-Lanes
overpass to address a capacity pinch point
WES Increased Service Transit Service Improvement $100,000,000 Major Regional Transit
I-5/Hwy 217 interchange from 72nd Ave toBangy Interchange Improvement $81,500,000 Major Regional Intersection-Lanes
Road
1-5/Upper Boones/Carman Interchange Add tum lanes and/or auxiliary through lanes,
sidewalks,etc $10,000,000 Major Regional Intersection-Lanes
Greenfield ext;Ridgefield Dr to Chirp St New trail and bridge $400,000 rescope 1 Local $400,000 Trail School/Park
5
Uber List
Extend 68th Avenue south to Hwy 217 providing right
68th Avenue in/right-out only acces to 68th Avenue from Hwy 217, $15,000,000 rescope 2 $1,500,000 Connectivity Commercial
replacing the NB ramps to 72nd at Hwy 217??
72nd Ave.Improvements(Hunzikerto Bonita) Widen to 5lanes with bikeways and sidewalks $28,166,850 rescope 2 X $2,816,685 Congestion-Lanes
Nimbus Road Extension Extend Nimbus Road south to Greenburg Road(or $30,000,000 rescope 2 $3,000,000 Connectivity
Tiedeman)
Greenburg Rd(Tiedeman to 217) Add northbound travel lane;bike lanes;sidewalks; $7,000,000 rescope 2 $700,000 Congestion-Lanes
second left tum lane from Tiedeman
Hall Boulevard Widening,Highway 99W to Preserve ROW for potential 3 lanes plus on-street
McDonald St parking or 5 lanes);build sidewalks and bike lanes; $6,000,000 rescope 2 $600,000 Congestion-Lanes School
safety improvements
Hall Blvd/Fanno Creek Bridge Replace with wider bridge with sidewalks and bike $6,000,000 rescope 2 $600,000 Walk
lanes
Widen to five lanes with bike lanes and sidewalks;
72nd Avenue Widening:Elmhurst to Hunziker includes bridge widening and possible interchange $25,000,000 rescope 2 X $2,500,000 Congestion-Lanes Commercial
improvements
McDonald St(Hall to 99W) Widen to three lanes with bike lanes and sidewalks $8,000,000 rescope 2 X $800,000 Congestion-Lanes
Hwy 217/72nd Ave Interchange Improvements Complete interchange reconstruction with additional $19,500,000 rescope 2 $1,950,000 Intersection-Lanes
ramps and overcrossings.
Upper Boones(Durham to Sequoia) Widen to five lanes with bike lanes and sidewalks $10,000,000 rescope 2 X $1,000,000 Congestion-Lanes
Bull Mountain Road(Hwy 99W to Benchview Terr) Widen to three lanes with bike lanes and sidewalks $8,000,000 rescope 2 $800,000 Congestion-Lanes
Turn lanes,aux lanes,sidewalks,bike lanes,
Hwy 99W/72nd Ave Intersection crossings;transit improvements $8,000,000 rescope 2 $800,000 Congestion-Lanes Commercial
Construct intersection improvements at Durham
Road and Upper Boones Ferry Road to provide dual
Durham Road at Upper Boones Ferry Road southbound right-tums,dual eastbound left-turns, $4,000,000 rescope 2 $400,000 Congestion-Lanes
eastbound right-turns,existing and improve signal
timing.
Widen to 5 lanes from Locust St to Greenburg Rd;
Greenburg Rd.(Hwy 217 to Hall Blvd) add tum/aux lanes;add bike lanes and sidewalks $20,000,000 rescope 2 $2,000,000 Congestion-Lanes
throughout corridor
Widen to 5 lanes with bike lanes,sidewalks,and
72nd Avenue Widening:Hwy 99W to Dartmouth intersection improvements(2015-2019 CIP does not $10,000,000 rescope 2 $1,000,000 Congestion-Lanes Commercial
state"widen")
Hwy 217 Over-crossing at Washington Square Provide a new full street connection from Nimbus to $25,000,000 rescope 2 $2,500,000 Connectivity
Regional Center-Cascade Plaza Locust
Walnut St(Tiedeman to Hwy 99W) Widen to 3 lanes+bike lanes and sidewalks;add $8,000,000 rescope 2 X $800,000 Congestion-Lanes School
tum lanes at 99W
6
Uber List
Widen to 4/5 lanes;build sidewalks and bike lanes;
Hall Boulevard Widening,Bonita Road to Durham safety improvements(construct 3 lanes with $3,000,000 rescope 2 $300,000 Congestion-Lanes
development,preserve ROW for 5 lanes)
Scholls Ferry Rd ROW preservation,Barrows to ROW preservation for potential 7 lanes(both dir)
121st between OR 217 and 121st Avenue and improve $8,000,000 Incompatible Congestion-Lanes
intersections
Hall Boulevard Widening,McDonald Street to Widen to 3 lanes plus auxiliary Ianes;Preserve ROW
Bonita Road for 5lanes;build sidewalks and bike lanes;safety $8,000,000 Incompatible X Congestion-Lanes School/Parks
improvements
Hall Blvd(Bonita to Durham) Widen to three lanes,bike lanes,sidewalks; $3,000,000 Incompatible X Congestion-Lanes
intersection imprvmts
