Permit CITY OF TIGARD BUILDING PERMIT t COMMUNITY DEVELOPMENT Permit#: BUP2015-00325 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 11/19/2015 Parcel: 1S135CD09200 Jurisdiction: Tigard Site address: 11477 SW GREENBURG RD Project: EUROPEAN CLASSIC HOMES LLC Subdivision: 1994-102 PARTITION PLAT Lot: 3 Project Description: Foundation demolition only. Contractor: SCANDINAVIAN GENERAL CONTRACTING Owner EUROPEAN CLASSIC HOMES LLC 7608 SW PINE ST 7608 SW PINE ST TIGARD, OR 97223 PORTLAND, OR 97223 PHONE: 503-452-9457 PHONE: 503-515-9464 FAX: 503-452-9457 Specifics: FEES Description Date Amount Type of Use: SF Class of Work: DEM Type of Const: Permit Fee-Additions,Alterations, 11/19/2015 $149.75 Demolition Occupancy Grp: Occupancy Load: Info Process/Archiving-Sm$0.50(up to 11/19/2015 $0.50 Dwelling Units: 0 11x17) Stories: 0 Height: 0 ft Erosion Control w/Development 11/19/2015 $80.70 Bedrooms: 0 Bathrooms: 0 Value: $5,000 Floor Areas: Total Area 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck 0 Garage: 0 Mezzanine: 0 Total $230.95 Required: Required Items and Reports(Conditions) 1 Ersn Cntrl 503-639-4175 Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code. State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days ATTENTION Oregon law requires you to follow the rules adopted by the Oregon Utility Notification enter Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503. 32.1•: 1.800. 32.2344. Issued By: • ',Mee Signature: • 13.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application „MQ I I .z Residential RECEIVE , I t11j (►' ' 't I I \I "\" City of Tigard y`: ilia !S - Permit No.: .,26,,s-Gt93o15- • 13125 SW Hall Blvd.,Tigard,OR 97223 NOV 12 2015 Plan Review g Phone: 503.718.2439 Fax: 503.598.1960e/By: Other Permit: I I \isI, Inspection Line: 503.639.4175 CITY OF TIGARD Date Ready/By: 1 's: 0 See Page 2 for Internet: www.tigard-or.gov BUILDING DIVISIa1 onfiedimethod: /f//4/(j ' ii. Supplemental Information Cl New construction tiliDemolition Permit fees* are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSI'RUCTIO . work indicated on this application. 10 1-and 2-family dwelling ❑Comercial/industrial Valuation: $ r d O d , m ❑Accessory building ❑Multi-family _ Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: `JOB SITE INFO' , :'i N yAND + Total number of floors: Job site address: I I u 77 SuJ &Yt n kntr9 get. New dwelling area: square feet City/State/ZIP: •1--19 4r d o . 972-2-3 Garage/carport area: square feet Suite/bldg./apt.no.: I Project name: Covered porch area square feet Cross street/directions to job site: Deck area: square feet &&l..441.4A ' * 1 a g 11' Other structure area: square feet Subdivision: I Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK I work indicated on this application. t o f-b`tnotai 141 0A,1 y Valuation: $ Existing building area square feet New building area: square feet r El PROPERTY OWNER ❑ TENANT Number of stories: Name: G a rcpcc y C iQ t;t t it or kts u-C Type of construction: Address: —7bo g Stti} e r1 ,Si•• Occupancy groups: City/State/ZIP: Po 41 4 K d 0 Cf 7'L 13 Existing: Phone:( p', ) 9 S 9V( Fax:(ca) N ^9y57 New: i• 1 a CONTACT P • Business name: S Cam et(Plot Its 4 h (: rapt( eo r'rinkci-l Structural plan review fee(or deposit): Contact name: QV Pcl +z FLS plan review fee(if applicable): Address: X60 g Sc..) et rtg. .c.:f • Total fees due upon application: City/State/ZIP: Pat n q 4 L( b . 47223 Phone:((Lt5 ) 51 c 9 h I Fax::(003 ) (J • 9 qS7 Amount received: ff PHOTOVOLTAIC SO L SYSTEM E-mail: LDP g V I��( •COrvl Commercial and residential prescriptive installation of roof-top mounted Photo Voltaic Solar Panel System. Business name: Submit two(2)sets of roof plan with connection details tyr.r y" -°� etivArt and fire department access,along with the 2010 Oregon Address: Solar Installation Specialty Code checklist. City/State/ZIP: Permit Fee(includes planreview $180.00 and administrative fees): Phone:( ) Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.: 3"'70 44 1045 Total fee due upon appication: $201.60 Authorized signature: This permit application expires if s permit is not obtained 4 within 180 days after it has been accepted as complete. Print name: D 6-, - St�,j Date: / it/�S' *Fee Total set by Tri County Building Industry Service Board 1:\Building\Permits\BUP-RESPermitApp.doc 02/24/2011 440-4613T(l 1/02/COM/WEB) Building Permit Application