Loading...
10/07/2015 - Packet ■ Completeness Review for Boards, Commissions and Committee Records CITY OF TIGARD TTAC -Tigard Transportation Advisory Committee Name of Board, Commission or Committee October 7,2015 Date of Meeting I have verified these documents are a complete copy of the official record. Joe Patton,Meeting Secretary Print Name *�Iq gnature November 5, 2015 Date City of Tigard 41 Transportation Advisory Committee Agenda MEETING DATE/TIME: October 7, 2015— 6:30 to 8:30 p.m. MEETING LOCATION: Tigard Library, 2nd Floor Conf. Room, 13500 SW Hall Blvd. 1. CALL TO ORDER Kevin 6:30 Welcome and Introductions 2. CONSIDER MINUTES Kevin 6:35 3. PUBLIC COMMENT Kevin 6:40 4. CIP PRESENTATION &DISCUSSION Staff 6:45 5. "KEY POINTS" REVIEW&EVALUATION Kevin/All 7:30 6. BIKE/PED SUBCOMMITTEE OVERVIEW Ben 8:15 7. PROJECT UPDATES Mike 8:25 8. PLANNING CALENDAR Kevin 8:35 9. OTHER BUSINESS All 8:40 10. ADJOURNMENT Kevin 8:45 Supporting materials/handouts September 2,2015 Minutes Key Points September 2015 Planning Calendar TRANSPORTATION ADVISORY COMMITTEE AGENDA— October 7, 2015 City of Tigard 1 13125 SW Hall Blvd.,Tigard,OR 97223 1 503-639-4171 1 www.tigard-or.gov I Page 1 oft I.-\Community Development\Boards Committees Commissions\TTAC2015\10_0ctober\TlACAgenda 20151007.docx CITY OF TIGARD TIGARD TRANSPORTATION ADVISORY COMMITTEE Meeting Minutes October 7, 2015 Members Present: Kevin Watkins (Chair), Karen Hughart (Vice Chair), Benjamin Gooley,Don Schmidt, Evelyn Murphy,Erik Halstead,Jennifer Stanfield,Mark Bogert, Stephanie McKee,Joseph Vasicek (alternate), Ravi Nagaraj (alternate), and Timothy Esau (alternate). Members Absent: Elise Shearer. Staff Present: Kenny Asher, Community Development Director;Brian Rager, Public Works Director;Buff Brown, Sr. Transportation Planner;Mike McCarthy, Streets and Transportation Sr. Project Engineer; and Joe Patton, Sr. Administrative Specialist. Others Present: City Councilor John Goodhouse,TTAC Liaison; and Alex Hawk,Tigard resident. 1. CALL TO ORDER Chair Watkins called the meeting to order at 6:30 pm. The meeting was held in the Tigard Library, 2"d Floor Conference Room, at 13500 SW Hall Blvd. 2. CONSIDER MINUTES The September 2, 2015 meeting Minutes were approved. 3. PUBLIC COMMENT There was no public comment. 4. CIP PRESENTATION & DISCUSSION Kenny Asher and Brian Rager provided an overview of the staff process of selecting projects for the CIP list,including the Flowchart CIP Project Selection,Transportation Qualified List and the Uber list. TTAC will meet on October 20 before the joint meeting with Council, and after if necessary, to evaluate and rank the projects.After discussion, the Committee decided to send additional questions regarding the CIP projects to Joe and he will ensure the questions and answers are shared with all members. Likewise, any additional documents from staff will be distribution to TTAC by Joe. The Qualified list will be the focus for TTAC,but the Uber list will be reviewed to see if there are projects that should be moved to the Qualified list. The goal then is for TTAC to rank about 15 projects from the Transportation Qualified List for inclusion on the CIP list at the November meeting. 5. "KEY POINTS" REVIEW& EVALUATION After discussion,the consensus is to lead with the Key Points during the joint meeting with Council, followed by a TTAC Year-in-Review (Planning Calendar), and ending with individual comments. The general three key points are: increase transportation funding, develop traffic calming in 12— 15 months, and press Tri Met for specific mass transit improvements. Kevin will refine the general key points into "actionable"items for subsequent review by the Committee. 6. BIKE/PED SUBCOMMITTEE OVERVIEW The topic was postponed until the November meeting. Page 1 of 2 TIGARD TRANSPORTATION ADVISORY COMMITTEE October 7, 2015 7. PROJECT UPDATES The list of updates was provided but not discussed. 8. PLANNING CALENDAR No discussion. 9. OTHER BUSINESS None. 10. ADJOURNMENT Chair Watkins adjouincd the meeting at$:43 pm. joetvatton,TTAC Meeting Secretary P ATTEST; Kevin Watkins,Chair Page 2 of 2 Figure 1. Flow Chart for Updating&Selecting Uber List Transportation CIP Projects a. Check for TSP inclusion or compatibility b. Identify Best Fit Funding Source(BFFS) 1. Maintain Uber List with new c. Categorize Project Service Area (Type 1)Local Project/Local Funded projects, completing all required (Type 2)Regional Project/Match Funded fields (est. 20 min/project) d. Estimate Project Cost and City Cost e. Categorize Project Type-Primary 2. Screen projects for Financial f. Identify Access Features Feasibility and Strategic Plan compatibility 3. Score eligible projects Financial Feasibility Screen City Cost cannot exceed known capacity of Tigard's projected share of BFFS within CIL 4. Balance and refresh Qualified List timeframes(15years) annually 5. Update CIP List biennially Strategic Plan