Loading...
Specifications /4s7`�vf5 — OO ri • (A O,- 5A) �7 Gr-c ar 0 -c,- f! Michael K. Brown, S.E. ,,, EcEivip 5346 E. Branchwood Dr. Boise, ID 83716 208-850-7542 Mikebrown.sePomail.com .JUN - 9 2015 ail'Of TIGARD LATERAL STRUCTURAL DESIGN t DIVISION CALCULATIONS FOR LOT 24, SOUTH VIEW TIGARD, OR ENGR. JOB # DM15-081 e.ti C#I r . 'r I Y vez , aF.,.ORE _if ' NG d EXPIRATION DATE: 12---31-151 Prepared for: StoneBridge Homes, NW, LLC Plan #: 327 OTE: 1861 Date: 6/04/2015 The following calculations are for retaining walls, lateral wind and seismic engineering only. Gravity loading and the design of foundations(with the exception of retaining walls)are outside the scope of this design. The design is based on information provided by the client who is solely responsible for its accuracy. The engineering represents the finished product. Discrepancies from information provided by the client invalidate this design. Michael K. Brown, S.E. and Core Engineering shall have no liability (expressed, or implied), with respect to the means and methods of construction workmanship or materials. Michael K. Brown, S.E. and Core Engineering, PLLC. shall have no obligation of liability, whether arising in contract (including warranty),Tort(including active, passive,or imputed negligence)or otherwise,for loss or use,revenue or profit, or for any other incidental or consequential damage Michael K. Brown,S.E. 5346 E. Branchwood Dr. Boise,ID 83716 208-850-7542 mikebrown.se@gmail.com Job Name: Lot 24, South View By: MKB Core Job Number: DM15-081 Date: June, 2015 Code Basis of Design: Latest Adopted Version of O.S.S.C. and O.R.S.C. Wind Loading: Either ASCE 7 or O.S.S.0 projected area method allowed. ASCE 7 used. Wind: 120 MPH ult wind speed, Exposure B, 12:12 Pitch roof Side to Side and 5:12 Pitch Front to Back. Per ASCE 7 Figure 28.6-1: Front to Back: Zone A: 31.6 PSF Zone B: 0 Zone C: 21.1 Zone D: 0 For Zones A and B, a=10% of least horizontal dimension or 0.4h (h=mean roof height), but not less than 3'. Least horizontal dimension = 35 feet Therefore, use a = 3.5 feet Side to Side Zone A: 25.7 PSF Zone B: 17.6 Zone C: 20.4 Zone D: 14 For Zones A and B, a=10% of least horizontal dimension or 0.4h (h=mean roof height), but not less than 3'. Least horizontal dimension = 42 feet Therefore, use a = 4.2 feet Upper Floor: Front to Back: Average force on projected wall = (total force at zone A + total force at zone C)/overall length: 23.2 PSF Average force on projected roof = (total force at zone B + total force at zone D)overall length: 0 PSF Wall Plate Height = 8 feet Projected Average Roof Height = 6 feet Total Wind Force at Upper Level = 3248 #, or 93 PLF Michael K. Brown,S.E. 5346 E. Branchwood Dr. Boise, ID 83716 208-850-7542 mikebrown.se@gmail.com Job Name: Lot 24, South View By: MKB Core Job Number: DM15-081 Date: June, 2015 Side to Side: Horizontal Dimension = 42 Feet Average force on projected wall = 21.5 PSF Average force on projected roof = 14.72 PSF Projected Average Roof height = 5 Feet Total Wind Force at Upper Level = 6696 #, or 159 PLF Mail Level: Plate height = 9 Feet Front to Back: Average force on projected wall = 23.2 PSF Projected Length = 35 Feet Total Wind force at Main Level = 7714 #, or 220 PLF Total Wind force Upper and Main = 10962 # Side to Side: Averag force on projected wall = 21.5 PSF Projected Length = 45 Feet Total Wind force at Main Level = 9174 #, or 204 PLF Total overall side to side wind force = 15871 Pounds Seismic Loading: DI seismic design category per O.R.S.C. Sips= .83, R = 6.5, W = weight of structure V = [1.2 S0s/R] W V = .154W Roof Dead Load = 15 psf Floor Dead Load = 12 psf Int. wall Dead Load = 6 psf Ext. wall Dead Load 12 psf Seismic Front to Back: Tributary Roof Length = 45 Feet Tributary Floor Length = 42 Feet Equiv. Trib Int wall Length = 40 Feet Trib. Ext upper wall Height = 4 Feet Trib. Ext lower wall Height = 4.5 Feet Michael K.Brown,S.E. 5346 E. Branchwood Dr. Boise,ID 83716 208-850-7542 mikebrown.se@gmail.com Job Name: Lot 24, South View By: MKB Core Job Number: DM15-081 Date: June, 2015 Wroof= 129.822 plf > 93 plf, therefore Seismic Gov. Wfloor = 132.594 plf < 220 plf, therefore Wind Gov. Total Seismic Load = 9184.56 Pounds < 10962 Therefore Wind Gov. overall Seismic Side to Side: Tributary Roof Length = 35 Feet Tributary Floor Length = 35 Feet Equiv. Trib Int wall Length = 15 Feet Trib. Ext upper wall Height = 4 Feet Trib. Ext lower wall Height = 4.5 Feet Wroof = 123.354 plf < 159 plf, therefore wind gov. Wfloor = 123.816 plf < 204 plf, therefore wind gov. Total Seismic Force = 10751.2 Pounds, < 15871 Pounds, therefore wind gov. overall Redundancy factor = 1.0 per ASCE 7, section 12.3.4.2 Roof Level Wall Lines: Line A: P = 130 * 17.5 ft = 2272 # Total Shear Wall Length = 18 Feet V=P/L = 126 PLF Use A wall Wall Height = 8 Feet Trib Roof Area = 2 Feet Shortest Wall Length 18 Feet Trib Floor Area = 0 Feet Mot = 12723 LB FT Factored Dead Load 76 PLF Mr = 12247 LB FT T = 26 LB No Uplift Line B: P = 130 * 17.5 ft = 2272 # Total Shear Wall Length = 14 Feet V=P/L = 162 PLF Use A wall Wall Height = 8 Feet Trib Roof Area = 2 Feet Shortest Wall Length 14 Feet Trib Floor Area = 0 Feet Mot = 12723 LB FT Factored Dead Load 76 PLF Mr = 7409 LB FT T = 380 LB No Uplift Michael K. Brown,S.E. 5346 E. Branchwood Dr. Boise,ID 83716 208-850-7542 mikebrown.se@gmail.com Job Name: Lot 24, South View By: MKB Core Job Number: DM15-081 Date: June, 2015 Line 1: P = 159 * 21 ft = 3348 # Total Shear Wall Length = 14 Feet V=P/L = 239 PLF Use A wall Wall Height = 8 Feet Trib Roof Area = 21 Feet Shortest Wall Length 14 Feet Trib Floor Area = 0 Feet Mot = 16072 LB FT Factored Dead Load 247 PLF Mr = 24167 LB FT T = -578 LB No uplfit Line 3: P = 159 * 21 ft = 3348 # Total