PFI2015-00031 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PF12015-00031
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 10/22/2015
Parcel: 1 S136CD02200
Jurisdiction: Tigard
Site address: 7850 SW DARTMOUTH ST
Subdivision: PALMER ACRES Lot: 3
Project: Costco Wholesale street improvements
Project Description: Construct a new Southbound right turn lane at the intersection of SW Dartmouth St and Hwy 99. Costco
wholesale: 7850 SW Dartmouth St. Pacific Crossroads shopping center; 11701 Pacific Hwy
Owner: FEES
Description Date Amount
PFI Permit Fee 03/19/2015 $300.00
PHONE:
Contractor:
PHONE
FAX:
Applicant:
DAVID ROGERS
999 LAKE DRIVE
ISSAQUAH, WA 98027
PHONE: 425-313-8100
Total $300.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginnin work.
Permittee/Applicant r
Signature: 41
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12015-00031
Type: Condition Name: Status: Severity:
PFI—Street Imp 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI—Street Imp 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI—Street Imp 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI—Street Imp 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI—Street Imp 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI—Street Imp 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI—Street Imp 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI—Street Imp 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign
at each end of the construction area 72 hours(min.)before initiation of construction work.
PFI—Street Imp 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized
by the City Engineer.
PFI—Street Imp 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI—Street Imp 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI—Street Imp 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI—Street Imp 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI—Street Imp 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI—Street Imp 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by
the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI—Street Imp 18-SEWER SYSTEM TEST Applied Notice
A sewer system air-test and/or DVD T.V. test report and one set of"As-Builts"shall be provided for review and approval.
PFI—Street Imp 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>, to establish a preconstruction meeting.
PFI—Street Imp 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI—Street Imp 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI—Street Imp 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports,on a weekly basis,to the City's Inspector.
PFI—Street Imp 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI—Street Imp 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI—Street Imp 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems, take corrective action and, in general, will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI—Street Imp 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to
obtain or provide for proof of right-of-entry or easements.
PFI—Street Imp 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI—Street Imp 28-AS-BUILT DRAWING Applied Notice
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
PFI—Street Imp 29-PRIVATE WATER QUALITY FACILITY Applied Notice
The Developer shall maintain the water quality facility and correct any defective work, and shall perform all scheduled
maintenance to assure proper functioning of the facility.
PFI Street Imp 30-PUBLIC WATER QUALITY FACILITY Applied Notice
The Developer shall create and provide to the City a schedule for periodic(quarterly)maintenance of the water quality
facility. The Developer shall maintain said facility for a period of three(3)years from the date of City Conditional
Acceptance of the public improvements. On October 1 st of each year during this three(3)years period, the Developer shall
report, in writing, maintenance activities to the Director of Public Works. City crews should monitor proper removal and
disposal of silt and debris. Prior to City final acceptance of the facility,the Developer shall provide a written evaluation of the
operation and maintenance needs of the facility and correct any deficiencies identified in the evaluation.
PFI—Street Imp 31 -OTHER Applied Notice
CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PF12015-00131
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 09/17/2015
Parcel: 2S102CA00205
Jurisdiction:
Site address: 13285 SW ASH DR
Subdivision: VIEWCREST TERRACE Lot: 3
Project: Richey Sidewalk PFI
Project Description: Replacing 18 feet of the driveway 24 feet of approach
Owner: FEES
Description Date Amount
PHONEPFI Permit Fee 09/17/2015 $300.00
Contractor:
a
PHONE
FAX
L
Applicant:
SHELLY RICHEY
13285 SW ASH DR
TIGARD, OR
PHONE 503-476-6629
Total $300.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: i
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12015-00131 "
!XR2.L Condition Name: Status: Severity:
PFI_Sidewalk/[ 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Sidewalk/[ 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Sidewalk/[ 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Sidewalk/[ 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced, with like kind of material. Obtain City approval of restoration work.
PFI_Sidewalk/[ 05-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>,to establish a preconstruction meeting.
PFI—Sidewalk/1 06-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI_Sidewalk/[ 07-PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI—Sidewalk/1 08-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems, take corrective action and, in general, will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI—Sidewalk/1 09-OTHER Applied Notice
I
•
City of Tigard RECEIVED
16 2015
s PUBLIC WORKS— ENGINEERING
CITY OF TIGARD
Public Facility Improvement (PFI) Peff YyirGINEERING
DESCRIPTION OF WORK(in the right-of-way) TYPE OF WORK
Check-one: ❑ Utility Connection
❑ TYPE 1-Franchise Utility Work
Sidewalk/driveway approach
Work performed by NWN,PGE
❑ Street improvements
and/or utility agency.
Detailed description: ' I 0� 4JqTYPE 2-Sidewalk/Driveway/Sewer
J2 12--Q a Work performed for the purpose of:
• Sidewalk installation or repair.
