Loading...
2015-094430 ~ King Court ~ Graceland Subdivision - Flow Through Planter Lot 2 Washington County,Oregon 2015-094430 D-AE Stn=29 S PFEIFER 11/12/2015 08:54:01 AM $55.00$11.00$5.00$20.00 $91.00 I,Richard Hobernicht,Director of Assessment and Taxation and Ex- Officio County Clerk for Washington County.Oregon do hereby certify that the within instrument of writing was received and recorded in the book of records of said county. Richard Hobernicht, Director of Assessment and Taxation,Ex-Officio RETURN RECORDED DOCUMENT TO: CITY HALL RECORDS DEPARTMENT RECEIVED CITY OF TIGARD 13125 SW Hall Blvd. OCT 13 2015 Tigard,OR 97223 CITY OF TIGARD PLANNING/ENGINEERING Space above reserved for Washington County Recording information PRIVATE STORMWATER FACILITIES AGREEMENT This Agreement is made and entered into this I . day of(9C1-0-X , 2015, by and between the CITY OF TIGARD, a municipal corporation of the State of Oregon (City) and Pacific Evergreen Homes, LLC (Owner). RECITALS A. Owner has developed or will develop the Facilities listed below. (List the type of private stormwater facilities on site and the quantity of each type). tr, Facility type (list each) Flow Through Planter Quantity I @ 160 SF B. The Facilities enable development of property while mitigating the impacts of additional surface 0 water and pollutants associated with stormwater runoff prior to discharge from the property to the public stormwater system. The consideration for this Agreement is connection to the public stormwater system. C. The property benefited by the Facilities and subject to the obligation of this Agreement is U described below or in Exhibit A(Property) attached hereto and incorporated by reference. Lot 2, Graceland Subdivision, City of Tigard, Washington County, State of Oregon 2 See Attached Exhibit A cC D. The Facilities are designed by a registered professional engineer to accommodate the anticipated volume of runoff and to detain and treat runoff in accordance with Clean Water Service City's Design and Construction Standards. E. Failure to inspect and maintain the Facilities can result in an unacceptable impact to the public stormwater system. NOW,THEREFORE, it is agreed by and between the parties as follows: 1. OWNER RESPONSIBILITIES Owner shall operate and maintain each Facility in accordance with an Operations and Maintenance Plan(O&M Plan) submitted by Owner and reviewed and approved by City during the development process (Exhibit B). The O&M Plan for the water quality manhole shall be in accordance with the manufacturer's recommendations for O&M. At a minimum,the following procedures that use common equipment and existing maintenance protocols are required: Page 1 –Private Stormwater Facilities Agreement 5001436792 29/2015 a. Inspection: At least once a year,before the winter season. After major storm events,filters shall be inspected for damage. Inspect the manhole interior to determine the need for maintenance. b. Maintenance: Frequency may be adjusted in response to monitoring information from regular inspections. c. Cartridge replacement: Replace cartridges as needed per the maintenance checklist,or every 3 years if no checklist problems exist. All cartridges shall be replaced after a chemical or fuel spill, regardless of their age. d. Sediment removal: Accumulated sediment found in stormwater treatment and conveyance systems shall be handled and disposed of in accordance with regulatory protocols. Owner agrees to operate, inspect and maintain each Facility in accordance with the O&M Plan. Owner shall maintain a log of inspection activities. The log shall be available to City upon request or during City inspections. 2. DEFICIENCIES. All aspects in which the Facilities fail to satisfy the O&M Plan shall be noted as "Deficiencies". 3. OWNER CORRECTIONS. All Deficiencies shall be corrected at Owner's expense within thirty (30)days after completion of the inspection. If more than 30 days is reasonably needed to correct a Deficiency, Owner shall have a reasonable period to correct the Deficiency so long as the correction is commenced within the 30-day period and is diligently prosecuted to completion. 4. CITY INSPECTIONS. Owner grants City the right to inspect the Facilities. City will endeavor to give ten(10)days prior written notice to Owner,except that no notice shall be required in case of an emergency. City shall determine whether Deficiencies need to be corrected. Owner(at the address provided at the end of this Agreement,or such other address as Owner may designate in writing to City)will be notified in writing through the US Mail of the Deficiencies and shall make corrections within 30 days of the date of the notice. 