Loading...
PFI2015-00166 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PFI2015-00166 o 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 11/09/2015 Parcel: SEG1739 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: Adjacent to 9230 SW View Terrace. Replace a phase primary underground cable-bore 1275 feet. Owner: FEES Description Date Amount PFI Permit Fee 11/09/2015 $300.00 PHONE: Contractor: PHONE: FAX: Applicant: TSAHAI ANDERSON 10800 SW AVERY ST TUALATIN, OR 97062 PHONE: 503-612-6106 Total $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Not Present Signature: Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12015-00166 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA,current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices,flag persons,etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice I A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector Kenny Fisher at 503-816-6146 or email at kenny@tigard-or.gov twenty-four (24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance,and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI Utilities 21 -OTHER Applied Notice E�;VE City of Tigard NOV 0 4 2015 PCE WORK ORDER# M1431991 PUBLIC WORKS — rd1 �L1 `If s Public F �' ' E n� ovement (PFI) Permit DESCRIPTION OF WORK(in the right-of-way) REQUIRED SUBMITTAL Check one: W Utilities ❑ Sidewalk/driveway approach ❑ Street improvements ELEMENTS Replace A Phase Prima Underground ® 1\linor work in right-of-way Detailed description: p Primary g Cable - Bore 1275 FT (sidewalk repair,curb cut,street opening,etc.)requires: •.Application form,completed and signed • Submit one(1)copy of scaled sketch Pro erty address/location(s): 9230 SW View Terrace, Tigard OR of the proposed work to be done •Submit one (1)copy of traffic control plan -OR- Applicant's Anderson ❑ Substantial project work requires f\pplicanl's name: above items and professional Address: 10800 SW Avery Street engineered plans for: Tualatin, OR 97062 •Street widening Cit)/state: Zip: •Subdivision infrastructure Phone: 503-612-6106 Email: T&DSupportAvery@pgn.com • t\lain utility line extension: Storm Drain,Sanitary—Tigard - Water—Tigard Water Service Contractor's dame: TBD Area(includes Durham,King City CCB#: Expiration: and a portion of unincorporated Washington County) Address: Cite/state: Zip: DELIVER APPLICATION TO: City of Tigard Phone: Email: Planning/Engineering 13125 SW Hall Blvd. Engineer's name: Tom Cox Tigard,OR 97223 3700 SE 17th Ave Applications for"minor work in tight-of-way" Address: only may be emailed to: City/state: Portland, Or Zip. 97202 rowpermits(a�.tigafd-oror.gov Phone: 503-867-0414 E,mad: Tom.Cox@pgn.com TOR STAFF USE ON_Y Case No.: A Iae��s' coxa Estimated value of work (within the public right-of-way): $ o� Application submittal feet 3 00 Is work related to a LAND-USE DECISION? ❑ Yes ❑® No Application accepted: If so, please specify (MLP, SDR, SUB, etc.) case #: By: I -s Date: it/-qh Is work related to a BUILDING PERMIT? ❑ Yes ® No Application reviewed: If so,please specify(BUILDING P13IZA4I1) case#: By: Date: i f- 5 - Applican/t notified: J) Bv: 6—.J Date: I:\CURPLN\Masters\Land Use Applications Rev.07/16/2014 City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • ww-wtigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as `Applicant" shall be designated "Permittee"and shall provide financial