PFI2015-00181 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
C COMMUNITY DEVELOPMENT Permit#: PF12015-00181
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 12/09/2015
Parcel: SEG911
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE
Project Description: Replace sec vault and install sec CBL to 12250. This will require boring 60 ft.
Owner: FEES
Description Date Amount
PHONE:
Contractor:
PHONE:
FAX:
Applicant:
TSAHAI ANDERSON
10800 SW AVERY ST
TUALATIN, OR 97062
PHONE: 503-612-6106
Tota 1 $0.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: Not Present
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12015-00181
Type: Condition Name: Status: Severity:
PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Not Met Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 17-NOTICE TO COMMENCE WORK Not Met Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI_Utilities 19-MONUMENT PROTECTION Not Met Notice
Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's
expense
PFI_Utilities 21 -OTHER Not Met Notice
PFI_Utilities 01 -WORK SITE REQUIREMENTS Not Met Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 12-UTILITY NOTIFICATION Not Met Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 13-UTILITY LOCATION CONFLICT Not Met Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 14-TEMPORARY PATCH Not Met Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 18-PERMIT/PLAN ON SITE Not Met Notice
A copy of the permit including a Certificate of Insurance, and all attachments,and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 06-TRAFFIC CONTROL PLAN Not Met Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices, flag persons,etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Not Met Notice
Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 03-WORK SITE EROSION CONTROL Not Met Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Not Met Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Not Met Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Not Met Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Not Met Notice
Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 20-EMERGENCY CONTACTS Not Met Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems, take corrective action and, in general, will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 02-WORK SITE AREA Not Met Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Not Met Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Not Met Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
• *REVISED PLANS*
City of Tigard
PGE WORK ORDER# M1723517
PUBLIC WORKS — ENGINEERING
Public Facility Improvement (PFI) Permit
DESCRIPTION OF WORK(in the right-of-way) REQUIRED SUBMITTAL
Check one: IN Utilities ❑ Sidewalk/driveway approach ❑ Street improvements ELEMENTS
Detailed description: Replace Sec Vault and Install Sec CBL to B :Minor work in right-of-way
12250. Bore 60ft (sidewalk repair,curb cut,street
opening,etc.)requires:
•.-Application form,completed
and signed
•Submit one(1)copy of scaled sketch
Property address/location(s): 12250 SW 106th Drive, Tigard OR of the proposed work to be done
•Submit one(1)copy of traffic
control plan
OR—
Applicant's name:
Phil Merriman/Tsahai Anderson ❑ Substantial project work requires
above items and professional
Address: 10800 SW Avery Street engineered plans for:
•Street widening
City/state: Tualatin OR lip: 97062 •Subdivision infrastructure
Phone: 503-612-6106 Email: T&DSupportAvery@pgn.com •Main utility line extension:
Storm Drain,Sanitary—Tigard
- Water—Tigard Water Service
Contractors name: POteICo Inc \rea(includes Durham,King Ciry
CCB#: 76668 Expiration: and a portion of unincorporated
Address: 3884 Pacific Hwy Washington County)
Hubbard, OR 97032 DELIVER APPLICATION TO:
City/state: Zip:
5037939918 City of Tigard
- -
Phone: Email: Planning/Engineering
13125 SW Hall Blvd.
Engineer's name:
Chris Bolton Tigard,OR 97223
Applications for"minor work in right-of-way"
Address: 2213 SW 153rd Drive only may be emailed to:
City/state: Beaverton, OR zip. 97006 ro ermits(Atiga�rd-ord-or.gov
Phone: 503-672-5469 Email: Chris.Bolton@pgn.eom
FOR ONLY
Case No.: PF12015-00181
Estimated value of work (within the public right-of-way): $
Application submittal fee:
Is work related to a LAND-USE DECISION? ❑ Yes & No Application accepted:
If so, please specify (MLP, SDR,SUB,etc.) case #: By: LS Date: 12/4/15
Application re ewed:
Is work related to a BUILDING PERMIT? ❑ Yes N No 20fS
By: Date:
If so,please specify(BUILDING PERMIT)case#:
Applicantnoti5ed:
LBy: L_S Date:QN
I:\CURPLN\Masters\Land Use Applkatfons R".07/16/2014
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4
a -
APPLICANTS
NOTE: Person specified as `Applicant"shall be designated"Permittee"and shall provide financial assurance for work.