5. CITY CORRECTIONS. If correction of all Owner or City identified Deficiencies is not completed within thirty(30)days after Owner's inspection or City notice, City shall have the right to have any Deficiencies corrected. City(i)shall have access to the Facilities for the purpose of correcting such Deficiencies and(ii) shall bill Owner for all costs reasonably incurred by City for work performed to correct the Deficiencies (City Correction Costs)following Owner's failure to correct any Deficiencies in the Facilities. Owner shall pay City the City Correction Costs within thirty(30)days of the date of the invoice. Owner understands that this is a debt owing to City. In addition,Owner agrees that upon non-payment, City Correction Costs shall be secured by a lien on the Property for the City Correction Cost amount plus interest and penalties. 6. EMERGENCY MEASURES. If at any time City reasonably determines that the Facilities create any imminent threat to public health, safety or welfare, City may immediately and without prior notice to Owner take measures reasonably designed to remedy the threat. City shall provide notice of the threat and the measures taken to Owner as soon as reasonably practicable, and charge Owner for the cost of these corrective measures as provided in Paragraph 5. 7. FORCE AND EFFECT. This Agreement shall constitute an equitable servitude or covenant running with the land and shall bind all owners of the Property present and future, and their heirs, successors and assigns. 8. AMENDMENTS. The terms of this Agreement may be amended only by mutual agreement of the parties. Any amendments shall be in writing,shall refer specifically to this Agreement, and shall be valid only when executed by the owners of the Property, City and recorded in the Official Records of the county where the Property is located. Page 2—Private Stormwater Facilities Agreement 50014-36792 2/97015 9. PREVAILING PARTY. In any action brought by either party to enforce the terms of this Agreement, the prevailing party shall be entitled to recover all costs, including reasonable attorney's fees as may be determined by the court having jurisdiction, including any appeal. 10. SEVERABILITY. The invalidity of any section, clause, sentence, or provision of this Agreement shall not affect the validity of any other part of this Agreement, which can be given effect without such invalid part or parts. IN WITNESS WHEREOF, Owner and City have signed this Agreement. NOTARIZE DOCUMENT BELOW CITY OF TIGARD CORPORATE, LLC PARTNERSHIP, TRUST OR OTHER LEGAL ENTITY SIGN BELOW By: L9Y 'd Pacific Evergreen Homes, LLC City Manager or Designee (Entity re B ,1 Qf y: (Sign here for entity) Title: Chief Operating Officer STATE OF OREGON ) ) ss. County of &Ski 4{'' ) This instrument was acknowledged before me on 0 C...\-00. ,r k -1 , 2015, by L IO f∎ Ta ho as (e pYf se4.4Et'hw of City of Tigard. �I"" OFFICIAL STAMP BETSY GALICIA �1 e ^ NOTARY PUBLIC-OREGON + �' � COMMISSION NO.925741 � .We.� MY COMMISSION EXPIRES MARCH 09,2018 NOTARY PUBLI 6 FOR III R1GON My Commission Expires: q ` 110 STATE OF OREGON ) ) ss. County of r_kut krmmuS ) This instrument was acknowledged before me on E- 6 g � w� (� ���- r �2015, by Harlan S. Borow as Chief Operating Officer of Pacific Evergreen Homes, LLC YIt� OFFICIAL SEAL v r:: ' "> JAMIE LEE WYLAND �� "���� y NOTARY PUBLIC-OREGON ∎'4; 0 COMMISSION N0.478189 Y PUBLIC FOR ORE 90111 MY COMMISSION EXPIRES MAY 08,2017 y Commission Expires: 43—M)I l i Page 3 –Private Stormwater Facilities Agreement 50014-36792 2/9/2015 EXHIBIT A go 'L� �--1 Ii 1 1 1 I 'F RIB I$ r �2 ii I;I . ICI 1 € a w j " j 1- , � I 41 11 XI pp �, 1 1 ^� I Y + 1 y� 1M 1 R pit---"---�--� \ I ,._\_____ , a 1 \ . Li —— I -- '- 4 'SL / 7 S{I N '14 ; M 1 a , 1 1 1 1 1--` a x® ; 1 II 3 1 K 1 L 1 ASSN 1 % igi N I 1 1 ICI 4 la ° p1 14 inn I I �..P, M! AI qI a w N@ i \ fl 1 gigg J W 1 1 __ - ___LJ __________ gli oh. hi _______,_- ip _L_—------— LOW—- y r rC i 1e N 6? PPLT uLSNCrNED R 9V w1E GRACELAND rat. PACIFIC EVERGREEN HOMES 3 eh Mir DRAwN 2 6-LOT SUBDIVISION 7410SWOLESON ROAD.t133 ■ENGINEERS _ &SN 3 PORTLAND.OREGON 97223 REVIEWED a NO232 903-836-8972 1��� _ (:MT 5 911E TAM kW 29102BC ■ `Rmn nNl SU6MNTTK 6 TM LOT 1102 of 13 PREUMINARY PLAT OTVOF TIGARD.ONEGON ."'