Compatibility Screen 6. Recommend/adopt updated Enhances walkability,or helps people of all ages Transportation CIP and abilities enjoy healthy,interconnected lives Score QL-Eligible Projects Qualified List Financially Strategic Plan (30 point scale) Eligible / \ Infeasible Incompatible Re-Scope Safety Project(automatic prioritization) Size/Select/Update Qualified List Annually Project Factor 1: In Plan (0-3 pts) Total Value of Tl Projects+ PF 2:Walk Along(-1—3 pts) / Match Value of T2 Projects= 2.5 x Current 6 Year CIP Revenue Forecast PF 3:Walk Across(-1—6 pts) PF 4:Connectivity(0-3 pts) PF 5: Intersection Relief(0-3 pts) Check for Project Diversity and Balance Project Types;#of Local Projects,#of Grant Projects Location Factor 1:Corridor Demand(0-3 pts) LF 2: Solution Impact(0-3 pts) Update Forecast, Resources, Access Factors(0-6 pts) Draw New CIP Cut Line Biennially School/Public Building Parks Transit Network Bike Network Commercial Area Opportunity/Equity Develop/Update CIP List Biennially 7 with New CIP-Ready Projects To be recommended to TTAC,TST,Budget Committee, City Council FY 17-22 Transportation CIP: Proposed Qualified List Version 1.1 10/7/2015 Type: BFF-Best Fit Name Description Project Cost City Cost Local(1)/Regional Funding Source Notes (2) Pavement Management Program(PMP) Annual program $1,830,000 $1,830,000 1 `%11' un capturlag r1.,as is n fisted in Le CIP. Annual budget increases each year. Hall Blvd/PfafGe St Traffic Signal Install new traffic signal;maintain existing lane $600,000 $180,000 2 ACTS configuration Bonita/Sequoia Intersection Traffic Signal $1,000,000 $300,000 2 ACTS Add'schoo120 when Gashing signs at ES and HS; Durham Rd School 20 when Gashing change school zone from 7am to 5pm to only when $150,000 $150,000 1 Local Gashing Outcome of si a trai gap project car likely Program:Walkability/BikeabilitySmall A program is recommended in which funds are set drive this.Planning for this tobe an annual Projects Program aside for smaller projects benefiting pedestrians $5,000,000 $5,000,000 1 Local program of about$300K/year.This amount and cyclists. covers the entire 12-15 year period for the ru,I tied list North Dakota St(Fanno Creek)Bridge Replace with wider bridge with sidewalks and bike $3,000,000 $900,000 2 ODOT Bridge Grant Replacement lanes. Tigard St(Fanno Creek)Bridge Replacement Replacement bridge with bike lanes and sidewalks $3,000,000 $900,000 2 COOT Bridge Grant 121st Ave,Whistler to Ti tt Add Sidewalks and Bike Lanes;would complete $3,500,000 $1,050,000 2 MSTIP pp� sidewalks and bike lanes from Walnut to Gaarde. Analysis of the 72nd Avenue comdor with specific In lieu of discussing the multiple projects on the 72nd Avenuorrigard Triangle Study focus on the ingress/egress points into the Tigard $250,000 $250,000 1 Local Uber list related to 72nd Avenue,we agree to Triangle. conduct this study to develop an agreeable st at Placeholder for any capital improvements that may 72nd Avenue Improvements(Placeholder) be recommended from the 72nd Avenue/Tigard $2,000,000 $2,000,000 1 Local Triangle study In lieu of discussing the multiple projects on the Internal staff project to analyze the corridor and Uber list related to Hall Boulevard,we agree to Hall Boulevard Study develop a strategy.May include development of a $30,000 $30,000 1 Local conduct this study to develop an agreeable strategy.This study will need to collect all we proposed list of projects to present to ODOT. know about Hall Boulevard needs,including work required as a part of the Library project. Hall Boulevard Improvements(Placeholder) Placeholder for any capital improvements that may $2,000.000 $2,000,000 1 Local be recommended from the Hall Boulevard Study. Hunziker St(72nd to 77th)Sidewalk Add sidewalk on north side and Bike lanes; $600,000 $600,000 1 RFFA/Local? ompleles sidewalk from 72nd to Hall 116th(Tigard-Katherine) New Trail across Summer Creek $200,000 $100,000 2 NIN Summerlake Trail(segment 2)-Summerlake New trail along Summer Creek from 121st Ave to $800,000 $240,000 1 RFFA/Local? Park to 121st Summerlake Park Mike reports that the entire section from Fanno Creek Trail(Bonita to Durham Rd)•" Bonita Rd to Durham Rd $4,000,000 $1,200,000 2 RFFA Bonita Road to the Tualatin River has various alignment and right of way issues to solve.We may be better off turning this into a study. Barrows Rd Sidewalk on one side from Springwood to Anna $150,000 $150,000 1 Local North Dakota Sidewalks(Fanno Creek to Greenburg to Fanno Creek Trail $1,000,000 $1,000,000 1 Local Greenburg Rd) Westside(Powerline Trail) New Trail along powerlins from Bull Mountain Rd to $4,000,000 $1,200,000 2 RFFA Barrows Rd Uber definition:"Sidewalk/Separated Trail along Tigard St(Gallo to Fanno Creek) south side"NEW DEFINITION:Half-street $1,800,000 $1,800,000 1 Local Will need a fresh engineer's estimate improvement adjacent to Dirksen Nature Park,as required by nditi n of