*When the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written
authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written
authorization with this application.
BY SIGNING BELOW,THE APPLICANTS) SHALL CERTIFY THAT:
• The above request does not violate any deed restrictions that may,be attached o or imposed upon the subject Property.
• If the application is granted, the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
• AD of the above statements and the statements in the plot plan,attachments,and exhibits transmitted herewith,are true;and
the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application,including the policies and criteria, and understands the
requirements for approving or denying the application.
SIGNATURES of each owner of the subject property required.
Permit Coordinator 12/3/15
Applicant/Authorized Agent's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard • 13125 S\\%Hall Blvd. • Tigard,Oregon 97223 • wv-xv.tigard-or.gov • 503-718-2421 • Page 2 of 4
a
DEVELOPMENT ENGINEERING FEES
1. Public Facility Improvement(PFI) Permit:
Part 1: Required subtnittal fee$300.00
Part 2: All non-water system improvements
Engineer's estimate X 5% (less$300.00 submittal fee)
Engineer's estimate X 2%Plan Review
Part 3: All public water system improvements
Engineer's estimate X 12%
Total Permit Fee = Part 2+ Part 3
PFI Permit Fee Exemptions:
There will be no permit fee charged,or assurance required for the following tapes of work:
• Sidewalk or driveway repair(less than 20 lineal feet)
• Relocate or replace mailbox
• Ditch cleaning that does not uivolve regrading.
• Weepholc repair
• Curb repair or replacement(less than 20 lineal feet)
• Lawn sprinkler system installation or repair
• Street tree pruning or planting
• Planter strip landscape maintenance
• Test wells
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov 503-718-2421 Page 3 of 4
SAMPLE SKETCH:
SW „Y1, St
Edge of Pavement
I Ditch
Streetlight ----------------Ir—•—
A Raaz DT%
, a
� I
T--Pro{�'os cf'SerTiR�"
� I
I N' I
I � Existing House
Existing
z„i I g
�, Driveway
aI
C.
iii
a I
I 1
3
o�
,UI 1
a
Oi
I � Existing Shop �
J 1
Powerpole I
�. C�
I 7r F;L
I--------7-roP95ne-----------
I I
II Fire Hydrant(FH)
� � I
Scale: 1"=30'
� I I
� I I
� I I
� � I
MINIMUM SKETCH REQUIREMENTS (Put"N/A"if Not Applicable):
North arrow Property lines&dimension Slope of property
Street& street name(s) Existing building,structures Utility&street light poles
Proposed work Existing curb or edge Trees
Existing S/W or of pavement Existing utility locations
D/W apron (sewer,water,storm)
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard - 13125 SW Hall Blvd. - Tigard,Oregon 97223 - www.tigard-or.gov - 503-718-2421 - Page 4 of 4
A
Page 84 2011 Edition
[StationaryLane Closure with. Flagging____ _ _Diagram_320!
Diagram 320 covers total closure of one lane of a two-lane, two-way
roadway. See the detail inset for the layout if using a single flagger to control
both directions of traffic on low volume roads (less than 400 ADT)with good
sight distance as discussed below.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Flaggers at each approach are required if any of the following
conditions exist:
a. Night Operations.
b. Work space is over 200 feet in length.
c. Sight distance is less than 750 feet from each approach
through the lane closure.
d. Traffic volumes are greater than 400 ADT.
4. The length between the Flagger Ahead signs shall not exceed one
mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one
mile.
5. Cones should be used to outline the work space when curves or other
roadway alignments prevent clear direction for the motorists to pass
the work space safely.
