Loading...
PFI2015-00180 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT a COMMUNITY DEVELOPMENT Permit#: PF12015-00180 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 12/17/2015 Parcel: SEG536 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: TriMet Project Description: At intersection of SW Greenburg Rd. and SW North Dakota St., install two shelters at existing bus stops. SEG 536 Owner: FEES Description Date Amount PFI Permit Fee 12/17/2015 $300.00 PHONE: Contractor: WARREN PACIFIC CORPORATION 2310 N KERBY ST. PORTLAND, OR 97227 PHONE: 503-708-0429 FAX: Applicant: ALI AL SAHAF 1800 SW FIRST AVE., SUITE 300 PORTLAND, OR 97201 PHONE: 503-962-2193 Tota 1 $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: Not Present Issued By: C> --�- Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12015-00180 Type: Condition Name: Status: Severity: PFI_Sidewalk/[ 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI—Sidewalk/1 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Sidewalk/[ 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI—Sidewalk/i: 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Sidewalk/C 05-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Sidewalk/[ 06-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI—Sidewalk/1 07-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments,and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Sidewalk/[ 08-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI—Sidewalk/1 09-OTHER Applied Notice REC; :.IrED City of Tigard DEC 01 2015 PUBLIC WORKS — ENGINEERING Public Facility Improvement (PFI) Permit DESCRIPTION OF WORK(in the right-of-way) TYPE OF WORK Check one: ❑ Utility Connection El TYPE 1—Franchise Utility Work Sidewalk/driveway approach Work performed by NWN,PGE ❑ Street improvements agency.nd/or utility Detailed description: TYPE2—SidewalkDriveway/Sewer f.qileA os c rl ;o y) Work performed for the purpose of: I S gt�GLGHe Sidewalk-installation or repair. • Driveway approach installation Property address/location(s): and/or repair Sanitary sewer lateral installation L1 ' I(�S Arid CA�t`lo ns life gt�G�t and/or main fine tap ❑ TYPE 3—Full scale Development Applicant: 7f t lvw T Work performed with Land use Address: lQOo S`N rt!`1t AVE• Sy i to 300 approval which includes any of the following: /state: Porfilagno� / Q� zip: 9-+2_01 City p Subdivisions or Partitions Phone: So3 -96)�-219Finail: rgIGAhN4aLZ Troj i Me • Street widening Contact name: Ali At gQat� Phone: 503 -961 • Mainline installation for Sanitary {{; r,, sewer,Storm sewer,Tigard water Contractor: W a«e►� PA Gt T'L ""` N and/or Tigard Water Service Area CCB#: 3 H 17 Z Expiration: A r t l , 201-1 SUBMIT COMPLETED APPLICATION TO: Address: 2b1 o N 1Cerloy Street City of Tigard City/state: r�t-101ti'1� UZ Zip: q1 12, PlanninglEngineering Phone: 503- mail: 13125 SW Hall Blvd. —Ln Tigard,OR 97223 Contact name: �r'1 K W a�C h Phone: 503 --1'09 "A 2-G 1 Applications for"minor work in right-of-way" (� only may be emailed to: Engineer: Ali Al S o1 VNA } ro_TrmitsQt igard-or.gov