• Driveway approach installation
Property address/location(s): rt 11 and/or repair
• Sanitary sewer lateral installation
and/or main line tap
`_ ,
El TYPE 3-Full scale Development
Applicant: `\Li�U II���/1L�1 Work performed with Iand use
approval which includes any of
Address: 1 2 9'V7 uw IAS the following:
City/state: T-%Q 41^'A Fitt Zip: Q'x a, 3 • Subdivisions or Partitions
Phone:_'3 3-4-ho- Ue- Email: Sh(A\tA t!D frc,,�-ie-r•, Cep • Streetwidening
Contact name: Sal O LA Phone: S�� �F7(o -CS�.Z eJ • Mainline installation for Sanitary
sewer,Storm sewer,Tigard water
Contractor: 9 aYI )l qO /7 I-&TG Lz C, and/or Tigard\ll,ater Service Area
CCB#: i707 Expiration: SUBMIT COMPIETED A"UCATtoN TO:
Address: 40/0 u-/ ve City of Tigard
City/state: OR Zip: JOU Pianning/EngineeHng
Phone(231 /41-70 2 Email:S1r .Cow�le®.y vv oC0W7 13M SW Hall Blvd.
/ Tigard,OR 97223
Contact name: -rO r-�✓'�cho Phones 9/�1 -70 9'9 Applications for"mi,ior work in right-of-way"
oiilt,may be emailed to:
Engineer: rQi}ermit8a1i .d-or goy
Address: /
City/state: Zip: ✓
Phone: Email: Case No.: ff T 20 IS
Contact name: Application submittal fee:
Additional fees:
Estimated value of work is required(if over$5,000): 1 U ' Application accepted:
(within the public right-of-way) By_m 6 Date: C1/14 /1'(
I_Opn
reviewed:
Is work related to a LAND-USE DECISION? ❑ Yes ❑ App
No ' Date:
If so, please specify (MLP, SDR, SUB,etc.) case #: B}
Applicant notified: 1
Is work related to a BUILDING PERMIT? ❑ Yes ❑ No By: ,ice- F. Date:
If so,please specify(BUILDING PERMIT)case#: 1ACURPU1\M•stersWwdUse Appikatiom a*v.07/09/201S
City of Tigard • 13125 SW Hall Bbd. • Tigard,Oregon 97223 • uwwtigard-or.gov • 503-718-2421 • Page I of 4
DEVELOPMENT ENGINEERING FEES
FOR STAIT USE' ONLY
Public Facility Improvement (PFI) Permit: _
APPLICATION FEE REQUIREEMENTS
Part 1: Required submittal fee$300.00 FRANCHISE UTILITY AND SIDEWALK/
PERMIT FEE DRIVEWAY AND UTILITY
Part 2: All non-water s}stem CONNECTIONS,ETC.improvements (work in the right of way)
Engineer's estimate X 5% (less$300.00 submittal fee)
Engineer's estimate X 2%Plan Review Sketch
(including information below)
WATER SYSTEM FEE Q Dimensions
Part 3: All public water system improvements
Engineer's estimate X 12% Q Site
Street Q Name
te Address
PFI Permit Fee Exemptions:
There will be no permit fee charged,or assurance required FULL SCALE DEVELOPMENT
for the following types of work: (Subdivisions/Partitions and Street Improvements)
• Sidewalk repair(less than 20 lineal feet)
• Relocate or replace mailbox Design Plans
(6
• Ditch cleaning that does not involve regrading. sets,24x36 or 22x-'A.)
• Weephole repair Q; Cover—Site,Vicinity;Abbreviation,Legend
• Curb repair or replacement (less than 20 lineal feet) D General Notes(City,Water,Sewer,etc)
• Lawn sprinkler system installation or repair. Q! Street(Plan,Profile)
• Street tree pruning or planting D Water,Storm and Sanitary(Plan Profile)
• Planter strip landscape maintenance Q Water Quality-Facilities
Test wells QI Grading
Qi Landscaping/Tree Plan
Q, Composite.U61it}Plan(Electrical,Phone,Gas,
Note: A cash assurance may be required per Storm,Sanitar);eater,Signage,Street Lights,etc)
TMC 15.04.140.(customer deposit) Q' Details.
D Traffic Sight.Distance.
Q, Signing and Striping
El Street Light.Plan and Photometric
0 Engineers seal/signature
Q Sheet label(project land use name,revision and
plan log block,dates and sheet numbers.)
Additional Submittals
(per Land Use conditions)
0 Traffic Report.
Q Storm water Drainage Calculations
Q Geotechnical Report
Q Preliminary Access Report(Sight Distance)
Q Proposed Plat
Q Pathway,Design (if applicable)
Q Water Department Approval
PUBLIC FACILITY IMPROVEMENT PERMIT
Cityof Tigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • -%mox.tigard-or.gov • 503-718-2421 • Page 3 of 4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work.
*When the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written
authorization from the owner or an agent of the oumer. 'nie owner(s)must sign this application in die space provided or submit a written
authorization with this application.
BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT:
• The above request does not violate ny deed restrictions that may be attached to or imputed tgon the subject Va=LW.
• If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval_
• All of the above statements and the statements in the plot plan,attachments,and exhibits transmitted herewith,are true;and
the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application,including the policies and criteria,and understands the
requirements for approving or denying the application.
SIGNATURES of each owner of the subject property required.
Ll
Applicant/Autho ' ed Agent's signature Print name ,d Date
Owners fi4gnature Print name Date
Owners signature Print name Date
Owner's signature Print name Date
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www,6gafd-or.gov 503-718-2421 • Page 2 of 4
... .,.
4�
ir-
a
gra
:h
is 4%
1 �b
It o .
N r -
Feet
1y+•
# _ —f ►
21 i�r , ;