6. Cones along the work space are recommended when posted speeds
are 45 mph or greater, when working under heavy traffic or when travel
lanes are narrower than 11 feet.
7. Extended queue signing (see Diagram 5-4)should be used when
traffic queues extend beyond the initial advance warning sign.
8. When flagging near an intersection, the "Flagger Ahead" (CW23-2)
sign should be visible to traffic entering from any side road. Additional
advance warning and Flagger Ahead symbol signs may be placed on
the side road(s).
9. Sign set-up and flagger placement shown may be used for intermittent
full road closures of 20 minutes or less.
10. The"ONE LANE ROAD AHEAD" (W20-4)sign is optional and should
be considered on high volume or high speed roads, or when extended
queues are expected.
Chapter 5 December 2011
t
2011 Edition Page 85
!Stationary Lane Closure with Flagging Diagram 320:M .o
w aC
Zoe O
v�
o m CM
1 1
wa
O
m� 3
Qo Jt I H
a
Cd
Q
c
----- --------- I • • 00-1
---- i ••• ;o m
I
u I I °® C�v
Al t CD
` I I EE
I I • 3
O I: ° m
® �
I 8L Z I •
.._
LL r e I Wa
j rn Y I wad
c I 00 m¢o
I CO �� I a~
------------------
Sign Spacing and Buffer Lengths(feet) I t W c
Posted S acini Between Si ns Buffer C
Speed A B c Space z= Q 0
20 50
25 100 100 100 75
30 100
125
Y
40 1
350 350 350 150 O O
45 180 ¢3
50 500 500 500 210
55 250
December 2011 Chapter 5
Page 84 2011 Edition
;Stationary_Lane_Closure with_Flagging Diagram 320'
Diagram 320 covers total closure of one lane of a two-lane, two-way
roadway. See the detail inset for the layout if using a single flagger to control
both directions of traffic on low volume roads (less than 400 ADT)with good
sight distance as discussed below.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Flaggers at each approach are required if any of the following
conditions exist:
a. Night Operations.
b. Work space is over 200 feet in length.
c. Sight distance is less than 750 feet from each approach
through the lane closure.
d. Traffic volumes are greater than 400 ADT.
4. The length between the Flagger Ahead signs shall not exceed one
mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one
mile.
5. Cones should be used to outline the work space when curves or other
roadway alignments prevent clear direction for the motorists to pass
the work space safely.
6. Cones along the work space are recommended when posted speeds
are 45 mph or greater, when working under heavy traffic or when travel
lanes are narrower than 11 feet.
7. Extended queue signing (see Diagram 5-4)should be used when
traffic queues extend beyond the initial advance warning sign.
8. When flagging near an intersection, the "Flagger Ahead" (CW23-2)
sign should be visible to traffic entering from any side road. Additional
advance warning and Flagger Ahead symbol signs may be placed on
the side road(s).
9. Sign set-up and Flagger placement shown may be used for intermittent
full road closures of 20 minutes or less.
10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should
be considered on high volume or high speed roads, or when extended
queues are expected.
Chapter 5 December 2011
2011 Edition Page 85
,Stationary Lane Closure with Flagging Diagram 320
Q3� o
82CL
O
ZO
g ��
� l t
�a LL
w�
mL�
Qo I H
IL
Q
• • ii a
I I • Do ID
•® oo0
8
¢ m l T I m i 2M`n
® � •
•
1v m Z •
O �.. I • •
LEC
I coo o�. I < I I •f—
LL.