Address: V600 cz J Fi f-St Av E• ? s )%te 300 City/state: Po r-fi AYI CA /D 2 ?ip: Ct-k 201. Phone:503-962-2 Iq 3 Email: g t sg Lia a A Tr;M e t o�j Case No.: Contact name: All Al Soyica Application submitral fee: Additional fees: Estimated value of work is required(if over$5,000):$ Al 1 Uu 0 App -cc accepted: (within the public right-of-way) By: Date: I2 t l 5 Is work related to a LAND-USE DECISION? E] Yes /No Application r ewcd: By::s Dace: If so please specify (MLP, SDR, SUB, etc.) case#: _ Applicant notified: _ Is work related to a BUILDING PERMIT? El Yes Yes LY No By Date: If so,please specify(BUILDING PER case#: 1:\CURPLN\M.M.n\Land Us.Appik ti ns R.,07/09/1015 City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page I of 4 L--� - �N -\O P r e PQ P \ EX. R.O.W. LINEL EX. WALK PATH CONCRE AUTUMN OAKS SIGN EX. TRIMET TRASH CAN C� EX. TRIMET BUS STOP SIGN NEW 5'X8' BUS ADA - \ RAMP LANDING AREA NEW TRIMET TYPE "A" BUS SHELTER (N.I.C) (8.5'X2.5 X8 ) EX. CONCRETE PAD O EX. LIGHT POLE EX. TRAFFIC SIGNAL BOX - NOTES: ZN DIR. = DIRECTION EX. = EXISTING Qj;l MAX. = MAXIMUM 10' `J' 0' 10' 20' MIN. = MINIMUM N.I.C. = BY TRIMET a R.O.W. = RIGHT OF WAY SCALE: 1 " = 10' 0 Y Q CAPITAL PROJECTS SHELTER INSTALLATION w TRI MET DIVISION SW GREENBURG RD FS SW NORTH DAKOTA ST w 1800 SW FIRST AVE., SUITE 300 PORTLAND, OREGON 97201 EBp, OB, NS PROJECT COORDINATOR: CONTRACT NO: DESIGN: DRAWN: CHECKED: DATE: ALI AL SAHAF 503-962-2193 AA AA AA 11/18/15 SCALE: FILE NAME: LOC ID: OTRSEC/SEC NO: APPROVED: SHEET NO: 1" = 10'-0" 2234-GREENBURG NDAKOTA - YP 2 OF 2 0 4'-6 II/16' 8'-6 3/8'O/A LENGTH 4'-6 II/16' O/A WIDTH 1'-&1/8'ROOF TRIM O/A WIDTH 6mm THEI;I'10GLEAR BELL END WHITE CLEAR TINT ro *END FLAT BAR 1/4'TEMPERED GLASS + Y'TRIM • ROOF TRIM CORNER TRIM OUBLE LIGHT POP FIXTURE(INSIDE j SHELTER) ~ ul POST POST 2 7 C3 MIL POWDER m (3 MIL POWDER W m COAT FINISH) `n COAT FINISH) mS ;p U ''CHANNEL M 'F'CHANNEL s 1/4'PIN, TYPICAL A. A3 2 9/I6' HORIZONTAL MULLION LEFT SIDE ELEVATION FRONT ELEVATION RIGHT SIDE ELEVATION • 8'-6 3/8' O/A LENGTH ROOF TRIM 44'x19'GLAZING 44'x1S'GLAZING LIGHT TO BE MOUNTED TO ROOF TRIM AT POWER CENTER OF GLASS PANEL 4 LEG NOTES: GLAZING:TEMPERED COLOR: —GLASS(BY OTHERS) x SHELTER 4 BENCH: 2 DARK BLUE,F621IM12 • POWDER COAT BY PROTECI4 2 PERSON,EASY r0 � c 0 ACCESS BENCH 113 .9Q � v0 ROOF n ABOVE 5 3 TOP VIEW - ROOF REMOVED w x 88 2-06� ® TRI-COUNTY METROPOLITAN TRANSPORTATION DISTRICT OF OREGON TR I MET AL �05 BASIC SHELTER COMPONENTS AP CRAL PROJECTS w+o TYPE A SHELTER TR 1W) MET FAC710 NUTIES EISI� MSION PLAN&ELEVATION POf01AND,OREGON 97U2 �E.S �41�— rcr n0.. v, NOT TO=.E owunnc 5-1000 BH06077BLE w Public Facility Improvement (PFI) Permit Second Location -Detailed Description and address/location: - Installation of TriMet Type 'B' Shelter behind the sidewalk as outline in the drawings. - Site address is at SW Greenburge RD opposite of SW North Dakota ST(TriMet Bus Stop ID 2235) which is adjacent to 11225 SW Gereenburg RD.Tigard,OR 97223 - Contractor is Warren Pacific Corporation—CCB#34172/Expiration—April, 