assurance for work. *Whcn the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. BY SIGNING BELOW, THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate anv deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted, the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in the plot plan,attachments,and exhibits transmitted herewith, are true;and the applicants so aclmowledge that any permit issued,based on tlis application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria, and understands the requirements for approving or denying the application. SIGNATURES of each owner of the subject property required. Digitally signed by TSAHAI ANDERSON //�� /^� Anderson TSAHAI ANDERSON',_,1=TSAHAI.ANDERSON@PGNCOM,-US TSahai 11/4/15 Dale 2015-1100125004-06'00' Applicant/Authorized Agent's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT Cityof Tigard • 13125 SW HallBlvd. • Tigard,Oregon 97223 • xv\v\vfigard-or.gov 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES 1. Public Facility Improvement(PFI) Permit: Part 1: Required submittal fee$300.00 Part 2: All non-water system iunprovements Engineer's estimate X 5% (less $300.00 submittal fee) Engineer's estimate X 2%Plan Review Part 3: All public water system improvements Engineer's estimate X 12% Total Permit Fee = Part 2 + Part 3 PFI Permit Fee Exemptions: There will be no permit fee charged,or assurance required for the following types of work: • Sidewalk or driveway repair(less than 20 lineal feet) • Relocate or replace mailbox • Ditch cleaning that does not involve regrading. • Weephole repair • Curb repair or replacement(less than 20 lineal feet) • Lawn sprinkler system installation or repair • Street tree pruning or planting • Planter strip landscape maintenance • Test wells PUBLIC FACILITY IMPROVEMENT PERMIT Cityof Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov 503-718-2421 Page 3 of 4 SAMPLE SKETCH: Sl y St Edge of Pavement I ",- Ditch _Op Streetlight I ------ —C--- f• e Rain Drain, I � r FSt Trey , 1 d"5eluverTiiie Existing " I Existing House I �i Driveway a� I vi I 1 CI h I e zo• ii lITT 0 a al I I o� � 1 I � Existing Shop I Powerpole 0 I 95, _ � property Line II Fire Hydrant(FH) � � I Scale: � � I � � I � I I � � I MINIMUM SKETCH REQUIREMENTS (Put"N/A" if Not Applicable): North arrow Property lines &dimension Slope of property Street& street name(s) Existing building, structures Utility & street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/W apron (sewer,water, storm) PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard - 13125 SW Hall BIN,& - Tigard,Oregon 97223 - wulx�tigard-or.gov - 503-718-2421 - Page 4 of 4 8445 . I 11�-____� t.—_I ..- ., . f ,f — , 9230"d S LEGEND 1g42s IA 2582147 93as 1 °` �•_. �idzaa/ h.,aRLo-m;. �.�., - sw McIMNnLD sr ^, 19455 „ ..• A_U...NK\�- a I ; i JOB SITE C r y N 0 REMOVEFACIL17IE5 MSTALLFACLUDES 29 __ __ _____ ?AL EpRNsrD,Y.?A, I ,Ilmf- �fP _ INSTALL ADDITIONAL FACIL/IIESIMODIFT FACILInEa 30'-u IsKsNn A-2 AL '�3 z 4wRmH:Lx,veww ❑ L XLP 9235---- F CONDUCTORS ROW sK'4E I4 SW MOUNTAIN V 50' O(/ 9265 INSTALL _10G yX i By t • •. I, � I I-`^ 6 .w ------- PROVIDED BY 6l STALLED BY POE OPROVED CONTIEACMR Tq cif, I ro w ) Y 1 I \ ,I• ., ,`'UNk + � �� y RFMOVB j...P?