Shear Wall Length = 19 Feet V=P/L = 176 PLF Use A wall Wall Height = 8 Feet Trib Roof Area = 6 Shortest Wall Length 4 Feet Trib Floor Area = 0 Mot = 3383 LB FT Factored Dead Load 112 PLF Mr = 893 LB FT T = 623 LB Perp wall and HDR to resist 2nd Floor / Low Roof Wall Line: Front to Back: Line A: P = 220 * 17.5 ft + 1624 = 5481 # Total Shear Wall Length = 24 Feet V=P/L = 228 PLF Use A wall Wall Height = 9 Feet Trib Roof Area = 2 Feet Shortest Wall Length 24 Feet Trib Floor Area = 2 Feet Mot = 29597 LB FT Factored Dead Load 97 PLF Mr = 27994 LB FT T = 67 LB No Uplift Line B: P = 220 * 17.5 ft + 1624 = 5481 # Total Shear Wall Length = 24 Feet V=P/L = 228 PLF Use A wall • • Michael K. Brown,S.E. 5346 E. Branchwood Dr. Boise,ID 83716 208-850-7542 mikebrown.se@gmail.com Job Name: Lot 24, South View By: MKB Core Job Number: DM15-081 Date: June, 2015 Wall Height = 9 Feet Trib Roof Area = 2 Feet Shortest Wall Length 24 Feet Trib Floor Area = 2 Feet Mot = 29597 LB FT Factored Dead Load 97 PLF Mr = 27994 LB FT T = 67 LB No Uplift Side to Side: Line 1: P = 204 * 12 ft + 3348 = 5795 # Total Shear Wall Length = 18 Feet V=P/L = 322 PLF Use B wall Wall Height = 9 Feet Trib Roof Area = 20 Feet Shortest Wall Length 4 Feet Trib Floor Area = 8 Feet Mot = 6954 LB FT Factored Dead Load 302 PLF Mr = 2419 LB FT T = 1134 LB Use type l or 5 HD Line 2: P = 204 * 23 ft + 0 = 4689 # Total Shear Wall Length = 24 Feet V=P/L = 195 PLF Use A wall Wall Height = 9 Feet Trib Roof Area = 0 Feet Shortest Wall Length 24 Feet Trib Floor Area = 12 Feet Mot = 25321 LB FT Factored Dead Load 151 PLF Mr = 43546 LB FT T = -759 LB No Uplift Line 3: P = 204 * 12 ft + 3348 = 5795 # Total Shear Wall Length = 9 Feet V=P/L = 644 PLF Use C wall Wall Height = 9 Feet Trib Roof Area = 6 Feet Shortest Wall Length 2 Feet Trib Floor Area = 0 Feet Mot = 6954 LB FT Factored Dead Load 119 PLF Mr = 238 LB FT T = 3358 LB Use HD Type 2 Michael K. Brown,S.E. 5346 E. Branchwood Dr. Boise,ID 83716 208-850-7542 mikebrown.se@gmail.com Job Name: Lot 24, South View By: MKB Core Job Number: DM15-081 Date: June, 2015 Lateral at Deck: Roof Level: No walls and 4:12 slope roof. Wind loads are minimal compared to Seismic. Roof Weight = 1500 pounds Lateral Load, P = 231 Pounds Use Knee Braces: P > Each knee brace in tension only and at 45 degrees. Force in each brace = 136 Pounds Capacity of#10 screw in Hem Fir = 101 pounds/screw. With seismic 101 * 1.6 = 161.6 Required number of screws = 0.839963 Use 2 #10 screws • • Michael K.Brown,S.E. 5346 E. Branchwood Dr. Boise,ID 83716 208-850-7542 mikebrown.se@gmail.com Job Name: Lot 24, South View By: MKB Core Job Number: DM15-081 Date: June, 2015 Deck Level: Dead Load: 2x Decking 5 psf 2x8 @ 16" o.c. 2.2 psf Misc. 1.8 psf Total = 9 psf Live Load = 40 psf(match interior live load) 2x8 at 16"o.c., OK 5' V 20' V=0.154[9psf(572)(20')]2+231# = 385.0 Pounds 385# 9'-0" i 20'-0" Typical Bay Force at Each Brace = 385.0 pounds horizontal (tension Only): 1 bay Axial force in brace = 641.7 Pounds 2x6 bracing with (4) # 10 screws (Loads shown are for 2 level deck, so okay at bottom level cross bracing too) . . •' . . • , ,..,. .......,, 1110618$4111183 IMPSE0094050 . . . . .. , . . I : . . . • . • , . . .. i 1 ,/ . 