..,:"`n.° Nam. PI.t.t Sr 21 20'5-*5l,r, P.\MOQ)\NN\[' .\I...o.af}I ®�Ywk �Rl�m.� • • EXHIBIT B OPERATION AND MAINTENANCE PLAN Lot 2,Graceland Subdivision, Tigard, Oregon Private Stormwater Treatment Systems October, 2015 Prepared By: Gregory M.Thiel, P.E. NW Engineers LLC Hillsboro, OR 97124 503-601-4401 gregt@nw-eng.com Property Owner: Pacific Evergreen Homes/Future Homeowner Legal Description: Lot 2, Graceland Subdivision, City of Tigard, Washington County, State of Oregon Site 0& M Responsible Party The flow through planter on Lot 2 is to be maintained by the property owner. This can be easily maintained based on the information contained in this plan. Onsite Stormwater System Description The runoff from the roofs and driveways will drain by gravity to the flow through planter located on the lot as shown on the attached exhibit. The stormwater will be treated in the growing media at the surface of the planter as it soaks through it. The stormwater then will be discharged to the storm sewer system through the storm sewer lateral serving the lot. Any overflow from the planter would flow over the planter wall and onto the surrounding lawn areas. This is not expected to occur except possibly in extreme rainfall events and even then is not to be a concern on this local street. FACILITIES DESCRIPTION TABLE Facility Name Type Size Area IA Managed Facility Discharge Point (sf) Managed (sf) Base Flow Through Planter 160 Roof and 2640 None Storm sewer Planter driveway INSPECTION/MAINTENANCE SCHEDULE The property owner must inspect and maintain each part of the system annually as detailed in the attached checklists. The property owner must keep work orders, invoices and receipts on file to provide upon City request, documentation of compliance with this site-specific O&M Plan. Best Management Practices (BMPs) prevent pollutants from mixing with stormwater.Typical nonstructural control measures include raking and removing leaves, and limited and controlled application of pesticides, herbicides, and fertilizers. O&M Plan Page 1 .Spill prevention measures shall be exercised when handling substances that can contaminate • stormwater. Virtually all sites, including residential and commercial, present dangers from spills. It is important to exercise caution when handling substances that can contaminate stormwater. Activities that pose the chance of hazardous material spills shall not take place near collection facilities. • The proper authority and the property owner shall be contacted immediately if a spill is observed. • A spill kit shall be kept near spill-prone operations and refreshed annually. • Releases of pollutants shall be corrected within 12 hours. Insects and Rodents shall not be harbored in any part of the storm system. • Pest control measures shall be taken when insects/rodents are found to be present. Standing water and food sources shall be prevented. • If sprays are considered, a mosquito larvicide such as Bacillus thurendensis or Altoside formulations can be applied only if absolutely necessary and shall not be used where it will enter groundwater or come into contact with any standing water. Sprays shall be applied only by licensed individuals or contractors. • Holes in the ground located in and around the storm system shall be filled. • Outfalls draining into vegetated swales shall be inspected and cleaned regularly to ensure no rodent activity, which can clog or decrease the efficiency of the storm system. Access shall be maintained for all facilities so O&M can be performed as regularly scheduled. SAMPLE ONSITE STORMWATER SYSTEM INSPECTION AND MAINTENANCE LOG Inspection Log—Record the date and the personnel who conducted the site inspection. Record the infiltration rate if greater than 48 hours, a description of any and all spills and vector issues, sediment&oil depth, the percentage of vegetation coverage (desirable and undesirable), and the condition of the system components every quarter for the first 2 years of operation and twice a year after a major storm event thereafter. Infiltration/Flow Control-All facilities shall drain within 48 hours. Time/date, weather, and site conditions when ponding occurs shall be recorded. Pollution Prevention -All sites shall implement BMPs to prevent hazardous wastes, litter, or excessive oil and sediment from contaminating stormwater. Contact City for assistance with responding to spills. Record