Checklist One- and Two-Family Dwelling FOR OFFICE USE ONLY City of Tigard Received Pc 13125 SW Hall Blvd.,Tigard,OR 97223 AsseBy: Phone: 503.718.2439 Fax: 503.598.1960 Associated permits: I'I C.AR I 1 24-Hour Inspection Line: 503.639.4175 ❑ Electrical ❑ Plumbing ❑ Mechanical Internet: www.tigard-or.gov ❑ Other THE FOLLOWING ITEMS ARE REQUIRED FOR I'I..1.N REVIEW Nes No N/A I Land use actions completed. See jurisdiction criteria for concurrent reviews. ❑ ❑ El 2 Zoning. Flood plain,solar balance points,seismic soils designation,historic district,etc. ❑ ❑ . ❑ 3 Verification of approved plat/lot. ❑ ❑ ❑ 4 Fire district approval required. Name of district: . ❑ ❑ ❑ 5 Septic system permit or authorization for remodel. Existing system capacity ❑ ❑ ❑ 6 Sewer permit. ❑ ❑ ❑ 7 Water district approval. ❑ ❑ ❑ 8 Soils report. Must carry original applicable stamp and signature on file or with application. ❑ ❑ ❑ 9 Erosion control ❑plan ❑permit required. Include drainage-way protection,silt fence design and location of catch- ❑ ❑ ❑ basin protection,etc. 10 �i Complete sets of legible plans. Must be drawn to scale,showing conformance to applicable local and state ❑ ❑ ❑ building codes. Lateral design details and connections must be incorporated into the plans or on a separate full-size sheet attached to the plans with cross references between plan location and details. Plan review cannot be completed if copyright violations exist. 11 Site/plot plan drawn to scale. The plan must show lot and building setback dimensions;property corner elevations(if ❑ ❑ ❑ there is more than a 4-ft.elevation differential,plan must show contour lines at 2-ft.intervals);location of easements and driveway;footprint of structure(including decks);location of wells/septic systems;utility locations;direction indicator;lot area;building coverage area;percentage of coverage;impervious area;existing structures on site;and surface drainage. 12 Foundation plan. Show dimensions,anchor bolts,any hold-downs and reinforcing pads,connection details,vent size ❑ ❑ ❑ and location. 13 Floor plans. Show all dimensions,room identification,window size,location of smoke detectors,water heater, ❑ ❑ ❑ furnace,ventilation fans,plumbing fixtures,balconies and decks 30 inches above grade,etc. 14 Cross section(s)and details. Show all framing-member sizes and spacing such as floor beams,headers,joists,sub- ❑ ❑ ❑ floor,wall construction,roof construction. More than one cross section may be required to clearly portray construction. Show details of all wall and roof sheathing,roofing,roof slope,ceiling height,siding material,footings and foundation,stairs,fireplace construction,thermal insulation,etc. 15 Elevation views. Provide elevations for new construction;minimum of two elevations for additions and remodels. ❑ ❑ ❑ Exterior elevations must reflect the actual grade if the change in grade is greater than four foot at building envelope. Full-size sheet addendums showing foundation elevations with cross references are acceptable. 16 Wall bracing(prescriptive path)and/or lateral analysis plans. Must indicate details and locations;for non- ❑ ❑ ❑ prescriptive path analysis provide specifications and calculations to engineering standards. 17 Floor/roof framing. Provide plans for all floors/roof assemblies,indicating member sizing,spacing,and bearing ❑ ❑ ❑ locations. Show attic ventilation. 18 Basement and retaining walls. Provide cross sections and details showing placement of rebar. For engineered - ❑ ❑ ❑ systems,see item 22,"Engineer's calculations." 19 Beam calculations. Provide two sets of calculations using current code design values for all beams and multiple joists ❑ ❑ ❑ over 10 feet long and/or any beam/joist carrying_a non-uniform load. 20 Manufactured floor/roof truss design details. ❑ ❑ ❑ 21 Energy Code compliance. Identify the prescriptive path or provide calculations. A gas-piping schematic is required ❑ ❑ ❑ for four or more appliances. 