1 '• . . . . . . ! f.\1 : • . .• : .•' , . . : .', . • . . i • , '•` 1 '': , "„„ ,• ', , . , \.........' . . . , • . , . . • • • , . •. „' ,. . , MI . . .... .., , . . . , ..„..,,.....,...,,..„, .. 1 ,, 11 ' . •:, . ,: I , •'. ,..:, .,. •, , ,• . 11 . , . . . . . . .. . .. '.: . . 11 .' •i . , , . •t . .1 ' . •, , •, • . . . ...... .. ... :. . .. ......... .. : .. . 1 , . .. . .. ......... ...... 1 ,M , ; • , , . i\AA1N FLOOR PLAN UjPER FLOOR PLAN iiiiij---Bwilir Niiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiifoliffiliii 1 liafiEzol,Acc„EiRe r U111•111,14111), 111111111111111111111111111101111111111111111111V VHS 110 111 , MAY VARY. i'ALL DIMENSIONS ARE ESRMATES, 'Olt II I N1111111111111111111111111111111MW I Nom i 1 , SOME MAY VARY. 11111.W ' 1111111111.11111111111111110r WON I. 1 1r4 ?ICIFITAWIERE. S owl' r-i leaminlionosommir IA- limail 1 114,E4 awl.475. TOP PHIF IPnoir 1 ill 1 111111111111111111r 1 i "RznamEnnsi Mir — 1111111111111110111, 4 i1lel , HOME YALL LOOK.' ' `11111111111P' LATE EIGHT 11111,ta.-12 yr . : ; I IIIIIIIIIIIIIIIIIIII 1 •111.111111111111111111 .• • 1 M --——1. : ISIIIIIIIIIIIIIIIII I III 1 I t.i.r.,.V- ITrr"riT4:4:14101 e•_........_ ..„...„, , GHT .. -t 1 • SECOND FIR.H° 4"2PI., I . I. 11 Mb! GM at intioniamo in iiimmu II 1 i NIP 0.-12 I 11111111111,1.I I 1101111111 _IIII 111.111111N11 1111 !_.II' .._ inomuss , 11111111111.., BC_ Ill LINO ' . 0 TOP PLATE 1 - ___ — ,,-- 1 NM •1111.11— 0 0 -------";... _t_....L , -1-•1 Num um -- • , ol• In n NI Ill In = 111 .---1.....11 NI -- 17_1= CI = 1=1 E71;,:1-1171 El IE mu --, ......., {-R,or , i...... . ..i _ - 0 FINISHED RR'HEICHT 1 1.11111111111111111.11.1111111111111..1 ... .... ._ .„.1.. ,= = = ED =,.,-- jr-i n I-1a _.... ..,.. ..... ..., ,............, ..,....., .4: . 11111 HIP- ' -—9-1' MI i Iiii-111111111111 1111 . 1 r . . 611111111BNIIIIIMIIIMM11111111111111111111011111111111M11111111111111101111111111.111$0111 „.„-- 111111111111111111111111M111111111111111011111111111110111111111111111111111M111111111111111111111111111M11111111111111111111 1111111101111111111111111111111111111111111111111111111111111111111111111111111111111111111011111111111111111111NE .,,•, '-' 11111111111.1111N111111111111111111011Ing12111111111111111191111111101.1111111111111111MMilli 0111111111111111111MIN11111111112111101111111111111111111111111111111111111111111111111111111111111111111111111111111 OTOP PLATE HEIGHT 119IIMUMINIII91,192MINIAINEVINIUMNINERIEUPVI ---, I 0 SE10.COND.FIR.HEIGHT 1 I • . 1111 W. "fpif 1 --117-1T4W, t 1 ii • . I (Th0 TOP PLATE 1 -------- 1 1• 1 I ; . 