approval. Dirksen-121st Ave Trail New imil along Summer Creek from Dirksen Nature $1,000,000 $300,000 1 Local Park to 121 at Ave Scoffins(Hall to Ash) Add sidewalks $1,000,000 $300,000 1 Local Commercial Street Sidewalk from 951h to Lincoln $200,000 $60,000 2 CDBG Fenno Creek Trail(Tiedeman Crossing Realigln trail east of Tiedeman with new bridge Realignment) ss Fanno Creek so it intersects Tiedeman at $200,000 $60,000 2 NIN the cross it Hunziker Core Industrial Street New street from Hunziker to Tech Center Drive. $5,000,000 $10,000 2 EDA Grant Need engineer's estimate,especially to verify anticipated city costs. Incurrent CIP.Completes full-street improvements Walnut Street Improvements between 116th Avenue and Tiedeman Street. $7,000,000 $657,000 2 Local In current CIP.Completion in FY 2017. Project is managed by WACO. Tiedeman Avenue Sidewalk d St.to (Tiger In cunent CIP.Project will result in a new sidewalk In current CIP.Slated for FYs 19 and 20. Greenburg Road) and a bike lane from Tigard Street north along the $995,000 $995,000 1 Local Should this one be re-scored? east side of Tiedeman Avenue to Greenburg Road. In rent"I" STI Pr Enhance Project where STIP will cover Commercial Street Sidewalk and Storm In current CIP.Sidewalk along one side of Committed Funds $1305000.$50,000 needed from city Detention Facility(Main to Lincoln) Commercial Street,from Main Street under the $1,769,000 $50,000 2 (STIP) transportation funds(currently unfunded Pacific Highway overcrossing to Linton Avenue. NOTE:This is the project that previously "disappeared"that one councilor raised as a In current CIP for FY 17 and FY 18.There is Continues the improvements from the railroad Committed Funds $1,234,424 remaining as part of the MTIP grant. Main Street Green Street Retrofit(Phase 2) tracks to Scoffns Street. $2.961,000 $1,202,300 2 (MTIP) City portion is currently unfunded.Should this an,be ho-ored? This is a near-term project,according to the RT Upgrade to urban standards from Scholls Ferry Committed Funds Funding Strategy for Phases 1 and 2(inside the Roy Rogers Road Road to Beef Bend Road. $35,000,000 $8,000,000 2 (MSTIP) UGB).Strategy also says that developers could get SDC credits for their contributions toward these phases.Add this projrect to the Uber list. Tigard Street Trail(along Portland&Western Connect Oregon This is or a permanentpenes rran r ra ark r Rail) Main Street to Tiedeman Avenue $1,250,000 $375,000 2 Grant along this comdor,including linear p amenities. Other projects may be added to balance the full TBD qualified list once rating/ranking process has been $2,000,000 $2,000,000 TBD TBD Total of draft qualified list $47,480,000 $33,059,300 Uber List Type: BFF-Best Fit Access Name Description Project Cost Baseline Local(1)/Re TSP Funding Source City Cost Category (School/Parks/Comme gional(2) rcial) Murdock(East Butte to Templeton) Sidewalk $1,500,000 yes 1 X Local $1,500,000 Walk School/Park Atlanta Street extension Extend Atlanta Street west to Dartmouth Street $4,000,000 yes 2 MSTIP $400,000 Connectivity Commercial Walnut to Ash Street Extension Extend Walnut east of OR 99W to meet Ash Avenue. $12,000,000 yes 2 X MSTIP $1,200,000 Connectivity Commercial/Park Fonner St(Walnut to 115th) Complete sidewalk on one side $2,000,000 yes 1 Local $2,000,000 Walk School/Parks Bull Mtn Rd at Price Park and School Enhanced crosswalk between Alberta Rider School $100,000 yes 1 Local $100,000 Walk School/Parks and Price Park 78th Ave(Pfaffle to Spruce) Sidewalk $800,000 yes 1 X Local $800,000 Walk Commercial Greenburg/N Dakota Intersection geometry Aker realignment of Tiedeman,realign remaining legs $3,500,000 yes 2 X MSTIP $350,000 Connectivity improvements to conventional form. Hall/Hunziker/Scoffins intersection Realignment Realign offset intersection to cross intersection to $5,000,000 yes 2 X MSTIP $500,000 Connectivity Commercial alleviate congestion and safety issues. Wall Street New street from Hunziker to Tech Center $5,000,000 yes 2 EDA Grant $10,000 Connectivity Commercial 79th Ave(Bond to Bonita) Sidewalk and bike boulevard treatments $2,000,000 yes 1 Local $2,000,000 Walk Krueger Creek&Summer Creek Summer Creek Trail to mary Woodward School $500,000 yes 1 Local $500,000 Trail School/Park Park St(99W to Watkins) Add sidewalks and bike lanes $750,000 yes 1 Local $750,000 Walk School/Commercial Washington Square Loop Trail Highway 217 to Hall Blvd Sidewalk and Bikeway $700,000 yes 2 Connect Oregon $70.,000 Trail Commercial/Transit Hwy 217 Ped/Bike Over Crossing Washington New pedestrian and bicycle bridge over Hwy 217 $3,700,000 yes 2 MSTIP $370,000 Trail Commercial Square Regional Center from Nimbus Avenue to Scholls Ferry Road Ash Ave Extension(Burnham to Commercial) Extend Ash Avenue across the railroad tracks from $10,000,000 yes 2 X SW Corridor Bond $1,000,000 Connectivity Commercial Burnham to Commercial Street. 