2017 The sidewalk and public right of way are too narrow to accommodate a shelter without blocking the ADA mandated pedestrian throughway.TriMet made a deal (Property Agreement)with the adjacent property to construct concrete pad directly behind the sidewalk, on their property. Please see the attached drawings and plans. A Shelter would give customers a covered place to wait and would be cleaned at least once per week by TriMet Crews. T rte! 9 ;,�'�,�, ems;��q• ,., gC 1; ppig "��eft •�' � r 3 O Y CE Q ED CAPITAL PROJECTS BUS STOP IMPROWENTS z DIVISION SW GREENBURG RD OP SW NORTH DAKOTA ST w TRI@MET 1800 SW FIRST AVE., SUITE 300 SITE MAP PORTLAND, OREGON 97201 w PROJECT COORDINATOR: CONTRACT NO: DESIGN: DRAWN: CHECKED: DATE: = ALI AL SAHAF 503-962-2193 AA AA AA 11/18/15 SCALE: FILE NAME: LOC ID: OTRSEC/SEC NO: APPROVED: SHEET NO: 1" = 50'-0" EXHIBIT A 2235 - YP 1 OF 4 NOTE: 142 FEET DISTANCE FROM THE BUS STOP POLE TO NORTH DAKOTA ST NEW TRIMET TYPE 'B' BUS �G SHELTER (8.5'X4.5'X8') LLI z CONSTRUCT NEW \\ . u 6' X 20' \�.:.. o CONCRETE PAD SEE DETAIL Q SHEET 3 \� NEW 5'X8' BUS ADAa / RAMPING LANDING AREA O. EXISTING TRIMET BUS STOP POLE SIGN Side End of sidewalk a 10 5 0' 10' 20' IS vj0 CENjER H P 0 SCALE: 1 " _ '10' �OE 0 Y Q CAPITAL PROJECTS BUS STOP I M P R O W E N TS W DIVISION SW GREENBURG RD OP SW NORTH DAKOTA ST RI@METT 1800 SW FIRST AVE., SUITE 300 PORTLAND, OREGON 97201 EB, OB, NS w PROJECT COORDINATOR. CONTRACT NO: DESIGN: DRAWN: CHECKED: DATE: = ALI AL SAHAF 503-962-2193 AA AA AA 11/18/15 SCALE: FILE NAME: LOC ID: OTRSEC/SEC NO: APPROVED: SHEET NO: 1" = 10'-0" EXHIBIT A 2235 - YP 2 OF 4 0 3 vi 20Qo' 6 " A SHEET 4 CONSTRUCT CONCRETE PAD 5.5" MIN. THICKNESS, 3000 PSI PCC WITH 2" COMPACTED AGGREGATE BASE. SLOPE TO DRAIN TO CURB (NOT TO EXCEED 2%) CONSTRUCT CONCRETE CURB. SEE DETAIL 1 /4 M c v Q h O Y Q CAPITAL PROJECTS BUS STOP I M P R O W E N TS z olvlsloly SW GREENBURG RD OP SW NORTH DAKOTA ST w TRI PRET 1800 SW FIRST AVE., SUITE 300 PORTLAND, OREGON 97201 DETAIL W PROJECT COORDINATOR: CONTRACT NO: DESIGN: DRAWN: CHECKED: DATE: = ALI AL SAHAF 503-962-2193 AA AA AA 11/18/15 SCALE: FILE NAME: LOC ID QTRSEC/SEC NO: APPROVED: SHEET NO: m EXHIBIT A 2235 - YP 3 OF 4 o EXISTING GRADE - BLEND NEW GRADES AT 3: 1 MAX. TYP. ALL SIDES 1" RAD. TYP. EX. X SIDEWALK z Q SLOPE 2% MAX CV Q 135, i N oc) �- ''_"': III, -III-1TI111 l li l g„ 3000 PSI PCC 2" MIN, DEPTH OF COMPACTED 4" CRUSHED ROCK COMPACTED SUBGRADE CONCRETE CURB AT BUS SHELTER PA 1 NTS KEY C.O.P. - CITY OF PORTLAND DIR.- DIRECTION EX. - EXISTING MAX. - MAXIMUM MIN. - MINIMUM N.I.C. - BY TRIMET R.O.W. - RIGHT OF WAY T.O.S. - TOP OF SLOPE T.O.W. - TOP OF WALL 0 Y Q CAPITAL PROJECTS BUS STOP I M P R O W E N TS z DIVISION SW GREENBURG RD OP SW NORTH DAKOTA ST w TRI@MET 1800 SW FIRST AVE., SUITE 300 PORTLAND, OREGON 97201 DETAIL/SECTION w PROJECT COORDINATOR: CONTRACT NO: DESIGN: DRAWN: CHECKED: DATE. ALI AL SAHAF 503-962-2193 AA AA AA 11/18/15 SCALE: FILE NAME: LOC ID: OTRSEC/SEC NO: APPROVED: SHEET NO: m 1" = 10'-0" EXHIBIT A 2235 - YP 4 OF 4 4'-6 11/16' 8'-6 3/8'O/A