22 Engineer's calculations. When required or provided,(i.e.,shear wall,roof truss)shall be stamped by an engineer or ❑ ❑ ❑ architect licensed in Ore•on and shall be shown to be :s i licable to the s ro'ect under review. It RItiI)I( I IONAL SPF('IFIC'S 23 Three(3)site plans are required for Item 11 above. Site plans must be 8-1/2"x 11"or 11"x 17". ❑ ❑ ❑ 24 Two(2)sets each are required for Items 16, 19,20 and 22 above. ❑ ❑ ❑ 25 Building plans shall not contain red lines or tape-ons. "Mirrored"buildingplans will not be accepted. ❑ ❑ ❑ 26 "Reversed"building_plans must meet criteria outlined in the Permit&System Development Fees document. ❑ ❑ ❑ 27 "Drawn to scale"indicates standard architect or engineer scale. ❑ ❑ ❑ 28 Site plan to include tree size,type and location per approved project street tree plan(if applicable),and City of Tigard ❑ ❑ ❑ Street Tree List. 29 Site plan to include trees and tree protection measures as required by conditions of approval. Tree locations,driplines, ❑ ❑ ❑ and protection measures must be drawn to scale and must include the project arborist's signature of approval. 30 A Clean Water Services'Sensitive Area Pre-Screening Site Assessment form is required for all building additions, ❑ ❑ ❑ including decks,patio covers(over non-impervious surface)and accessory structures to existing residential dwellings on a lot of record approved prior to September 9,1995. I:\Building\Permits\BUP-RESPennitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) 1111 City of Tigard • 1 COMMUNITY DEVELOPMENT DEPARTMENT TIGARD Building Permit Review — Residential Building Permit #: gtv u i—-00-1,.,1-5 Site Address: t 1 21 1 1 S\ti/ C-1 re-tin b u nD rd • Project Name: Lot #: (New dwelling=subdivision name;Addition or Alteration=last name of owner) Planning Review Proposal: Demo o u o t-cA-h o n //// Verify site address/suite#exists and active in permit system. /Z River Terrace Neighborhood: ❑ Yes ❑--N Site Plan Elements: Three(3)copies of site plan 'BE isting structures on site ,Site plan must he on 8-1/2"x 11"or 11 x 17"paper .. Feotprint of new structure(including decks)with finished "lawnto scale(standard architect or engineer scale)lam►r l 0 floor elevations "lawn arrow /Utility locations(required for new,may apply for additions) Site address,project or subdivision name and lot number `Elbecation of wells/septic systems (,pplicant information(name and phone number) $Erosion control(including drainage-way protection,silt fence / tot dimensions and building setback dimensions design,location of catch basin,etc.) IFLot area,building coverage area,percentage of coverage and $Street names impervious area(applicable if R-7,R-12,R-25&R-40) -Street tree size,type and location --B�operty corner elevations(2 foot contour lines if more than `$Existing trees to be retained with drip line,and tree 4 foot differential) protection measures .-Q-€lean Water Services—Service Provider Letter(lot platted prior to 9/10/1995): Required: ❑ Yes,applicant was notified ❑ No Received: ❑ Yes ❑ No — —Public Facilities Improvement(PFI)Permit: Required: ❑ Yes,applicant was notified ❑ No Applied For: ❑ Yes ❑ No,stop intake Land Use Case#: lv \ LP c2l y - 000.3 X Zoning. (z - 12 7Setbacks: Front Rear LO Side t D Street Side 7x3 Garage ZO Landscape Requirement: 7r Lot Coverage Maximum: 7R---..) % S / n Building Height: Maximum Height S S Actual Heighr fT "B rVisual Clearance _❑_Easements sensitive Lands: ❑ Yes ❑ No Type --E1—Urban Forestry Plan n _Conditions "Met"prior to issuance of building permit Notes: Approved By Planning: Ail 0 yl jZw 6 ij Q Date: /I / I z / ii Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved I:\Building\Forms\BldgPermit Rvw_RES_070915.docx Building Permit Submittal Original Submittal Date: iihr-ii> Site Plans: # a Building Plans: 2.. Building Permit#: nter building permit ove. Workflow Routing: al<nning L Engineering –t Fit Coordinator ❑ Building Workflow Sign-off: Si f for Planning(include notes from planning review) Route Application Documents: ngineering: (1) copy of permit application, (1) site plan, (1) building plan and /. original plan review routing form. Air Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: feke1r�{a r,,n) de ryi+,? ON I y. By Permit Technician: �� Date: /l//7/i 5--- Engineering Review Slope at building pad: 0 M /7:'rior to issuance of buildin g permit ❑ Easements (encroachments)per engineering conditions of approval and plat ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes ❑ No ❑ NOT Approved by Engineering: Date: Notes: Approved by Engineering: /1-40 Date: (L_/ ���J Revisions (after Building Submittal only) Reviewer bate Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A Tigard Trans SDC: ❑ Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A to Issue Permit Approved by Permit Coordinator: Date: /l / 9 /, I:\Bui I ding\Fonns\BIdgPermitRvw_RES_070915.docx