68th/Atlanta/Haines Install a traffic signal and add turn lanes where $500,000 yes 2 SW Corridor Bond $50,000 Congestion-ITS Commercial necessary Red Rock Creek Greenway New trail parallel to and south of 99W in triangle $3,000,000 yes 2 Connect Oregon $900,000 Trail Commercial North Dakota/Tiedeman Realignment Realign one street to meet the other west of the $10,000,000 yes 2 X MSTIP $1,000,000 Connectivity Commercial railroad Steve St to 84th Ave $336,000 yes 1 CDBG $336,000 Trail Park Add sidewalks and bike lanes;Install bike boulevard Frewing St(99W to O'Mara) treatments on both sides of the street from Highway $400,000 yes 1 X. Local $400,000 Walk School/Commercial 99W to O'Mara Street 100th Ave Pathway through S-Curves $100,000 yes 1 Local $100,000 Walk School Greenburg?Raised Pedestrian Refuge and Marked Improve signing and striping at the existing signalized $130,000 yes 1 CDBG $130,000 Walk Commercial Crosswalk crosswalk;raise and upgrade existing refuge island 1 Uber List Murdock St ext to Hwy 99W New Trail $120,000 yes 1 CDBG $120,000 Connectivity Tigard Triangle Signals Future Adaptive Signal Coordination $1,000,000 yes 2 RFFA $100,000 Congestion-ITS Commercial Washington Square Loop Trail Fanno Creek to Hwy 217 Sidewalk and Bikeway $200,000 yes 2 CDBG $60,000 Trail Improvements 103rd Ave(McDonald to View Terr) Sidewalk $1,500,000 yes 1 X Local $1,500,000 Walk Park Washington Square Area Signals Adaptive Signal Coordination $1,000,000 yes 2 RFFA $100,000 Congestion-ITS Commercial Tigard Trail along Portland&Western Rail Trail Main St to Tiedeman Ave $1,250,000 yes 2 X Connect Oregon $375,000 Trail Commercial Walnut Street to North Dakota Street—two lanes 121st Street(Walnut to North Dakota) with turn lanes where necessary plus bike lanes and $6,000,000 yes 2 MSTIP $600,000 Congestion-Lanes sidewalks 98th(Commercial to Greenburg) Sidewalk $500,000 yes 1 Local $500,000 Walk Commercial Watkins St(Park to Walnut) Add sidewalks and bike lanes $1,000,000 yes 1 Local $1,000,000 Walk 115th(Genesis to Former) Sidewalk one side $100,000 yes 1 Local $100,000 Walk School Tualatin River Trail 108th Ave Grading and Existing Trail Improvements $250,000 yes 1 RFFA $250,000 Trail O'Mara St(Hall to McDonald) Sidewalk $2,000,000 yes 1 Local $2,000,000 Walk School/Parks 100th Ave(McDonald to Kable or Murdock) Sidewalk/or Speedhumps $2,000,000 yes 1 X Local $2,000,000 Walk School Hunziker Link to Lake Oswego Linkage to Kruse Way Trail in Lake Oswego $2,010,000 yes 2 $603,000 Trail Hwy 99W/Bull Mountain Rd.intersection Turn lanes,aux lanes,sidewalks,bike lanes, $5,000,000 yes 2 $1,500,000 Congestion-Lanes Commercial improvements(NB left turn lane) crossings Provide Arterial Corridor Management on 72nd 72nd Avenue Avenue along Corridor#2(1-5)(1-5)near the Upper $1,600,000 yes 2 X $480,000 Congestion-ITS Boones Ferry Road Interchange in the Metro TSMO Broadmoor-Rockingham Trail from Broadmoor PI to Rockingham Dr $75,000 yes 1 $75,000 Trail 92nd Ave(Durham to Waverley) Add sidewalk one side $1,000,000 yes 1 $1,000,000 Walk School North Dakota St/Fanno Creek Replace with wider bridge with sidewalks and bike $3,000,000 yes 2 $900,000 Walk lanes Ascension Trail Ascension Trail Improvements $500,000 yes 1 $500,000 Trail Hwy 99W Provide Arterial Corridor Management from $3,400,000 yes 2 $1,020,000 Congestion-ITS Downtown Portland to Highway 217 Hwy99W Provide Arterial Corridor Management from Highway $4,200,000 yes 2 $1,260,000 Congestion-ITS 217 to 124'Avenue 2 Uber List Durham Road Provide Arterial Corridor Management along Corridor $1,400,000 yes 2 $420,000 Congestion-ITS School/Park #2(1-5)in the Metro TSMO Plan Durham Road Provide Arterial.Corridor Management along Corridor $1,500,000 yes 2 $450,000 Congestion-ITS School/Park #19(Hwy 217)in the Metro TSMO Plan Pathfinder-Genesis Trail Fanno Creek Trail to Pathfinder Ct Trail $715,000 yes 2 $214,500 Trail Scholls Ferry Rd/North Dakota St/125th Ave Intersection Improvement $1,500,000 yes 2 $150,000 Intersection-Lanes Gaarde-Quail Creek Trail from Gaarde St to Quail Creek Ln $50,000 yes 2 X $15,000 Trail 115th(Fonner to Fairview) Add sidewalk on west side $2,000,000 yes 2 $600,000 Walk 72nd Avenue Provide Arterial Corridor Management along Corridor $1,700,000 #19(Hwy 217)(Hwy 217)in the Metro TSMO Plan yes 2 $510,000 Congestion-ITS Commercial Hall Boulevard Add an eastbound through lane on Hall Blvd.from $500,000 yes 2 $150,000 Congestion-Lanes Pamelad Road to Greenburg Road rovitle Arterial Corridor Management and Transit Hall Boulevard Signal Priority on Hall Boulevard from Highway 217 to $3,700,000 yes 2 $1,110,000 Congestion-ITS Hinhw v QQW Hwy 217 NB Ramps/Highway 99W Add a second northbound left turn lane $1,500,000 yes 2 $450,000 Congestion-Lanes Upper Boones Ferry Road. Provide Arterial Corridor Management along Corridor $1,300,000 yes 2 $390,000 Congestion-ITS #2(1-5)in the Metro TSMO Plan 98th(Murdock to Sattler) Sidewalk $600,000 yes 1 $600,000 Walk School Ash Ave(Fanno Creek-McDonald) Sidewalk $2,000,000 yes 1 X $2,000,000 Walk Commercial 97th Avenue Install sidewalk on both sides of street from $1,000,000 yes 2 $300,000 Walk School McDonald.Street to Murdock Street Scholls Ferry Rd Provide Arterial Corridor Management from River $4,200,000 yes 2 $1,260,000 Congestion-ITS Road to Hall Boulevard Bull Mtn Rd/Benchview/139th Roundabout $3,000,000 yes 2 X $300,000 Intersection-Lanes Warner St extension Connect Warner St to Hall;include sidewalks and $500,000 yes 1 X $500,000 Connectivity bike lanes Hall Boulevard Provide Arterial Corridor Management from Highway $1,900,000 yes 2 $570,000 Congestion-ITS 99W to the south terminus Hwy 99W/Dartmouth St. Turn lanes,aux lanes,sidewalks,bike lanes, $6,000,000 yes 2 $1,800,000 Congestion-Lanes Commercial crossings;transit improvements Street Tigard Install sidewalks on both sides of the street from $970,000 9 115th Avenue to Highway 99W yes 2 $291,000 Walk Commercial 72nd/Upper Boones Ferry(Carman) Intersection Improvement $1,000,000 yes 2 $100,000 Congestion-Lanes Hwy 217 NB On-ramp/Scholls Ferry Road/Washington Square Road Interchange Intersection Improvement $750,000 yes 2 $75,000 Intersection-Lanes Improvement Benchview Terrace Install sidewalk on both sides of street from $280,000 yes 1 $280,000 Walk Greenfield Drive to Bull Mountain Road 3 Uber List Hwy 217 SB Ramps/Highway 99W Intersection Capacity Improvements including 2nd $2,500,000 yes 2 $750,000 Congestion-Lanes right turn lane from off ramp Implement access management strategies and Hwy 99W Access Management median projects identified in the Highway 99W Plan $20,000,000 yes 2 $6,000,000 Congestion-ITS (related to roadway project#66) Hwy 99W Bike Lanes Fill in gaps in Bike lanes along Hwy 99W $500,000 yes 2 $150,000 Bike Upper Boones Ferry Road Install bike lanes on both sides of street from 1-5 to $1,000,000 yes 2 $300,000 Bike Durham Road Hwy 99W/68th Ave Intersection Improvements.Provide protected left at $4,000,000 yes 2 $1,200,000 Congestion-ITS Commercial 68th;transit queue bypass O'Mara Street Install bike boulevard treatments on both sides of the $60,000 yes 1 $60,000 Bike street from McDonald Street to Hall Boulevard Install bike boulevard treatments on both sides of the Fanno Creek Drive street from the Fanno Creek Trailhead to Bonita $100,000 yes 1 $100,000 Walk School Road Tiedeman Street/Tigard Street Install a traffic signal;construct left-turn lanes, $1,000,000 yes 2 $300,000 Congestion-ITS sidewalk,and bike lanes Benchview Terrace Install bike boulevard markings and treatments $120,000 yes 1 $120,000 Bike Greenfield Drive Install bike boulevard markings and $90,000 yes 1 $90,000 Bike Tiedeman at Fanno Creek Trail Realign Trail for direct crossing $200,000 Committed Funds 2 NIN $60,000 Trail Provide 2 travel lanes,tum lanes where necessary, Main Street Green Street(Phase 11) on-street parking,good sidewalks,and lots of pedestrian-friendly amenities on Main Street from the $2,000,000 Committed Funds 2 X RFFA $600,000 Walk Commercial railroad tracks north to Highway 99W Tiedeman Ave Sidewalks from Tigard St to Greenburg Rd $1,000,000 Committed Funds 1 X Local $1,000,000 Walk Commercial Walnut St(116th to Tiedeman) Add middle turn lane and bike lanes and sidewalks $8,000,000 Committed Funds 2 MSTIP $800,000 Congestion-Lanes School/Parks Fanno Creek Trail(Woodard to Grant) Woodard Park to Grant $670,000 Committed Funds 2 X RFFA $67,000 Trail Park/Commercial Commercial St(Lincoln to Main under 99W) Install sidewalks on NE side of the street from Main $1,000,000 Committed Funds 2 STIP $100,000 Walk Commercial Street to Lincoln Street Fanno Creek Trail(Library to Bonita) Library to Milton Ct/Bonita Rd $2,000,000 Committed Funds 2 RFFA $600,000 Trail Fanno Creek Trail(Durham to Tualatin River) Durham Rd to Tualatin River Trail $1,500,000 Committed Funds 2 X RFFA $150,000 Trail School/Parks Fanno Creek Trail(Hall to Main) New bridge over Fanno Creek;facilitates CWS creek $1,000,000 Committed Funds 2 X RFFA $300,000 Trail Commercial remeander Roy Rogers Rd.widening to 5 Ln.from N of Scholls $35,000,000 Committed Funds 2 MSTIP Bond(fDT $3,500,000 Congestion-Lanes School Ferry Rd.to S.of Beef Bend Rd. Roy Rogers Road/Bull Mountain Rd traffic signal $1,000,000 Committed Funds 2 MSTIP Bond/TDT $100,000 Intersection-ITS Roy Rogers Road/E-W collector traffic signal $1,000,000 Committed Funds 2 MSTIP Bond/TDT $100,000 Intersection-ITS 4 Uber List Roy Rogers Road/Lorenzo Ln.extension traffic $1,000,000 Committed Funds 2 MSTIP Bond/TDT $100,000 Intersection-ITS signal Scholls Ferry Road/N-S collector traffic signal $1,000,000 Committed Funds 2 MSTIP Bond/TDT $100,000 Intersection-ITS 161st Ave.from Woodhue St.extension to Beef New complete street $3,500,000 Committed Funds 2 Developer,TDT, $350,000 Connectivity Bend Rd. TSDC Bull Mountain Rd./N-S collector intersection $1,500,000 