time/date,weather, and site conditions if site activities are found to contaminate stormwater. Vectors(mosquitoes and rodents) -Stormwater facilities shall not harbor mosquito larvae or rats that pose a threat to public health or that undermine the facility structure. Monitor standing water for small wiggling sticks perpendicular to the water's surface. Note holes/burrows in and around facilities. Record time/date, weather, and site conditions when vector activity is observed. Depth of Sediment&Oil—Take and record measurement at catch basins, conveyance systems, inlets, outlets and within the facility itself. Percent Vegetation Coverage—Record percent cover of desirable, dead, and invasive vegetation. Condition of Structural Components—Record type and size of missing or broken components (i.e., width of cracks and/or extent of settling). Maintenance: Record date, description, and contractor(if applicable)for all structural repairs, landscape maintenance, and facility cleanout activities. O&M Plan Page 2 'SAMPLE MAINTENANCE LOG • Date: 10/1/07 Initial: BJK Work performed by: AAA Landscaper under 3 year contract. Work performed by: Replanted rain garden with sedges and rushes. Work Area or specific stormwater facility: Details: *Work order on file and available upon request. 3.4 O&M ENFORCEMENT The City has the right to ensure site compliance with the recorded O&M Form and Plan filed with City of Tigard. The Enforcement section of City Code authorizes the City the right of entry to the property for inspections of the facility,the ability to issue a code violation, and the ability to take enforcement actions and levy civil penalties. In general, City inspectors will strive to work with site owners and operators to ensure proper facility O&M. If technical assistance still does not yield tangible O&M improvements, however, the City may take enforcement action. City staff inspects sites to verify that the property owner is properly operating and maintaining stormwater management facilities. Upon completion of an inspection,the inspector provides a report addressed to the property owner and/or site contact that outlines any required corrective action,deadline to correct and City notification (if needed). 3.5 O&M REVISIONS Stormwater system or individual stormwater management facility modifications subject to City review and approval include changes to the point of discharge, source of runoff, structural or vegetated components. Property owners and operators must consult with the City to determine if a permit and/or new O&M Plan is required prior to making onsite stormwater system or stormwater management facility modifications. The City may require property owners to record a new O&M Form if the O&M Form on file with the City is inaccurate or otherwise insufficient. Insufficiencies include but are not limited to not fully describing the onsite stormwater system and not clearly identifying all responsible parties for O&M. The property owner must submit a draft O&M Plan to the City and receive approval prior to recording it with the County. A final recorded O&M Plan must be filed with the City. Additionally, when applicable, updates to O&M Plans must meet City approval and approved plans must be filed with the City. The City may require property owners to record updated O&M Plans, site maps, or facility details with the County and submit a recorded copy to the City. O&M Plan Page 3 c cc w w Z ! Wa. i a STORM DRAIN LATERAL INFORMATION [ IRi n O Ili •• E1 I MINN MINIM pM + • rMOM, ION 'IOR' < Li i .. .ro A fit" • IN iNF[ i a�a r b g§ )a ff I ...' r P-f I •,'- o[Aa - 1lux[ yawn L- W^N "I�dMn7'YIm t _--s w- I [IN Ia i R[na MAN €a 4§,t ►v may=, �" ll �� 1.581 �R g �MOE..xA. /[E two I I-]I I 16O IM INN IS • •CIIN '�'LwRRMwR.YE✓u. ayen. ILLS 01011[q Y •• ICOR[YRa • ' • 1 0°"i MAWRDDI 'M� II MINNIIN NOTES.1e car I[[ Z I [r[[ CC 0 LOIY_2-_ ' rI 'Wp TNRI RIUP"}txuh Nw 110 Ip Z BOX SIZE(SF.)May 'a DMA ADrm M¢IARa M -- 1 OF DUNTS '2 x fA S r7PE OF PLANTS-- i w4Ma Piet rw'naRwrr. I I a O O 0 SERB x NOM MAO AMI AVM IN In 1 Z m 51�j ppFF Pt __ Mp Nom p w MEM R N ONE LOP II aJ 0 =Z WNW AAA•RP la Uri Fi a � �O11 N O 2 . ® O.a .10 O.A MD I 0 W Z u_1 PLANTER CROSS SECTION c-3: MI I 1 NORIZOITAL SCME:t..10 NAVAL SCNE: I..Y I • I 1 I I I • t 1 CLOG PRmECrOM L J W CONI NCIOR TO 1AMIGTE AN W DNMETER CLOD ppp onarELmo.1 SCREEN OLIN LGMLDE YS DALYANABD ei =TL N' NON AROUND EACH STAND MRE,MEW TO WEN N - I, tIy • E. OMIe WORN OF I cu.THE PLANTER GRAM AND AT LENT x'NOME THE OVERFLOW. E 1•• •. • / �`,:... WIC MMOARMNEIEVATIOM - 1.1. % • .iitiZ % / ATi =i.