1 : IITIIIIFI 11 I 11111 ° 11.!Ill I1 •111111 ;II,11 II 1.1 ; 1 Ilk FINISHED FLR.HEIGHT , ,, 1•• 1 _I— •1'.•'•-,„ /1111/1 f'.. .•\ // ----lj ....1 ,:_....._.1 1 .•• ! ‘, :,. / / ".>.1-NiC --.1., :•• 0:',, ! ,:.i '..- \„,,'i,, H C N ,---i —bn,u,...4,..,,,,,,,,A,-,--.A—...,-7...::: ..iw&--'1..L.-4>,-;,... ...., 1 'SQUARE FOOTAGE IS AN -------- -.----. _ MAYESTIMATEDVARY.FIGURE,IT L MAY VARY. 1 PITCH I I �1 ,w. ` •ALL D�MENSI�HS ARE ESTIMATES, , , SOM MAV ARV. 1 1 I •PLANS ARE DESIGNED FOR n JI, ...........______._...._._.__... ... MT LOTS IF MASONRY IS �, � ������Q��`,• m•." " 5 ' INCLUDED IN PLAN.THERE `1.. .. f ,..,LI.. ,'.:.........................._._.........__.........._................................. ' P/ IS AN ADDITIONAL CHARGE IF - ,:--, „.' •.,o. HOME SITE IS NOT FLAT. _C.... .., '.. .._11. .1.1.-A.l.. :''' .. •ARCHITECURAL DRAWINGS 7 •' ARE ESTIMATES OF HOW i[ j 1� "' HOME WILL LOOK. I71)TOP PLATE HEIGHT .................................................................._.._..........__..........._.._.........._........_..._._.____.._._...........................__.._............._._ _.................. ...._.........._ " • „s" /T`\SECOND FIR.HEIGHT •--" 4,12 I. (..7").TOP PLATE i �., ,5.-€ .. ......................................_.............. .. _..........:.:.. ...._._................._........................._................_......._.........._.__................................__._...__.._._..._......_..... _.. , [ , FINISHED FLR. HEIGHT ...__.—..-................................_................._......._..___..___.._..._.___.__..._..........._..______._._. .._...._.._____...._...._._.___ __..__.....__....__....___..__........_.._____.._.____.__.._.. .. __ r ,.-' .._. '.1„ �. .€ 1 II._,�.(_I _ .... .. .. 1L:12 PIT `` L.__-._. .F�_._..____._...._....-_..-..__""________.._..._.............. �..........._ E r _ „I.� Illlll..i...,,,...». ■N II ;mm (I (— • Q• F .. j € ill .., p ................._..............................................._...._........_.._..__....._...................._......_..._...._.............__..........._................................... .....__..._.....__._... ,,, _ i - " 1 1 -. ' SHEARWALL SCHEDULEa-m MARK REF NOTES: (a,i) Note: (b) EDGE NAILING FEILD NAILING'SILL TO CONCRETE SILL TO WOOD SHEAR TRNASFER Lbs NUMBER SHEATHING NAIL SIZE SPACING SPACING CONNECTION. Note: (c) CONNECTION. Note (g) CLIPS (h) CAPACITY A 16" OSB (1) SIDE 8d 6" 12" 2" Dia. A.B. @48" o/c 16d@6" o/c A35@18" o/c 384 B 16" OSB (1) SIDE (f) 8d 4" 12" 2"Dia. A.B. @ 24" o/c 16d @ 4" o/c A35 @ 14" o/c 560 C 16" OSB (1) SIDE (e,f) 8d 3" 12" 2" Dia. A.B. @ 18" o/c (m) 16d @ 3" o/c A35 @ 11" o/c 720 D 16" OSB (1) SIDE (e,f) 8d 2" 12" Z"Dia. A.B. @ 16" o/c (m) 16d @ 2" o/c A35 @ 8" o/c 936 E 16" OSB (2) SIDE (d,e,f) 8d 6" 12" 2"Dia. A.B. @ 18" o/c (m) 16d @ 3" o/c A35 @ 10" o/c 768 F16" OSB (2) SIDE (d,e,f) 8d 4" Staggered 12" 2"Dia. A.B. @ 12" o/c (m) 16d @ 2" o/c A35 @ 7" o/c 1120 G16" OSB (2) SIDE (d,e,f) 8d 3" Staggered 12" 2"Dia. A.B. @ 10" o/c (m) 16d @ 3" o/c(2)rows staggered A35 @ 5" o/c 1440 H 16" OSB (2) SIDE (d,e,f) 8d 2" Staggered12" 2"Dia. A.B. @ 8" o/c (m) 16d @ 2" o/c(2)rows staggered HGA10KT @ 7" o/c 1872 Notes: a) Wood structural panels shall conform to the requireents for its type in DOC PS 1 or PS 2. All wall construction to conform to AF&PA SDPWS per IBC 2306.3. b) Use Common Wire Nails for all wood sheathing and cooler nails for gypboard sheathing. c) A.B. minimum 7" embed into concrete. 3"x3"xY4" plate washers req'd at all shear wall A.B. Locate edge of Washer no greater than 2" from sheathed edge of sill plate. d) Panel joints shall be offset to fall on different framing members or framing shall be 3x or thicker and nails on each side shall be staggered. e) 3x or Dbl 2x framing at all panel edges and nails shall be staggered. f) All edges blocked. g) Common Wire Nails. h) Clip to be attached from continuous blocking to top of continuous top plates. Clips are not required at Gyp Bd walls but blocking is attached per the toenailing schedule. i) See attached typical shearwall details. j) Sheathing to be Structrual I Sheathing. k) Values are for framing of H-F. m) See plan for walls where seismic design shear is greater than 560 plf. 3x or 2x flat blkg at panel edges, Stagger nails. Where indicated on the plans 3x sills are required with A.B. spacing as per plan and schedule. See note C for plate washers req'd at A.B. For walls with the larger sills, Anchor Bolt spacing may be increased by a factor of 1.25 from the table above due to thicker sills. HOLDOWN SCHEDULE MARK Boundary Tension of DF Tension of HF Anchor Anchor NUMBER HOLDOWN Studs Allowable Lbs Allowable Lbs Mono Pour Two Pour 1 HDU2-SDS2.5 OR (2)2x 3075 2215 SSTB14 SSTB2OL PHD2-SDS3 2 HDU4-SDS2.5 OR PHD5-SDS3 (2)2x 4545 3270 SSTB16L SSTB2OL MIN 3 HDU8-SDS2.5 (3)2x 7870 5665 SSTB28L MBEDI INTO ON EMBED CONC. A36 THREADED ROD w/HEAVY SQ. NUT AND BP7/8-2 BEARING PLATE WASHER @ BOTT. 4 HDU11-SDS2.5 (1)6x 9535 6865 1°DIA.x42"A36 1"DIA.x42"A36 THREADED ROD w/ THREADED ROD w/ 8 HHDQ14-SDS2.5 (1)6x 13710 10745 HEAVY SQ. NUT ANDHEAVY SQ. NUT AND WASHER @ BOT. WASHER @ BOT. PROVIDE 24"EMBED PROVIDE 24"EMBED INTO CONT FTG. INTO CONT FTG. 5 MSTC28 (2)2x 3000 2590 N/A N/A 6 MSTC40 (2)2x 4335 3745 N/A N/A 7 MSTC66 (2)2x 5660 5660 N/A N/A Notes: 1 . Install all holdowns per manufactureer specificaiton per latest Simpson Strong Tie catalog. 2. Match studs on schedule for walls below on all wall to wall holdowns. 3. (Multiple)2x studs nailed together with (2) rows of 16d @ 3" o.c. staggered. 4. Refer to shearwall schedule and typical shearwall details for wall locations and configurations. 5. Refer to Simpson catalog for minimum embed of anchors into concrete.