VoI • LU
I I t is I 00 m W o
------------— I
Sign Spacing and Buffer Lengths(feet) 1 1 20
c
Posted S acin ,Between Si ns Buffer 0
Speed A B C Space z a Td
20 50
25 100 100 100 75
30 100
125 C3 Y
40 350 350 350 150 O O
45 180 ¢3
r-5-0-1 500 500 500 210
55 1 250
December 2011 Chapter 5
a WL 1-2 Span: LEGEND
Install: WL 2 :
(60)494- 1-RUN OF 4/0 AL URD TX Install: REMOVE/ABANDON FACILITIES INSTALLFACIL/TIES
(60)CONTRACT BORECREW TO WIRE TO EXISTING METER GROUN 43ONDPER
(60) 1 3"CONDUIT � �114� AND GROUND ABANDONED CABLE
Abandon: i 971-400-1492 Conductors
1-RUN OF 4/0 AL URD TX SHARON PRICE
503-730-9610 ______ INSTALL 14q AL-TX SECONDARYPROVIDED AND INSTALLED BYPGE
1-3-CONDUIT PROVIDED AND INSTALLED BY PGE APPROVED CONTRACTOR
7128 - / �• WR CHECKLIST
2011 J t ITEM YES COMMENT
P
4992 HOLEDIGGER
BOOM
VT-6822
BACKHOE
U- 3 PGE TRENCH
71
B 2 AI- LL w 20'-Unkno BORE x 60 FT
2011X
LOCATES
STAKING
S�7pb,Ty FLAGGING x
TREETRIM
LANDSCAPE X
•
EASEMENT
WL 1 VT-3:
~ PERMITS X CITY OF TIGARD
J Install: TRAFFIC PLA X
JUNCTION BOX 1730
/4 \ (3)6 POSITION BUS, SUBMERSIBLE cIT IR.ET
VE
7127 UG CIR.VER.
20'Slnk — Pem DVL.: RANSM ISSION
2011 E JUNCTION BOX, 1324 SHUTDOWN
U
• 3 (3)4 POSITION BUS, SUBMERSIBLE CUSTOMER x
CO SHUTDOWN 14 ACCOUNTS
0 20 40 80 F et
e"z PL acE
DOOR HANGAR
CONTACT
COMPANY
PH# C#
ll TIME
PGE CONSTRUCTION DRAWING
I.- . -°-h NEST VIOLATIONS CORRECTED
Foreman Date
General Foreman. Date
SDPMiENG REVIEW SBUILT BYDES/GNER
"E ""'
SCAL ACCOUNT ANO LOB NO
^ 11/23/2015 AS SHOW 1070001 0000014628 M1723517
TITLE REPLACE BIO UG SECONDARY-6OFT
ATTENTION: CALL 811 BEFORE YOU DIG ` cracu`T TIGARD-13361 SIZE
11x17
OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED
THINK BY THE OREGON UTIUTY NOTIFICATION CENTER. , ME/ LOCATION 12250 SW 106TH OR,TIGARD OR
THOSE RULES ARE SET FORTH IN OAR 952-001-0010 , DESCRIPTION
THROUGH 952.001-0090 YOU MAY OBTAIN COPIES OF ` REPLACE SEC VAULT AND INSTALL SEC CBL TO 12250 $MEET
SAFETY
THE RULES BY CALLING THE OREGON UTILITY
NOTIFICATION CENTER ADMINISTRATION @(502.232.1987) ^OUNTY SECTIONS K H
FIRST WASHINGTON C2103A
TO REQUEST UTILITY LOCATES CALL THE OREG01. KItoBI1Y11et1 tIC�OW 1-1— HONEI 3 AWN BY tOF1
UTILITY NOTIFICATION CENTER,811 AT LEAST Cali before YOU ft PHIL MERRIMAN %3.6943 PHIL MERRIMAN
Vicinity Map 2 BUSINESS DAYS PRIOR TO EXCAVATION
19
RECEIVED
City of Tigard DEC 0 3 2015
PUBLIC WORKS—ENGINEERING PGE WORK ORDER# M172 7 �D
LF. iGINEERING
Public Facility Improvement (PFI) ermlt
DESCRIPTION OF WORK(in the right-of-way) REQUIRED SUBMITTAL
Check one: IN Utilities ❑ Sidewalk/driveway approach ❑ Street improvements ELEMENTS
Detailed description: Replace Sec Vault and Install Sec CBL to M Minor work in right-of-way
(sidewalk repair,curb cut,street
12250. Bore 60ft opening,etc.)requires:
•Application form,completed
and signed
•Submit one(1)copy of scaled sketch
Property address/location(s): 12250 SW 106th Drive, Tigard OR of the proposed work to be done
•Submit one(1)copy of traffic
control plan
—OR—
Phil Merriman /Tsahai Anderson E] Substantial project work requires
Applicant's name: above items and professional
Address: 10800 SW Avery Street engineered plans for:
Tualatin OR 97062 •Street widening
City/state: Zip •Subdivision infrastructure
Phone: 503-612-6106 Email: T&DSuppoMvery@pgn.com •Main utility line extension:
- Storm Drain,Sanitary—Tigard
- Water—Tigard Water Service
Contractors name: Area(includes Durham,King City
CCB#: Expiration: and a portion of unincorporated
Washington County)
Address:
DELIVER APPLICATION TO:
City/state: Zip:
City of Tigard
Phone: Email: Planning/Engineering
13125 SW Hall Blvd.
Engineer's name:
Chris Bolton Tigard,OR 97223
2213 SW 153rd Drive Applications for"minor work in right-of-way'
Address: only may be emailed to:
City/state: Beaverton, OR Zip: 97006 ronTermits rigard-o�r.gov
Phone: 503-672-5469 Email: Chris.Bolton@pgn.com
FOR FF p S •
NLY
Case No.: ;
Estimated value of work (within the public right-of-way): $
Application submittal fee:
Is work related to a LAND-USE DECISION? ❑ Yes M No Application accepted:
If so,please specify (MLP, SDR,SUB, etc.) case#: By: �P Date: 213 i S
Is work related to a BUILDING PERMIT? ❑ Yes M No ApplieWtlewed:
:_If so,please specify(BUILDING PERMIT)case#: ByDate:
Applicant notified:
By: Date:
I:\CURPLN\Masten\Land Use Applications R-07/16/2014
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 www.tigard-or.gov • 503-718-2421 • Page 1 of 4
APPLICANTS
NOTE: Person specified as "-applicant" shall be designated"Permittee" and shall provide financial assurance for work.
*When the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written
authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written
authonzation with this application.
BY SIGNING BELOW,THE APPLICANTS) SHALL CERTIFY THAT:
• The above request does not violate any deed restrictions that may be attached to or imposed upon the subject property.
• If the application is granted, the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
• All of the above statements and the statements ui the plot plan,attachments,and exhibits transmitted herewith,are true;and
the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application,including the policies and criteria,and understands the
requirements for approving or denying the application.
SIGNATURES of each owner of the subject property required.
Dgilally sg.d by TSAHN ANDERSON
TSAHAI ANDERSON amal=TSAHAIAANDERSON@PGNLOM,-US
D• Permit Coordinator 12/3/15
` �ezo�s.u.wioorzaoeoo
Applicant/Authorized Agent's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
PUBLIC FACILITY IMPROVEMENT PERMIT
Cityof Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov 503-718-2421 • Page 2 of 4
WL 1-2 Span: LEGEND
Install: F
(60)494- 1-RUN OF 4/0 AL URD TX VE FACILITIES _INSTALL FACILITIES
(60)CONTRACT BORECREW TO WIRE TO EXISTING METER GROJN0430M PER
[24010.2
(60) CONDUIT DAN-RI-CE AND GROUND ABANDONED CABLE
Abandon:
: 971-400-140-14 92 Conductors
SHARON PRICE
1-RUN OF 4/0 AL URD TX 503-7.30-9610 — - INSTALLI-4AALTXSECONDARY PROVIDED AND INS TALLIED BYPGE
--- j 1-1-CONDUIT PROVIDED AND INSTALLED BYPGE APPROVED CONTRACTOR
j
7126 - / � � WR CHECKLIST
Y G
L0-2011J2 �} ITEM YES COMMENT
/ m
4/ ..,, HOLEDIGGER
666 ,.�
VT6822 �\ BOOM
� BACKHOE
U o 71 PGETRENCH
N AL M 20'-UDkn BORE x 60 FT
2011 LOCATES x
STAKING
- S�7pb,TH FLAGGING x
TREETRIM
�\ LANDSCAPE X
EASEMENT
I; WL 1 VT-3:
install: TRAFFIC PLA x PERMITS X CITY OF TIGARD
a JUNCTION BOX 1730 �,/ '