-i.� Ru[[LO FLOOR NNW cacao»carol .Meow /v.' , v /\/. ,. ` ..r.m i m m•\\\/ /<// r PRIVATE INFILTRATION PLANTER - PLAN l i ii I u m I. \ (// •• /// NORIZOHTAL SCALE.1'-ID' 3i 11=erorr tlill0l DIME \ \\� `�\\/\� / L "•. I.�. DoAweIIT M AF111o'D n� �\/y INSIDE PLANTER DIMENSIONS "°°"' N al =ovum eE toe NA.SUEON'\.\ ,\\.\�/�'i>\' AWL P•a CpeteML MIX AS MMe'L et e[BMW �Y TRENCH DRAIN DFTAII, g NOT N SOU P.m MM. 1 K°N CV i 1 SEA[.I b n 0 0 I • Infiltration Planter—Rain Garden Checklist Annual inspections are required.This checklist describes inspection activities, and notes additional recommended inspections. Contact the design engineer, Clean Water Services or City representative for more information. • Recommended. in addition to required System Preferred Conditions and annual inspection Feature Problem Conditions to Check for Maintenance Practices Mbrltlry General Invasive Vegetation No invasive vegetation is planted or permitted to No invasive vegetation;Remove excessive weeds.Attempt to as outlined in Ch.4 remain,inducing but not limited to:Himalayan control even If complete eradication is not feasible.Refer to Annually Required DSC Standards Bladdieny;Reed Canary Grass;Teasel;English hy, Clean Water Services Intagated pest management guidance Nightshade;Clematis;Cattail;Thistle;Scotch Broom documents. Monthly bum November General Vegetation Vegetation blocking more than 10%of the inlet ppe No vegetation blocking inlet pipe opening through Apdf oPenmg Annually Required Monthy end alter any major General Trash and Debris Visual evidence of tash,debris or dumping Trash and debris removed tan facility storm(1-inch In 24 hours) Annually Required Monthy Sum November General Contaminants and Evidence of oil,gasoline,conteminanfe or other poi- No contaminants or pollutants present;coordinate removal, through Aprll and after any Polution Mints cleanup with local jurisdiction major storm(use 14nch in 24 horns as a guideline) Annually Required Monthy from November General Erosion Eroded damage more than 2 inches deep if cause Area stabilized using appropriate erosion contol measures through April and alter any of damage is still present or there is potential for major storm(1-inch fe 24 continued erosion hours) Annually Required Monthy and alter any major General Obstructed Inlet! Inlettutiet areas dogged with sediment,vegetation Unobstructed I letloutlet material and blockages removed storm(14nch in 24 hours) Outlet or debris Annually Required July 2009 Low Impact Development Approc ;Handbook Infiltration Planter—Rain Garden Checklist (continued) Annual inspections are required.This checklist describes inspection activities,and notes additional recommended inspections.Contact the design engineer, Clean Water Services or City representative for more information. Recommended. in addition to required System Preferred Conditions and annual inspection Feature Problem Conditions to Check for Maintenance Practices Month y General Rodents Evidence of rodents or water piping through facility via No rodents;facility repaired. Refer to Clean 1Nater Services rodent holes integrated pest management guidance dope Annually Required Annually Required General Insects Insects such as was and hornets interfere with Harmful insects removed maintenance activities Monthly from November Storage Area Sediment or Water ponding after rainfall ceases and initatlon No standing water 24 hours after major storm(1-inch In 24 thigh April standing water time has passed,or testing indicates fealty is waking hours);sediment is removed and facility wades according to at 90%a less of design capability:sediment depth design Annually Required exceeds 2 inches Monthly from November Rode Filters Sediment and By visual inspection,little or no water flows tlxough Gravel in rock filter is replaced through April and alIer any Debris flier cluing heavy rain storms major storm(1-inch in 24 hours) Annually Required Monthk during growing General vegetation Specified or approved grass grows so tall that it can- pates wllh shrubs or becomes e Ire Sting�grass b 4'b 6"and remove clippings;take cure danger. not to girds the bark of bees and shrubs.(Note:except emergent wetland grasses in the treatment area of low meinte- Annually Required nance facilities) rleanvlfaeer Ser ea July 2009 Low Impact Development Approaches Handbook