Plans RECEIVED
OCT 7 2015
-- CITY OF TIGARD
BUILDING DIVISION
EAD MAIN
2(E) 2(E) / /) ?<,/c- oo/
r T
/DI ,, 17?-/ -
-} - AREA OF WORK
i
�,� /CUT IN ARMOVER
1 / 4f •. .,tea ".�'i .
M 0/
billill* �� _ . ... ••
, J., ___------MOM 0/ 1 ' —
�'�W.1 —
,,
SAMMYS FOR WOOD
f. 3/8"ALL THREAD ROD _ '
.441411,1111 'I TO CROSS MAIN
TOLCO 200 TRIMLINE Y.
is J p
ADJUSTABLE BAND HANGER
l
PARTIAL REFLECTED CEILING PLAN HANGER DETAIL VICINITY MAP
1/8"=1'-0" NOT TO SCALE NOT TO SCALE
IIIII ti . ._ . ...,._. ,. ...,.
,,,,,,...
0' 4' 8' 16'
NOTES REVISIONS SPRINKLER SYMBOLS /►�� /�'�� R�
Meets design requirements of NFPA 13 2013 edition. )i'Ei/wfycGn_i�•9��i9aoiai��aal�l�.ICmleae°e1 l��Le9[1t @1 CHEMWEST CLE/"U\ ROOM
All piping to be Eddy Thread w/screwed ductile iron fittings. O NEW TYCO TY323 SSP-Of Ch/Ch 155 2' 2" 5 6 4 W YAT T NO
All hangers to be per NFPA 13 requirements. CONTR CT
1���7� �A���Q�i CONTRACT NO.C15-653
All annoyers greater than 2'-0"shall be provided with hangers. FIRE PROTECTION, INC. PCATL .O QON 97224 DRAWN B\A.NISHIHARA
All of work area will be ordinary hazard group 1 occupancy.
Max.sprinkler spacing to be 130 sq.ft.per head. 9095 S.W.Burnham DATE A OCT 2015
=1
All heads cut in from branch lines. Tigard,OR 97223
(503)684-2928 CHEMWEST FP 1 OF 1
City of Tigard D Permit No.: s /S=do 15-7
la 13125 SW Hall Blvd.,Tigard,OR 97223 \'
s r--PS,
Phone: 503.718.2439 Fax: 503.598CE' Y Date Received: r6/7 --
T I G A R D Inspection Line: 503.639.4175 1� /j ,"
Internet: www.tigard-or.gov oc� 'T 2015 By: doz,vei ..i 7� � —
FIRE SPRINK3 .∎ T FOR ALTERATIONS
OICTE'NANT IMPROVEMENTS
(1 to 10 SPRINKLER HEADS WITHOUT PLANS)
Project Name: Chemwest Cleanroom Occupancy: Ordinary 1
Job Address: 15865 SW 72nd Ave Type of Construction: IIIB
Suite: Bldg C
Contractor: Wyatt Fire Protection Phone: 503-684-2928
Number of Proposed or Altered Heads: 4
Type: SSP Hazard: Ordinary 1 Density: 0.15
I, Ashley Nishihara, Wyatt Fire Protection Oregon Construction Contractors Board No. 64077
certify the following is true and reasonably defines the scope of work for this project:
a) All work is limited to drops and armovers in a light-hazard occupancy.
b) Positions of sprinkler heads relative to architectural features such as soffits, beams, partitions, walls, etc.
complies with current adopted edition of NFPA 13.
c) The proposed work does not require hydraulic calculations.
d) Only one sprinkler head will be installed from one drop (exception: up to two heads from one drop may be
installed when each head is in a separate fire area).
e) The area covered per sprinkler head is limited to the spacing requirements of NFPA 13.
f) Tenant improvements in a new building shall be equipped with Quick Response heads (see 2002 NFPA 13,
Section 8.3.3.1 for exceptions).
g) The installation shall comply with the requirements of the current adopted edition of NPFA 13.
h) Piping shall not be concealed until hangers and bracing are inspected.
i) Final approval shall be subject to onsite tests and inspections.
In addition, I understand the following is required:
• Submit(3) copies of a sketch showing the area of work within the building's structure.
• Building fire protection system permit.
• A copy of this document with a copy of the sketch attached shall be available for all inspections.
a'r
Signature: 5� ,/.4.72(-fW Date: 10/6/2015
Print Name: Ashley Nishihara
I:\Building\Forms\FireSprinklerAffidavit_071514.docx Page 1 of 1