(3)6 POSITION BUS, SUBMERSIBLE UTSHEET
7127 UG CIR.VER.
20--V 111m0'rIrt
Remove: RANSMISSION
zD11 .4 JUNCTION BOX, 1324 SHUTDOVM
U
♦ 3 (3)4 POSITION BUS, SUBMERSIBLE CUSTOMER x
0 20 40 80 Flet N SHUTDONM 14ACCOUNTS
BgAL�;�e
DOOR HANGAR
CONTACT
COMPANY
PH# C#
F ►.
DATE
f PGE CONSTRUCTION DRAWING
AS-BUILT VERIFICATION&NESC VIOLATIONS CORRECTED
Fomm#n: DNB:
General Foremen: DNB:
SDPMYENG REVIEW SBUILT BYDESIGNER
1ATESCALE ACCOUNT AKO J09776-
- 11/23/2015 AS SHOW 070001 0000014628 M1723517
TITLE REPLACE 6/0 UG SECONDARY-60FT
AATTENTION, CALL 811 BEFORE YouCALL 811 H�F�R�Y0�011 ` cr ul TIGARD-13361 SIZE 11X17
OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED , /Ar C� C"LOCATION
THINK BY THE OREGON UTILITY NOTIFICATION CENTER. r V E 12250 SW 106TH DR.TIGARD OR
THOSE RULES ARE SET FORTH IN OAR 952.001-0010
SAFETY THROUGH 952-001-0090 YOU MAY OBTAIN COPIES OF \ REPLACE SEC VAULT AND INSTALL SEC CBL TO 1225 SHEET
THE RULES BY CALLING THE OREGON UTILITY COUNTYSECTIONS H
FIRST NOTIFICATION CENTER ADMINISTRATION (502.232-19821 WASHINGTON C2103A r 1 OF 1
TO REQUEST UTILITY LOCATES CALL THE OREGO', 81100 wNit1 DESIGNBv H N v
UTILITY NOTIFICATION CENTER,811 AT LEAST Call before you dig. PHIL MERRIMAN %3-6943 PHIL MERRIMAN
Vicinity Map 2 BUSINESS DAYS PRIOR TO EXCAVATION
Page 84 2011 Edition
Stationary Lane Closure with Flagging_ Diagram 320
Diagram 320 covers total closure of one lane of a two-lane, two-way
roadway. See the detail inset for the layout if using a single flagger to control
both directions of traffic on low volume roads (less than 400 ADT)with good
sight distance as discussed below.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Flaggers at each approach are required if any of the following
conditions exist:
a. Night Operations.
b. Work space is over 200 feet in length.
c. Sight distance is less than 750 feet from each approach
through the lane closure.
d. Traffic volumes are greater than 400 ADT.
4. The length between the Flagger Ahead signs shall not exceed one
mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one
mile.
5. Cones should be used to outline the work space when curves or other
roadway alignments prevent clear direction for the motorists to pass
the work space safely.
6. Cones along the work space are recommended when posted speeds
are 45 mph or greater, when working under heavy traffic or when travel
lanes are narrower than 11 feet.
7. Extended queue signing (see Diagram 5-4)should be used when
traffic queues extend beyond the initial advance warning sign.