Committed Funds 2 Developer,TDT, $150,000 Connectivity TSDC River Terrace Blvd/E-W collector intersection or $2,000,000 Committed Funds 2 Developer,TDT, $200,000 Connectivity roundabout TSDC Lorenzo Ln.from Roshak Rd.to Roy Rodgers Rd. $3,500,000 Committed Funds 2 Developer,TDT, $350,000 Connectivity TSDC Lorenzo Ln.from West UGB to Roy Rodgers Rd. $2,500,000 Committed Funds 2 Developer,TDT, $250,000 Connectivity TSDC River Terrace Blvd from Bull Mountain Rd.to the $18,750,000 Committed Funds 2 Developer,TDT, $1,875,000 Connectivity Park south UGB TSDC River Terrace Blvd from Lorenzo Ln.extension to $11,000,000 Committed Funds 2 Developer,TDT, $1,100,000 Connectivity Bull Mountain Rd. TSDC River Terrace Blvd from Scholls Ferry to Lorenzo $14,250,000 Committed Funds 2 Developer,TDT, $1,425,000 Connectivity Ln.extension TSDC River Terrace Improvements where new streets Developer,TDT, meet existing streets(Collectors) $500,000 Committed Funds 2 TSDC $50,000 Intersection-Lanes River Terrace Improvements where new streets $2,000,000 Committed Funds 2 Developer,TDT, $200,000 Intersection-Lanes meet existing streets(Neighborhood) TSDC River Terrace southern east-west collector between $2,500,000 Committed Funds 2 Developer,TDT, $250,000 Connectivity Roy Rodgers Rd.and N-S collector TSDC River Terrace Trail from Roy Rodgers Rd,to 150th $3,600,000 Committed Funds 2 Developer,TDT, $360,000 Trail Ave. TSDC Woodhue St./161st Ave.extension intersection or $2,000,000 Committed Funds 2 Developer,TDT, $200,000 Connectivity roundabout TSDC Walnut St/135th Ave Intersection Construct signal or roundabout $1,000,000 Committed Funds 2 X MSTIP $100,000 Intersection-ITS Improvements to distribute east/west traffic between Oak-Lincoln-Locust Street Collector Locust and Oak Streets and improve accessibility to System(Washington Square Connectivity Lincoln Center commercial district.Includes Lincoln $3,000,000 Committed Funds $3,000,000 Connectivity School/Commercial Improvements) Street extension to Oak Street.(Lincoln Street portion anticipated to be constructed by development) Tigard Connector Service in the Tigard Triangle Local transit connector service within Tigard Triangle, $10,000,000 Major Regional Transit Commercial downtown,and perhaps Washington Square areas High Capacity Transit Planning Planning and Alternatives Analysis for HCT $5,000,000 Major Regional Transit Add a southbound through lane on Hwy 217 at the Hwy 217 Southbound Aux Lane current capacity pinch point under the Allen and $20,000,000 Major Regional Congestion-Lanes Denney overpasses Hwy 217 Northbound Aux Lane Add a northbound through lane under the Hwy 99W $20,000,000 Major Regional Congestion-Lanes overpass to address a capacity pinch point WES Increased Service Transit Service Improvement $100,000,000 Major Regional Transit I-5/Hwy 217 interchange from 72nd Ave toBangy Interchange Improvement $81,500,000 Major Regional Intersection-Lanes Road 1-5/Upper Boones/Carman Interchange Add tum lanes and/or auxiliary through lanes, sidewalks,etc $10,000,000 Major Regional Intersection-Lanes Greenfield ext;Ridgefield Dr to Chirp St New trail and bridge $400,000 rescope 1 Local $400,000 Trail School/Park 5 Uber List Extend 68th Avenue south to Hwy 217 providing right 68th Avenue in/right-out only acces to 68th Avenue from Hwy 217, $15,000,000 rescope 2 $1,500,000 Connectivity Commercial replacing the NB ramps to 72nd at Hwy 217?? 72nd Ave.Improvements(Hunzikerto Bonita) Widen to 5lanes with bikeways and sidewalks $28,166,850 rescope 2 X $2,816,685 Congestion-Lanes Nimbus Road Extension Extend Nimbus Road south to Greenburg Road(or $30,000,000 rescope 2 $3,000,000 Connectivity Tiedeman) Greenburg Rd(Tiedeman to 217) Add northbound travel lane;bike lanes;sidewalks; $7,000,000 rescope 2 $700,000 Congestion-Lanes second left tum lane from Tiedeman Hall Boulevard Widening,Highway 99W to Preserve ROW for potential 3 lanes plus on-street McDonald St parking or 5 lanes);build sidewalks and bike lanes; $6,000,000 rescope 2 $600,000 Congestion-Lanes School safety improvements Hall Blvd/Fanno Creek Bridge Replace with wider bridge with sidewalks and bike $6,000,000 rescope 2 $600,000 Walk lanes Widen to five lanes with bike lanes and sidewalks; 72nd Avenue Widening:Elmhurst to Hunziker includes bridge widening and possible interchange $25,000,000 rescope 2 X $2,500,000 Congestion-Lanes Commercial improvements McDonald St(Hall to 99W) Widen to three lanes with bike lanes and sidewalks $8,000,000 rescope 2 X $800,000 Congestion-Lanes Hwy 217/72nd Ave Interchange Improvements Complete interchange reconstruction with additional $19,500,000 rescope 2 $1,950,000 Intersection-Lanes ramps and overcrossings. Upper Boones(Durham to Sequoia) Widen to five lanes with bike lanes and sidewalks $10,000,000 rescope 2 X $1,000,000 Congestion-Lanes Bull Mountain Road(Hwy 99W to Benchview Terr) Widen to three lanes with bike lanes and sidewalks $8,000,000 rescope 2 $800,000 Congestion-Lanes Turn lanes,aux lanes,sidewalks,bike lanes, Hwy 99W/72nd Ave Intersection crossings;transit improvements $8,000,000 rescope 2 $800,000 Congestion-Lanes Commercial Construct intersection improvements at Durham Road and Upper Boones Ferry Road to provide dual Durham Road at Upper Boones Ferry Road southbound right-tums,dual eastbound left-turns, $4,000,000 rescope 2 $400,000 Congestion-Lanes eastbound right-turns,existing and improve signal timing. Widen to 5 lanes from Locust St to Greenburg Rd; Greenburg Rd.