Loading...
Report : - ►Lf'- 3_-7. Bend Office (541)330-9155 Ccotechnical Office (503)601-8250 Carlson Testing, Inc. Eugene nf (541)345-02$9 Salem Office ce ee (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER October 28,2015 T1505011 City of Tigard 13125 SW Hall Blvd Tigard,OR 97223-8199 Attn: Building Division Re: Project Name: SEES CANDIES-SUITE H15-ROOF UNIT Address: 9540 SW WASHINGTON SQUARE RD-Tigard,OR Permit#: BUP2015-00237 Per Chapter 17, Section 1704.1.2 of the International Building Code(IBC),we have performed special inspection of the following item(s)per our inspection reports only: Structural Steel All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards,as well as the structural engineers design changes,approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist, It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CT! has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques,sequences or procedures of the construction or evaluating or reporting job conditions related to health,safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSO ' TESTING INC. Kurtis Parkin Project Manager KPinm cc: SEE'S CANDIES-RICHARD ESCALANTE 1 RESCALANTESSECS.COM CITY OF TIGARD BUILDING DIVISION-WALTER'CHIP'BARNETT WALTER4TIG.ARO-OR.GOV CARUSO TURLEY SCOTT INC-TROY TURLEY: MAIL SARGENTI ARCHITECTS-SIMONE SHORT SSHORToSARGARCH.CO'd WESTERN CONSTRUCTION SERVICES INC-CARTER SCHAFFRAN CARTERt=WESTERNCONSTRUCTION.COM MACERICH VALLEY RIVER CENTER LLC-KAREN MAYNARD KAREN.MAvanno44ACERICH.COM P:1Projects\General\20151T1 50 5 01 1 110-28-2015 Final Letter.doc Updated 11/30/11