Plans FP S aoc 5-- 0o/c,s-
lC, fosw72 r_.-
8e � -
- ,- 1 IIIIIIIIIIII IIIIIIIIII IIII 11111 I I IIl 11 111 1I
r t
'''..1 rya
N
► Il riiL ® i: 7 '. AREA OF WORK II
( r 1,W'
1 "�• 16220 f324� 18250 s' 1�216 16290
O - O V'
,,
4
4
0 OO KEY PEA\ RECEIVED
-
NOT TO SCALE OCj 5 2015
`l QM/��rIGARD
DIVISION
I — j 4
i.al 1111i 11
�a�lllllllllll'I I
I uIitmu IlIIrim.
--- — — —
t- ► El
O ' ! O
- — i 1i1 SAMMYS FOR WOOD
i
�-— 0 ��I 3/8" ALL THREAD ROD
______ _____� ( I - TOLCO 200 TRIMLINE
H ± L'_ 1 ADJUSTABLE BAND HANGER
I I
1 i 1
PARTIAL REFLECTED CEILI\G PLA\ HA\GER DETAIL
1/4",v-0" NOT TO SCALE
0' 2' 4' 8'
NOTES REVISIONS SPRINKLER SYMBOLS FIRE PROTECTION PLAN
Meets design requirements of NFPA 13 2013 edition. GATE oESiAPna1 BY EYE':i0E9ltaga;Fll13 1:11fI(:Leillu:Sx iIelfLilie 31i 1 o b p 10 8- 16 2 4 0 SPEC TI
0 NEW rim TY323 v 0'.Ch/Ch 155 1/Y 1/2' 5.6 8 "^'�,;
All piping to be Eddy Thread w/ screwed ductile iron fittings. t PERMIT NO.
All hangers to be per NFPA 13 requirements. e a W VAT T CONTRACT NO.
All armovers greater than 2'-0" shall be provided with hangers. FIRE PROTECTION, 1 N C. 16240 SW 72ND AVE. DRAWN BY M. COLLEY
All of work area will light hazard occupancy. 9095 S.W.Burnham PORTLAND, OR 97224 SCALE 1/4" = 1'-0"
Max. sprinkler spacing to be 225 sq. ft. per head. Tigard,OR 97223 DATE 15 OCT 2015
All heads cut in from branch lines using mechanical T.
(503)684-2928 FP 1 OF 1
City o f Tigard Permit No.: F/°5 2O l 5 —U.21 $J
13125 SW Hall Blvd.,Tigard,OR 97223
= Phone: 503.718.2439 Fax: 503.598.1 Date Received: /U/(
j/ S'
Inspection Line: 503.639.4175 EC E I VE T I G A R D Internet: www.tigard-or.gov By: gr✓4/l/6--^'
;\cl ,e4-4"-71---
OCT 152015
FIRE SPRINKNWFirdMVIT FOR ALTERATIONS
O OVEMENTS
(1 to 10 SPRINKLER HEADS WITHOUT PLANS)
Project Name: lobpl08-16240 SPEC TI Occupancy: Light
Job Address: 16240 SW 72nd Ave Type of Construction: IIIB
Suite: —,-
Contractor: Wyatt Fire Protection Phone: 503-684-2928
•
Number of Proposed or Altered Heads: 8
Type: SSP Hazard: Light Density: 0.1
I, Ashley Nishihara, Wyatt Fire Protection Oregon Construction Contractors Board No. 64077
certify the following is true and reasonably defines the scope of work for this project:
a) All work is limited to drops and armovers in a light-hazard occupancy.
b) Positions of sprinkler heads relative to architectural features such as soffits, beams, partitions, walls, etc.
complies with current adopted edition of NFPA 13.
c) The proposed work does not require hydraulic calculations.
d) Only one sprinkler head will be installed from one drop (exception: up to two heads from one drop may be
installed when each head is in a separate fire area).
e) The area covered per sprinkler head is limited to the spacing requirements of NFPA 13.
f) Tenant improvements in a new building shall be equipped with Quick Response heads (see 2002 NFPA 13,
Section 8.3.3.1 for exceptions).
g) The installation shall comply with the requirements of the current adopted edition of NPFA 13.
h) Piping shall not be concealed until hangers and bracing are inspected.
i) Final approval shall be subject to onsite tests and inspections.
In addition, I understand the following is required:
• Submit(3) copies of a sketch showing the area of work within the building's structure.
• Building fire protection system permit.
• A copy of this doc e t with a copy of the sketch attached shall be available for all inspections.
Signature: /'i � ' a Date: 10/15/2015
Print Name: Ashley Nishihara
I:\Building\Forms\FireSprinklerAffidavit_071514.docx Page 1 of 1