(Hwy 217 to Hall Blvd) add tum/aux lanes;add bike lanes and sidewalks $20,000,000 rescope 2 $2,000,000 Congestion-Lanes throughout corridor Widen to 5 lanes with bike lanes,sidewalks,and 72nd Avenue Widening:Hwy 99W to Dartmouth intersection improvements(2015-2019 CIP does not $10,000,000 rescope 2 $1,000,000 Congestion-Lanes Commercial state"widen") Hwy 217 Over-crossing at Washington Square Provide a new full street connection from Nimbus to $25,000,000 rescope 2 $2,500,000 Connectivity Regional Center-Cascade Plaza Locust Walnut St(Tiedeman to Hwy 99W) Widen to 3 lanes+bike lanes and sidewalks;add $8,000,000 rescope 2 X $800,000 Congestion-Lanes School tum lanes at 99W 6 Uber List Widen to 4/5 lanes;build sidewalks and bike lanes; Hall Boulevard Widening,Bonita Road to Durham safety improvements(construct 3 lanes with $3,000,000 rescope 2 $300,000 Congestion-Lanes development,preserve ROW for 5 lanes) Scholls Ferry Rd ROW preservation,Barrows to ROW preservation for potential 7 lanes(both dir) 121st between OR 217 and 121st Avenue and improve $8,000,000 Incompatible Congestion-Lanes intersections Hall Boulevard Widening,McDonald Street to Widen to 3 lanes plus auxiliary Ianes;Preserve ROW Bonita Road for 5lanes;build sidewalks and bike lanes;safety $8,000,000 Incompatible X Congestion-Lanes School/Parks improvements Hall Blvd(Bonita to Durham) Widen to three lanes,bike lanes,sidewalks; $3,000,000 Incompatible X Congestion-Lanes intersection imprvmts Hwy 99W/Walnut St.Intersection improvements Turn lanes,aux lanes,sidewalks,bike lanes, (additional tum lanes) crossings;transit improvements $10,000,000 Incompatible Intersection-Lanes Hwy 99W/Durham Rd.intersection improvements Turn lanes,aux lanes,sidewalks,bike lanes, $10,000,000 Incompatible X Intersection-Lanes (additional tum lanes) crossings;transit improvements 68th Avenue Widen to 3 lanes between Dartmouth/1-5 Ramps and $3,000,000 Incompatible Connectivity Commercial south end Retain eastbound right-turn lane when 3rd lane added on Scholls Ferry Rd;Retain westbound right- Scholls Ferry/Nimbus Intersection Improvements turn lane when 3rd lane added on Scholls Ferry Rd; $6,000,000 incompatible Congestion-Lanes southbound right-tum lane;Reconfigure northbound and southbound lanes to create exclusive left-tum lanes McDonald/Hall RT Lane. Lengthen eastbound right tum lane from McDonald $200,000 Incompatible X Congestion-Lanes School onto Hall Greenburg Rd(Shady to 217) Add third lane $8,000,000 Incompatible Conestion-Lanes 2nd Northbound lane,modify signal timing at Greenburg Intersection Improvements Greenburg/Oleson/Hall;install boulevard treatment at $8,000,000 Incompatible Congestion-Lanes Greenburg/Washington Square Road Hwy 217 over-crossing-Hunziker-Beveland Connect Hunziker Road to 72nd Avenue—requires Connection over-crossing over ORE 217—removes existing 72nd $50,000,000 financially infeasible 2 $15,000,000 Connectivity Avenue/Beveland intersection Pfaffie-North Dakota east-west connection with Hwy North Dakota-Pfaffie Highway 217 over crossing 217 over-crossing to provide a neighborhood route $20,000,000 financially infeasible 2 $6,000,000 Connectivity (See projects 12,13). Ash Ave Extension(Maplewood to Burnham) Extend Ash Avenue from Maplewood,across Fanno $10,000,000 financially infeasible 1 $10,000,000 Connectivity Commercial Creek,to Burnham. 72nd Ave.Improvements(Bonita to Durham) Widen to 5 lanes with bikeways and sidewalks $15,425,000 financially infeasible 2 X $4,627,500 Congestion-Lanes Durham Road Improvements(Hall Blvd to Hwy Widen to five lanes with bike lanes,sidewalks,and $25,000,000 financially infeasible 2 X $7,500,000 Congestion-Lanes School 99W) extra turn lanes where needed Greenfield Drive Connection Connect street across ravine from Bull Mountain Rd $8,000,000 financially infeasible 1 $8,000,000 Connectivity to Benchview Terr 7 Uber List 95th-Grant Connection Bridge over railroad tracks $10,000,000 financially infeasible 1 $10,000,000 Walk 2:North Dakota/Greenburg realignment—purchase North Dakota-Pfaffle Neighborhood Route existing building to make N.Dakota a continuous (Tiedeman Realignment,North Dakota/Greenburg east-west street,Realign Tiedeman to intersect with $10,000,000 financially infeasible 2 $3,000,000 Connectivity intersection reconstruction) North Dakota and close the Tiedeman railroad crossing.Reconstruct