Hwy 99W/Walnut St.Intersection improvements Turn lanes,aux lanes,sidewalks,bike lanes,
(additional tum lanes) crossings;transit improvements $10,000,000 Incompatible Intersection-Lanes
Hwy 99W/Durham Rd.intersection improvements Turn lanes,aux lanes,sidewalks,bike lanes, $10,000,000 Incompatible X Intersection-Lanes
(additional tum lanes) crossings;transit improvements
68th Avenue Widen to 3 lanes between Dartmouth/1-5 Ramps and $3,000,000 Incompatible Connectivity Commercial
south end
Retain eastbound right-turn lane when 3rd lane
added on Scholls Ferry Rd;Retain westbound right-
Scholls Ferry/Nimbus Intersection Improvements turn lane when 3rd lane added on Scholls Ferry Rd; $6,000,000 incompatible Congestion-Lanes
southbound right-tum lane;Reconfigure northbound
and southbound lanes to create exclusive left-tum
lanes
McDonald/Hall RT Lane. Lengthen eastbound right tum lane from McDonald $200,000 Incompatible X Congestion-Lanes School
onto Hall
Greenburg Rd(Shady to 217) Add third lane $8,000,000 Incompatible Conestion-Lanes
2nd Northbound lane,modify signal timing at
Greenburg Intersection Improvements Greenburg/Oleson/Hall;install boulevard treatment at $8,000,000 Incompatible Congestion-Lanes
Greenburg/Washington Square Road
Hwy 217 over-crossing-Hunziker-Beveland Connect Hunziker Road to 72nd Avenue—requires
Connection over-crossing over ORE 217—removes existing 72nd $50,000,000 financially infeasible 2 $15,000,000 Connectivity
Avenue/Beveland intersection
Pfaffie-North Dakota east-west connection with Hwy
North Dakota-Pfaffie Highway 217 over crossing 217 over-crossing to provide a neighborhood route $20,000,000 financially infeasible 2 $6,000,000 Connectivity
(See projects 12,13).
Ash Ave Extension(Maplewood to Burnham) Extend Ash Avenue from Maplewood,across Fanno $10,000,000 financially infeasible 1 $10,000,000 Connectivity Commercial
Creek,to Burnham.
72nd Ave.Improvements(Bonita to Durham) Widen to 5 lanes with bikeways and sidewalks $15,425,000 financially infeasible 2 X $4,627,500 Congestion-Lanes
Durham Road Improvements(Hall Blvd to Hwy Widen to five lanes with bike lanes,sidewalks,and $25,000,000 financially infeasible 2 X $7,500,000 Congestion-Lanes School
99W) extra turn lanes where needed
Greenfield Drive Connection Connect street across ravine from Bull Mountain Rd $8,000,000 financially infeasible 1 $8,000,000 Connectivity
to Benchview Terr
7
Uber List
95th-Grant Connection Bridge over railroad tracks $10,000,000 financially infeasible 1 $10,000,000 Walk
2:North Dakota/Greenburg realignment—purchase
North Dakota-Pfaffle Neighborhood Route existing building to make N.Dakota a continuous
(Tiedeman Realignment,North Dakota/Greenburg east-west street,Realign Tiedeman to intersect with $10,000,000 financially infeasible 2 $3,000,000 Connectivity
intersection reconstruction) North Dakota and close the Tiedeman railroad
crossing.Reconstruct North Dakota/Greenburg
intersection
Northern Washington Square Regional Center New Road $30,000,000 financially infeasible 2 $9,000,000 Connectivity Commercial
Crossing
Wall Street connection New roadway connecting Hunziker St and Hall $15,000,000 financially infeasible 2 $4,500,000 Connectivity
Boulevard
Durham Road Improvements(Upper Boones Ferry Widen to five lanes with bike lanes,sidewalks,and $20,000,000 financially infeasible 2 $6,000,000 Congestion-Lanes School
Rd to Hall Blvd) extra turn lanes where needed
Bonita Road Widening Widen to 5-lanes with bike lanes and sidewalks from $20,000,000 financially infeasible 2 X $6,000,000 Congestion-Lanes
Hall Blvd to 1-5 Bridge
North Dakota Street Railroad Overcrossinq Grade-Separated Crossinq $5,000,000 financially infeasible $5,000,000 Intersection-Lanes
Construct a new road that extends from Dartmouth
Dartmouth Street Extension to Hunziker Street in the Tigard Triangle,over Hwy 217,to $58,690,000 financially infeasible 2 $17,607,000 Connectivity
Hunziker
Hall Boulevard extension Extend south to Tualatin across the Tualatin River $60,000,000 financially infeasible 2 $18,000,000 Connectivity
Durham Road Realignment at Upper Boones Ferry Realign/reconfigure Durham Road.,Upper Bcones
Road intersection Ferry Road intersections/roadway to accommodate $15,000,000 financially infeasible 2 $4,500,000 Connectivity
traffic flow between Durham Road and Interstate 5.