LENGTH 4'-6 II/16' O/A WIDTH 1'-8 I/8'ROOF TRIMO/A WIDTH 6mm THERMOGLEAR BELL END WHITE CLEAR TINT 1/4'TEMPERED GLA55 6'END FLAT BAR i0 LL ,r 00 'T'TRIM ROOF TRIM CORNER TRIM \ j FIIUB LE LIGHT FIXTURE(INSIDE SHELTER) POST(3 MIL r w P05T(3 MIL POWDER COAT z v U POWDER GOAT m FINISH) OFINISH.) _ Q W Q w 'F'CHANNEL O U 'F'CHANNEL m u, rTE<SCREW jPICAL nH3 2 5/16 HORIZONTAL MULLION LEFT SIDE ELEVATION FRONT ELEVATION RIGHT SIDE ELEVATION B'-6 3/8' O/A LENGTH l'-8 I/8' ROOF TRIM 44'x l9'GLAZING 44'x l9'GLAZING LIGHT TO BE MOUNTED TO ROOF TRIM AT NOTES: POWER -CENTER OF GLASS PANEL COLOR: LEG SHELTER 4 BENCH DARK BLUE,P52118012 POWDER COAT BY PROTECH ' Z J Q 2 PERSON,E45Y x =3 ACCESS BENCH Q 1 v O GLAZING TEMPERED GL IPA � ROOF BY OTHERS v 8 ABOVE 5 3 TOP VIEW - ROOF REMOVED eeLo 2-06 TRI—COUNTY METROPOLITAN TRANSPORTATION DISTRICT OF OREGON TRIMET o Bu zwo6 CAPITAL PROJECTS BASIC SHELTER COMPONENTS of o,TE D TYPE B SHELTER !: FACILITIES DIVISION PLAN AND ELEVATION -T TRI `➢ M E T 710 N.E.HOLIADAY STREET PORTLAND,OREGON 97232 nm i. Avco c .a .TA,c ryo Eo.a. zca�NOT TO SCALE .c S-1100 BH0600T9LE `�OLJ st-&- Traffic Control Plan: - Using the same Traffic Control Plan for the first and second locations. - The work will only be during standard work hours. (Monday through Friday from 8:00 a.m. to 4:00 p.m.) - The work will occur for approximately 3 days or less. - This work will not require a street closure. The two shelters will be installed by crews from Warren Pacific Corporation. TriMet Shelters will be off loaded from truck then moved into spot detailed on attached plan. Activity of shelter install takes approximately 40-60 minutes. Truck will either park in traveled lane using"Right Lane Closure, Multi- Lane Non-Freeway Diag. 500" (pg 108; Diag. 500; in Oregon Short Term traffic Control Handbook) traffic control guideline or park in the adjacent parking spot to site.This will depend on the availability of the parking stall. Once shelter is bolted down it will be operational for transit riders. 7 4pp l""'j Page 108 2011 Edition 5.5 Multi-Lane Roads Right Lane Closure, Multi-Lane Non-Freeway Diag. 500 Diagram 500 covers work which closes the right lane of a multi-lane non- freeway road. If closing more than one lane on a multi-lane road, provide a minimum tangent distance of 2L between the end of the first lane closure taper and the beginning of the second lane closure taper. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. When the posted speed is 40 mph or less, the RIGHT LANE CLOSED AHEAD signs may be omitted. 4. Placement of signs in a non traversable median or other median that is not a two-way left turn lane is required for lane closures any time there is room for a truck to be parked on the left, out of the travel lane. When there is no room for a truck to be parked on the left an additional RIGHT LANE CLOSED AHEAD sign should be placed on the right side and placement of signs in the median is optional. 