�PD5364!WL 9: I \I - - - - - ` % ,...,..., EQUIPMENT Install I ('-'---I 2p n SWINEZ ST 'ELBOW KIT-JKTD CABLE-#2AL 9360 I 1 \ Tti I r 527°nA 14265 76 0 rwtxoK:AroR 9420 j/9340 'VT-677` 11285 9450' t1t —1 1 L----�,.J ! < �' i 16''^ ©i,? SOURCE - •�� 1 f WL8: 7 _ Install: \ 1 I 6775-WL 7: NEED PRE-LANDSCAPE °t ^ -' I (345 FT)CONTRACT BORING Install: I '(345)1-PHASE OF 42 AWG,AL,EPR,15 KV,(2500 FEET) `ROW '(2)ELBOW KIT-JKTD CABLE-#2AL w... - Abandon: 50' •(2)INDICATOR SMALL FAULT VAR TRIP 200 A MINIMUM TIME RESET I ' '(345)1-PHASE OF JKT IX2 AL �' X9280 ( I ( I VICINITY MAP I ( I ` 9260 LDz4D ' J ' L-'-J 9190 11365 _L 35 '9395� I NK 9365 WInaLl'a(831 0 FTICONTRACT BORING J I f I_-_- _R •(310)1-PHASE OF#2 AWG.AL.EPR,15 ._ KV,(2500 FEET) - J i - {vl _.. Abandon' L— L-I, N I - (310)1-PMASEOF JKT#2AL 204 +IVT6772•WLS: -- - - L— - - Install: X9135 ILZ,W °I' ] Wa X °I'a '(2)ELBOW KIT-JKTD CABLE-#2AL Ato CU OX `-.-._____' Qa 9] 'INDICATOR SMALL FAULT VAR TRIP 200 A MINIMUM TIME RESET 0_ Jo�aT'_ 14370 I 19261 I I I 9235 1 I CONSTRUCTION NOTES: CMDEV J-r 41733 9205 1. CUSTOMER IS RESPONSIBLE FOR ALL TRENCH.CONDUIT.VAULTS.PADS _ r B'UN`L AND ROAD CROSSINGS. WR CHECKLIST A 50 14491 U '6972 "-^" I I I 1Ki I REM YES COMMENT 9460 • E _ 20•4 X99 1_ J + 2. ALL CONDUITTO BE INSTALLED WITH 30 INCHES IMINI COVER AT TOP OF CONDUIT FROM FINAL GRADE. T I _1E,e °w°TRerts, s ° �-- I_- HOLEDIGG R 1441s�• A 1 3. ALL PGE CONDUCTORS TO BE INSTALLED IN GRAY.SCHEDULE 40,ELECTRICAL BOOM y ' _-,� GRADE,PVC CONDUIT WITH NYLON PULL STRINGS(MIN.SIX)LBS.TEST). I -� BACKH E { 14010 ` `� -A 0 11719 6970 PGE TO DETERMINE THE SIZE AND NUMBER OF CONDUITS REQUIRED -6970 l MAINTAIN 12 VERTICAL INCHES AND 24 HORIZONTAL INCHES CLEARANCE BETWEEN PGE TRENCH 5 i GAS AND OTHER UTILITIES,ALL ELBOWS 4INCH&SMALLER TO BE 36 INCH RADIUS. 6971 iI ! r' '-� I •\ ` 2013 ALL BENDS MUST BE FACTORY MADE.ALL ELBOWS LARGER THAN 4 INCH TO BE ORE X 1275 FT L 20'-4 14116 7 10 CU DX— 60 INCH RADIUS,RIGID STEEL OR PGE APPROVED.FIBERGLASS BENDS ARE REQUIRED X 1 _ }1 ` _ FOR RUNS OF 151 FEET OR LONGER,OR FOR ANY LENGTH RUN WITH MORETHAN LOCATES 1974 , _k I I 0 I I j �' ` _ --- _._. 150 FEET DES IN BENDS.PVC SCHEDULE 40 BENDS ARE ACCEPTABLE FOR RUNS OF STAKING 1 I I 150 FEET OR LESS,THE MAXIMUM TOTAL BENDS IN ANY CONDUIT RUN IS 270 DEGREES. FLAGGING % r M _ / i d OR SCHEDULE LBORING WITHREQUA MECHANICAL AL CK NECTIOGHERTS-LYPORLIKE MECHANICAL TREETRIM �] r~�\ K •'-` -+ N I 1 d1 99 r- I - 02 0 0230 I OR SCHEDULE 40 D C T)AS A ALTER ITIVE T NNECTIOUCT.HOPE SH LL MME MECHANICAL 1d425 1 � ,� 1p7d , r'- CONNECTION PRODUCT)AS AN ALTERNITIVE TO HDPE DUCT HDPE SHALL MEET THE LANDSCAPE X POST _ WL 1: REQUIREMENTS OF PGE SPECIFICATION LC20515(AVgILABLE ON REQUEST FROM PGE PROJECT VT6321-WL1. `t I20 �� v2IZIIQ I•UNK� Install: 9200 EXTRUDED RED STRIPES IS A SPECIFICATION REQUIREMENT).MANDREL TEST OF EASEMENT Install: / �*• W D C ' '(250 FT)CONTRACT BORING I HDPE PIPE IS REQUIRED AFTER INSTALLATION WITH PGE INSPECTOR PRESENT. PERMITS X TIGARD 'ELBOW KIT-JKTD CABLE-#2AL ` I 144$5 y y I ; I '(250)1•PHASE OF#2 AWG.AL,EPR,15 KV,(2500 FEET) '- - 5,ALL PGE TRANSFORMERS TO BE INSTALLED 8 FEET MIN FROM ANY COMBUSTIBLE TRAFFIC P X L 1.M3,a 2 2 Abandon: (MIN)W W d I BUILDING,WALL OR OVERHANG AND d FEET(MIN)FROM ANY FIRE HYDRANT WL 2: Hti W J '(250)1•PHASE OF JKT q2 AL PGE TRANSFORMERS MUSt BE WITHIN IS FEETOFADRNEABLE AREA. CUTSHEET Install: .