FINAL SUMMARY LETTER
October 28,2015
T1505011
City of Tigard
13125 SW Hall Blvd
Tigard,OR 97223-8199
Attn: Building Division
Re: Project Name: SEES CANDIES-SUITE H15-ROOF UNIT
Address: 9540 SW WASHINGTON SQUARE RD-Tigard,OR
Permit#: BUP2015-00237
Per Chapter 17, Section 1704.1.2 of the International Building Code(IBC),we have performed special inspection of the following
item(s)per our inspection reports only:
Structural Steel
All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of
our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable
workmanship, provisions of the State Building Code and Standards,as well as the structural engineers design changes,approvals and
verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects,
deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type.
Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may
exist, It is the contractor's responsibility to perform their work in accordance with the approved construction documents.
CT! has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members
of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to
be conclusive representations of fact. Our reports pertain to the material tested/inspected only.
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods,
techniques,sequences or procedures of the construction or evaluating or reporting job conditions related to health,safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further
questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSO ' TESTING INC.
Kurtis Parkin
Project Manager
KPinm
cc: SEE'S CANDIES-RICHARD ESCALANTE 1 RESCALANTESSECS.COM
CITY OF TIGARD BUILDING DIVISION-WALTER'CHIP'BARNETT WALTER4TIG.ARO-OR.GOV
CARUSO TURLEY SCOTT INC-TROY TURLEY: MAIL
SARGENTI ARCHITECTS-SIMONE SHORT SSHORToSARGARCH.CO'd
WESTERN CONSTRUCTION SERVICES INC-CARTER SCHAFFRAN CARTERt=WESTERNCONSTRUCTION.COM
MACERICH VALLEY RIVER CENTER LLC-KAREN MAYNARD KAREN.MAvanno44ACERICH.COM
P:1Projects\General\20151T1 50 5 01 1 110-28-2015 Final Letter.doc Updated 11/30/11