Greenburg Road(Hwy 99W to Tiedeman) Widen to five lanes with sidewalks and bike $16,000,000 financially infeasible 2 $4,800,000 Congestion-Lanes
IanesTiedeman Ave.
Scholls Ferry Rd Widening,Hwy 217 to 121st Widen to 7 lanes with bike lanes and sidewalks $25,000,000 financially infeasible 2 $7,500,000 Congestion-Lanes
Widen bridge to 6 lanes(2-1-1-2?)or(2nd
Upper Boones/Carman at 1-5 northbound westbound through lane;2nd northbound left-tum $20,000,000 financially infeasible 2 $6,000,000 Congestion-Lanes
lane;eastbound separate through and left-turn lanes)
Beef Bend Road Add Sidewalks and bike lanes $3,000,000 Not in Tigard Walk
Tualatin River Trail 108th Ave to Pacific Hwy Extension $2,500,000 Not in Tigard Trail Park
Taylors Ferry Road Extension Extend to Oleson Road $4,390,000 Not in Tigard Connectivity
Taylor's Ferry Rd Install sidewalks on both sides of the street from
Ta
y ry Washington Drive to 62nd Avenue $3,220,000 Not in Tigard Walk
150th Ave.from Bull Mountain Rd.to Beef Bend Street widening with bike lanes and sidewalks $4,000,000 Not in Tigard Walk School
Rd.
Bull Mountain Rd.from Roy Rodgers Rd.to Roshak
Rd. $4,000,000 Not in Tigard Walk
Hwy 99W,Sidewalks Complete gaps in sidewalk south of King City Town $1,070,000 Not in Tigard Walk Commercial
Center
Tualatin River Trail Complete multiuse path from Cook Park to the $10,000,000 Not in Tigard Trail School
Poweriines Corridor
Highway 217 SB/Hall Blvd Interchange SB right-turn lane at Hall Blvd/OR 217 ramp $5,000,000 Not in Tigard Congestion-Lanes
Improvements
City CouncilmTTAC Meeting
TTAC Meeting
October 7, 2014
Review 4 Format
• Individual comments All
• TTAC Year-in- Review Kevin
• Key Points Presentation Kevin/All
Key Points
• Compare 4 hypothetical key points
— Keep Tigard livable
— Upgrade Hall/McDonald intersection in 2016
• Impact?? (Thanks! to "The Nightly Show")
— "Weak tea" or
— "Keep it 100"
Criteria 4 ACTIONABLE
• Relevant to transportation
• Focused/specific
• Address new issue/topic or
• Address treatment of existing issue/topic
• Feasible ( based on budgets/staff/etc. )
KeyPoints " 1St cut " � I St rom 9 2 TTAC meetin(from i g)
• Revise local zoning/land use rules in order to promote connectivity and allow for
shorter trips
• Leverage outside funds in order to develop cost-effective solutions to real
transportation challenges
• Evaluate revenue increases (e.g., +2 cents gas tax)
• Improve East <--4 West traffic routes (e.g., Ash St. Crossing, River Terrace
integration)
• Evaluate potential solutions to local transit challenges (e.g., local transit system
partnerships with other cities)
• Develop forward-looking traffic calming policy that enhances walkability and safety
• Upgrade Hwy 217/72nd Ave. interchange
TTAC 2015 Planning 10/7/2015
Month / Date Actions/Main Points
January 7 Safe Routes to School overview; paving report
February 4 Safety workshop w/Dr. Takallou; elections
March 4 Funding sources overview; project updates
April 1 Gaarde/99W project review; SW Corridor workshop
May 6 SW Corridor update (Metro); SW Service Enhancement Plan (TriMet)
June 3 Traffic calming proposal; Walkable Cities preview
July 1 (Cancelled)
August 5 FY17 CIP planning; Council meeting preparations; N. Dakota Bridge project
September 2 FY17 CIP planning; Hunziker Industrial Core project funding
October 7 FY17 CIP presentation; Council meeting preparations (oct
20th)
November 4 FY17 CIP decisions; FY15 project/budget review
December 2 Safe Routes to School update; SW Corridor update