North Dakota/Greenburg intersection Northern Washington Square Regional Center New Road $30,000,000 financially infeasible 2 $9,000,000 Connectivity Commercial Crossing Wall Street connection New roadway connecting Hunziker St and Hall $15,000,000 financially infeasible 2 $4,500,000 Connectivity Boulevard Durham Road Improvements(Upper Boones Ferry Widen to five lanes with bike lanes,sidewalks,and $20,000,000 financially infeasible 2 $6,000,000 Congestion-Lanes School Rd to Hall Blvd) extra turn lanes where needed Bonita Road Widening Widen to 5-lanes with bike lanes and sidewalks from $20,000,000 financially infeasible 2 X $6,000,000 Congestion-Lanes Hall Blvd to 1-5 Bridge North Dakota Street Railroad Overcrossinq Grade-Separated Crossinq $5,000,000 financially infeasible $5,000,000 Intersection-Lanes Construct a new road that extends from Dartmouth Dartmouth Street Extension to Hunziker Street in the Tigard Triangle,over Hwy 217,to $58,690,000 financially infeasible 2 $17,607,000 Connectivity Hunziker Hall Boulevard extension Extend south to Tualatin across the Tualatin River $60,000,000 financially infeasible 2 $18,000,000 Connectivity Durham Road Realignment at Upper Boones Ferry Realign/reconfigure Durham Road.,Upper Bcones Road intersection Ferry Road intersections/roadway to accommodate $15,000,000 financially infeasible 2 $4,500,000 Connectivity traffic flow between Durham Road and Interstate 5. Greenburg Road(Hwy 99W to Tiedeman) Widen to five lanes with sidewalks and bike $16,000,000 financially infeasible 2 $4,800,000 Congestion-Lanes IanesTiedeman Ave. Scholls Ferry Rd Widening,Hwy 217 to 121st Widen to 7 lanes with bike lanes and sidewalks $25,000,000 financially infeasible 2 $7,500,000 Congestion-Lanes Widen bridge to 6 lanes(2-1-1-2?)or(2nd Upper Boones/Carman at 1-5 northbound westbound through lane;2nd northbound left-tum $20,000,000 financially infeasible 2 $6,000,000 Congestion-Lanes lane;eastbound separate through and left-turn lanes) Beef Bend Road Add Sidewalks and bike lanes $3,000,000 Not in Tigard Walk Tualatin River Trail 108th Ave to Pacific Hwy Extension $2,500,000 Not in Tigard Trail Park Taylors Ferry Road Extension Extend to Oleson Road $4,390,000 Not in Tigard Connectivity Taylor's Ferry Rd Install sidewalks on both sides of the street from Ta y ry Washington Drive to 62nd Avenue $3,220,000 Not in Tigard Walk 150th Ave.from Bull Mountain Rd.to Beef Bend Street widening with bike lanes and sidewalks $4,000,000 Not in Tigard Walk School Rd. Bull Mountain Rd.from Roy Rodgers Rd.to Roshak Rd. $4,000,000 Not in Tigard Walk Hwy 99W,Sidewalks Complete gaps in sidewalk south of King City Town $1,070,000 Not in Tigard Walk Commercial Center Tualatin River Trail Complete multiuse path from Cook Park to the $10,000,000 Not in Tigard Trail School Poweriines Corridor Highway 217 SB/Hall Blvd Interchange SB right-turn lane at Hall Blvd/OR 217 ramp $5,000,000 Not in Tigard Congestion-Lanes Improvements City CouncilmTTAC Meeting TTAC Meeting October 7, 2014 Review 4 Format • Individual comments All • TTAC Year-in- Review Kevin • Key Points Presentation Kevin/All Key Points • Compare 4 hypothetical key points — Keep Tigard livable — Upgrade Hall/McDonald intersection in 2016 • Impact?? (Thanks! to "The Nightly Show") — "Weak tea" or — "Keep it 100" Criteria 4 ACTIONABLE • Relevant to transportation • Focused/specific • Address new issue/topic or • Address treatment of existing issue/topic • Feasible ( based on budgets/staff/etc. ) KeyPoints " 1St cut " � I St rom 9 2 TTAC meetin(from i g) • Revise local zoning/land use rules in order to promote connectivity and allow for shorter trips • Leverage outside funds in order to develop cost-effective solutions to real transportation challenges • Evaluate revenue increases (e.g., +2 cents gas tax) • Improve East <--4 West traffic routes (e.g., Ash St. Crossing, River Terrace integration) • Evaluate potential solutions to local transit challenges (e.g., local transit system partnerships with other cities) • Develop forward-looking traffic calming policy that enhances walkability and safety • Upgrade Hwy 217/72nd Ave. interchange TTAC 2015 Planning 10/7/2015 Month / Date Actions/Main Points January 7 Safe Routes to School overview; paving report February 4 Safety workshop w/Dr. Takallou; elections March 4 Funding sources overview; project updates April 1 Gaarde/99W project review; SW Corridor workshop May 6 SW Corridor update (Metro); SW Service Enhancement Plan (TriMet) June 3 Traffic calming proposal; Walkable Cities preview July 1 (Cancelled) August 5 FY17 CIP planning; Council meeting preparations; N. Dakota Bridge project September 2 FY17 CIP planning; Hunziker Industrial Core project funding October 7 FY17 CIP presentation; Council meeting preparations (oct 20th) November 4 FY17 CIP decisions; FY15 project/budget review December 2 Safe Routes to School update; SW Corridor update