5 If flagging is needed for work vehicle ingress/egress, use Flagger Layout Detail (see Inset). Sign Spacing and Buffer Lengths(feet) Posted Spacin Between Signs Buffer Speed A B C Space 20 50 25 100 100 100 75 30 100 35 40 350 350 350 125 150 45 180 50 500 500 500 210 55 250 Chapter 5 December 2011 2011 Edition Page 109 Right Lane Closure, Multi-Lane Non-Freeway Diag. 500 1 4 t t • • Protection Vehicle • w/TMA(both Optional) • See Chapter 4 f I I . • BulYr t t� I auger JA I I B . •� BE •• PREPARED • L L TO STOP • (Optional) Flagger Layout •• us Detail A v, ' - I ti B * See Note 4RIGHT LMIE * ( - CLOSED j l t t AHEAD ROAD • WORK AHEAD December 2011 Chapter 5 L%J- Traffic Control Plan: - Using the same Traffic Control Plan for the first and second locations. - The work will only be during standard work hours. (Monday through Friday from 8:00 a.m.to 4:00 p.m.) - The work will occur for approximately 3 days or less. - This work will not require a street closure. Two Shelters: The two shelters will be installed by crews from Warren Pacific Corporation.TriMet Shelters will be off loaded from truck which takes only couple minutes then moved into parking spot where there will be no lane closure. Activity of shelter install takes approximately 40-60 minutes.Truck will be parked in pull off lane using"Diversion into Continuous Left Turn Lane Diagram 430" (pg 106; Diag.430; in Oregon Short Term traffic Control Handbook)traffic control guideline. Once shelter is bolted down it will be operational for transit riders. Concrete Pad for a shelter: For the second location that is adjacent to 11225 SW Greenburg RD.Tigard, OR 97223. We are doing concrete Pad prior to installing the shelter. Truck will be parked in pull off lane using"Diversion into Continuous Left Turn Lane Diagram 430" (pg 106; Diag. 430; in Oregon Short Term traffic Control Handbook)traffic control guideline. Notice that it will be no lane closure. The Concrete work will take 2 to 3 days to fully cure. Page 106 2011 Edition Diversion into a Continuous Left Turn Lane Diagram 4301 Diagram 430 shows work in the travel lane(s) next to a continuous two-way left turn lane with one direction of traffic diverted into the continuous two-way left turn lane. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. When two or more travel lanes are reduced to a single lane before the diversion, each lane shall be closed separately. Layout traffic control according to ODOT Standard Drawing TM 852 for 5-lane sections. 4. A shifting taper(L/2) may be added in the diverted traffic direction across the continuous two-way left turn lane (as shown). This option is recommended when the speed is 45 mph or greater. Sign Spacing and Buffer Lengths(feet) Posted Spacing,Betw_een.Signs Buffer ,Speed A B C Space 20 50 25 100 100 100 75 30 100 35 40 350 350 350 125 150 45 180 50 500 500 500 210 55 250 Chapter 5 December 2011 2011 Edition Page 107 Diversion into a Continuous Left Turn Lane Diagram 430! ROAD WORK AHEAD B 11y1t CENTER I LANE CLOSED AHEAD A II U2 I . I Buffer Protection Vehicle w/TMA(both Optional) See Chapter 4 Buffer • • U2 I ; U2 I• I A It II lyt B ROAD I WORK AHEAD December 2011 Chapter 5