�1 I N ( 14430I I ALWAYS MAINTAIN 10 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS. UG CIE.VER '(370)CONTRACT BORING _ _ 6.TRAL FORMER GRAD.CODS ARE TO BE INSTALLED THAT THE TOP DILATEII IN DETAIL slumoIS6KIN '(370)1-PHASE OF#2 AWG,AL,EPR,15 KV,(2500 FEET) - i—•--- Q , VT632p-WL 3: �" - FINAL GRADE.CONDUIT 16 TO BE INSTALLED IN PAD AS INDICATED IN DETAIL SHUTDOWN Abandon: ' Install: ANDTO EXTEND 11NCH ABOVE THE PAA. '(2)ELBOW KIT•JKTD CABLE-g2Al CUSTOMER 443 I '(370)1-PHASE OF JKT#2AL I QJ 'INDICATOR SMALL FAULT VAR TRIP 200AMINIMUM TIME RESET I 7 STEEL BARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED SHUTDOWN X X TO VEHICLES. 8425 i'-� 9385 r—9355'- ¢ O I I J I I I 6. CONUDITCH VAULTS TO BESET AT FINAL T GRACE OITH WER KNOC GRAVEL(TERM BASEAND DOOR 11435 N 9255 9226 (SEE DETAIL ON SKETCH)ENTER THE VAVLTENDLOWER KNOCKOUTS(TERM-A-DUCT6). CONTACT AR 655'!'IA 5 1 I I I fi559 Q 1629 `� I r - � 1 9205 (SEE DETAIL ON SKETCH) 20.4 I_ 6558' I I ' I COMPANY - ---J J _ 9 PGE TO BE NOTIFIED AND INSPECT ALL CONDUIT,VAULTAND PAD INSTALLATIONS, VT-6321 20'-Unul 1972 '6560 _J 6561 I BEFORE BACKFILL.ALL NEW VAULT&PAD LOCATIONS TO BE FIELD VERIFIED PH. C# 2012 . ➢ r3 20-U�n7z I 2 _J WITH PGE AND CUSTOMER REPRESENTATIVE. A IM _ _ __ 2 I O.Unknawn A:UNK ----------- _: --- •----�•.--F _ 2012 10. REFER TO PGE ELECTRICAL SERVICE REQUIREMENTS BOOK FOR FURTHER.DETIALS A 1�CO DX A-2 AL EPR JKT-D-370. A-2 AL XLP - - &SPECIFIC REQUIREMENTS.LINK TO NMN$PORTLANDGENERAL COMIREOBOOK TENSION:54 q SW INET ST 11. DESIGN IS BASED ON STANDARD UNDERGROUND EOUIPTMENT NON-STANDARD TENSION:57 IF R50W m wrzsl UNDERGROUND EOUIPTMENT MAYBE AN OPTION AT AN ADDITIONAL COST TO THE CUSTOMER 12. THEPOIMOFDEU ERY AND DIVISION OF OWNERSHIP BETWEEN THE CUSTOMER AND PGE WILL BEAT THE LINE SIDE OF THE NEW CUSTOMER PROVIDED SWITCH GEAR PGECON&TRUCTIONDRAW°NG 14650 1 ^9130 J Ii 9390 I I 93fi0 f �3]0� 9300 — 19280 ' 119250 I 'g220 i ! 16505 AS-BUILTVERIFICATION&NESC VIOLATIONS CORRECTED Foreman: Date. GRo..)Fwarnon' Dele' CONTACT NDCONCECOORDINATOR FOR BACK11ANDCO 1U. wSNSC tl. PRiOR DATE REWEAT ASBUILTBYDESIGNER TO BACKnLL PCE WILL NOi INSTALL WIPE ACCOUM aw0. NO UM ILTRENCHISIg(N°RACKIMED 10101/2015 1460 1070001 10000071628 M1431991 ATTENTION. CALL 811 BEFORE YOU DIG SERVICE COORDINATOR ­U: OREGON JAW REQUIRES YOU r0 FOLLOW RULES ADOPTED 503-323-6700 OR 503-0634348(SALEM) BY THE OREGON UTILITY NOTIFICATION CENTER. • RIGHT-OF-WAY PERMIT NOTICE: /\ REPLACE APHASE PRI UG CABLE-1275 FT OIR" DURHAM-SATTLER SIZE 17x22 INOSERULESARESETFORTHINOAR952-001-0010 0 THROUGH 952001-0090YOUMAYOBTAINEDPIES of _ A PERMITFROM THE LOCAL JURISDICTION IS REQUIRED BEFORE ANY THINK PG� - 9230 SW VIEW TERRACE.TIGARD.OR THE RUL ES BY CALLING THE OREGON UTILITY WORK IN THE RIGHT-OF-WAY MAY BE PERFORMED, ONLYPGEAPPROVED SAFETY I N NOTIFICATION CENTER ADM INISTRATIONSI(5o1-131-198]) CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHER SPECIAL \ REPIACEAPHASE PRI UG CABLE-12]1 FT SHEEt 70 REQUEST UTILITY LOCATES CALL THE OREGON ItowL'Ilthsm ADW AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER PGE'S PERMITFIRST WILSONVILLE <uN SECnoxs UTILITY NOTIFICATION CENTER,813 AT LEAST CeO heftxe ymft THE CONTRACTOR MUST NOTIFY THE LOCAL JURISDICTION 48 HOURS NYDEM77ONFROM THISDESIGNMUST LINE CENTER WASHINGTON C2111A 1 BUSINESS DAYS PRIOR TO EXCAVATION BEFORE WORK IS TO BEGIN.A COPY OF THE PERMIT MUST BE ON SITE. SEAPPROVEDL9YTHEPGEPROJECTMANAGER I 1011 aw BOECKMAN TOM CO% 867-0014 HUGO MEJIA