8. When flagging near an intersection, the "Flagger Ahead" (CW23-2)
sign should be visible to traffic entering from any side road. Additional
advance warning and Flagger Ahead symbol signs may be placed on
the side road(s).
9. Sign set-up and flagger placement shown may be used for intermittent
full road closures of 20 minutes or less.
10. The"ONE LANE ROAD AHEAD" (W20-4)sign is optional and should
be considered on high volume or high speed roads, or when extended
queues are expected.
Chapter 5 December 2011
2011 Edition Page 85
;Stationary Lane Closure with Flagging Diagram 320
Y
C
°0 3 o
C LU Q L
ZOa CL
ui O J 117 O
O O V
¢ I
W U, m " j 1
mawM LUcc3
a
Q
• m c
------------------ I • Dov
•' 0 0 4)
I I • c6L
I 1 1I m i ti2CO
I I EE h
e
I 02
&� I i
LL r If I I o a
M LpU�p
I C� I Y I • ma0
m w
1 1 I CL
----------------I I In
Sign Spacing and Buffer Lengths(feet) 1 1 s c
Posted S acin Between Si ns Buffer
Speed A B c Space zo 0
20 50
25 100 100 100 75
30 100
35 125
Y
40 350 350 350 150 O O
45 180 ¢3
50 500 500 500 210
55 250
December 2011 Chapter 5
Page 84 2011 Edition
'Stationary Lane Closure with Flagging Diagram 320
Diagram 320 covers total closure of one lane of a two-lane, two-way
roadway. See the detail inset for the layout if using a single flagger to control
both directions of traffic on low volume roads (less than 400 ADT)with good
sight distance as discussed below.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Flaggers at each approach are required if any of the following
conditions exist:
a. Night Operations.
b. Work space is over 200 feet in length.
c. Sight distance is less than 750 feet from each approach
through the lane closure.
d. Traffic volumes are greater than 400 ADT.
4. The length between the Flagger Ahead signs shall not exceed one
mile. Use Diagram 340— Lane Closure with Pilot Car if exceeding one
mile.
5. Cones should be used to outline the work space when curves or other
roadway alignments prevent clear direction for the motorists to pass
the work space safely.
6. Cones along the work space are recommended when posted speeds
are 45 mph or greater, when working under heavy traffic or when travel
lanes are narrower than 11 feet.
7. Extended queue signing (see Diagram 5-4)should be used when
traffic queues extend beyond the initial advance warning sign.
8. When flagging near an intersection, the"Flagger Ahead" (CW23-2)
sign should be visible to traffic entering from any side road. Additional
advance warning and Flagger Ahead symbol signs may be placed on
the side road(s).
9. Sign set-up and flagger placement shown may be used for intermittent
full road closures of 20 minutes or less.
10. The"ONE LANE ROAD AHEAD"(W20-4)sign is optional and should
be considered on high volume or high speed roads, or when extended
queues are expected.
Chapter 5 December 2011
——————— N
N fpro ---1 '� O
n Uf(T A A W W N N C I "'
`°
C Single FlagT,Operation
a m
for Low
C, n olumesI I—• M
(Optional) O a
N W N (ADT<400) ro no.o O:
0 0 o Dd I BE 0
5. `° I PREPARED FLADGM0 ROAD E
CL e�epa�c� 1 TO STOP r
AHEAD
0 0 0 0° oo I r me. 4-
1
1 — r.®. — ♦— 1 ROAD
CD
WORK
c�e K e K A I.---I I AHEAD i0 l
Pmt d v*dit I O
CD
(T W(lN O V N y C PdA
O O O O(T O N O m y ... 1 1
ron�.o 4 I • A B
c
------------------------I H H �i
1 mile I �'
f max.PRO
�
•
B B
Buffer
Protection Vehicle
ROAD w/TMA(both Optionaq
WORK See Chapter 4 O
AHEAD
BE U3
0 ROAD E TO 8TOP Two Flagger Operation 0)
AHEAD
-5i M
cn (Optional) o 00