Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report (7)
fi AD/ r- 00157 lX166 SA) 72 Metro Safety & Fire 14324 SE Stark Street; Portland, Oregon 97233 PHONE (503)231-2999 CCB#63651 UPS Distribution Center 14160 SW 72nd Avenue Tigard, Oregon ����p PR()Fe° 44. � NGINE.,9 /�?i 12089PE 9r ,0 • adot./ OREGON rb /9'-`141'9V 20, 19 o' C O\--5 EXPIRES: 12/31/2016 FIRE PROTECTION • HYDRAULIC CALCULATIONS HYDRANT FLOW REQUEST FORM PROJECT: City Of Tigard flow ADDRESS: 6713 SW BONITA RD TIGARD OR CROSS STREET: FLOW HYDRANT LOCATION: 6713 SW BONITA STATIC: 105 RESIDUAL: 98 GPM: 1680 DATED: 06.17.13 RESIDUAL HYDRANT LOCATION: 6777 SW BONITA RD STATIC: 105 RESIDUAL: 103 GPM: DATED: 06.17.13 • Water Availability Curve 110 100 90 80 70 U) a P. 60 N a- 50- 40- 30— 20— L 10-- I I i I t 800 1600 2400 3200 4000 4800 5600 6400 7200 8000 Flow(GPM) •Static=105 psi. •Residual=98 psi at a flow of 1680 gpm. • . ,. . , , _ 1 14160, • .;, , ' r • lir Z 1 14160 14200 I- i 1 1 , .i..... , .-, 1 _ i . I____ ____..____ —_ --- --— - - --- ! 8, 1H a- ! i ; 1 4r- I I . 11 ,-.....-, 1 14280 4 tr:. thp6713 6713 6713 6713 6713 . . L ' ,. '------- ------------------ -Ali i; 4 i 1 ‘1:., Flow Hydrant . sr ,I. _ _ <, ,i, - --- , 1 ----- 1 i Z I Csi L El r... 1 L.,1 ......'iNI 6777 6777 6777 6777 4 1 131711 .---1 ,. 1 ' L Monitor Hydrant 1 t , 722L t: L _ 1 0 _J L----------- 0- BONITA RD ------.77_77,7—'-{----------,,,,, Hi \,,. g:i L4j529 - +. 5-**1 -------—-- -'77---;61' I 16 DPI-- —__ -- ---- - 2.4' DIP- _ I — ----- -- L ' 14600 : - — a, 11 i _ ---- --- I ' ' ----'1 t. -— -lt 1 1 - 0 '■ ..:1 i , r 1: 1 a 6600 / '14 l 1 - 1--- ,.. 67501, N., ! '15383 n ,l I Feet _ to- 146A 1 , 0-• 250 -WI— , I , 6010 ,.....6" DIP' . ' n ,,• z, 1■1 , 1 . _ . ' Hydraulic Calculations for Project Name: UPS Distribution Center Location: 14160 SW 72nd Avenue,Tigard, Oregon, Drawing Name: UPS Tigard.cad Calculation Date. 9/29/2015 Design . Remote Area Number: 1 Remote Area Location: New Rack Area Occupancy Classification: Spec.Warehouse Commodity Classification: Class IV-20'-0 Density: 0.600gpm/ft2 Area of Application: 2000.00ft2(Actual 2022.36ft2) Coverage per Sprinkler: 96.00ft2 Type of sprinklers calculated: Upright No. of sprinklers calculated: 21 Type of System: Wet Volume of Dry or PreAction System: N/A In-rack Demand: N/A gpm at Node: N/A Hose Streams: 500.00 at Node: 15 Type: Allowance at Source Total Water Required (including Hose Streams where applicable): From Water Supply at Node 15: 1756.30 @ 71.209 Water Supply Information: for Node: 15 Date: 06/17/2013 Location: SW Bonita Source: Tigard Water Name of Contractor: Metro Safety and Fire Address: 14324 SE Stark Street, Portland, Oregon 97233 Phone Number: (503)231-2999 Name of designer: M.Walter, SET Authority Having Jurisdiction: Tualatin Valley Fire& Rescue Notes: �©M.E.P.CAD, Inc. idAutoSPRINK®12 v12.0.29.0 1 9/29/2015 8:22:12AM Page 1 Hydraulic Graph Job Name: UPS Distribution Center N 1.85 Remote Area Number: 1 Date:9/29/2015 150 Water Supply Summary Sheet 135 ( Node: 15 120 105 Static Pressure 105 000 1680 00 98.000 1756 30 @ 97 401 90 N z 75 1256.30 @ 71.209 d ®1756 30 with Hose Allowance at Source a 60 45 System demand curve 30 15 0 -u 111 1 1 1 1 1 1 1 1 1 1 1 11i i i i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 II I I I I i i i i I I I I i i II 1 1 1 1 1 1 1 1 1 0350 700 1050 1400 1750 2100 2450 2800 3150 3500 Flow-gpm 1AA,©M E P.CAD, Inc. 1 AutoSPRINK®12 v12 0.29 0 9/29/2015 8•22•14AM Page 2 ill Summary Of Outflowing Devices Job Number 15-1106-MS Report Descnption Spec Warehouse(1) Actual Flow Minimum Flow K-Factor Pressure Device ((I pm) (qpm) (K) (psi) c Sprinkler 101 57.60 57.60 11.5 25.087 • Sprinkler 102 57.80 57 60 11.5 25.264 Spnnkler 103 58.67 57 60 11.5 26 028 Sprinkler 104 60 59 57 60 11 5 27 756 Sprinkler 105 57 61 57.60 11 5 25 096 Sprinkler 106 57 99 57 60 11 5 25 424 Sprinkler 107 57 62 57.60 11 5 25 106 Spnnkler 108 57 82 57 60 11 5 25 280 Spnnkler 109 58 68 57 60 11 5 26 038 Sprinkler 110 60.59 57 60 11 5 27 757 Sprinkler 111 57.63 57 60 11.5 25 116 Sprinkler 112 58.01 57 60 11 5 25 449 Sprinkler 113 57.69 57 60 11.5 25.164 Sprinkler 114 57 89 57 60 11 5 25 342 Sprinkler 115 58 76 57 60 11 5 26 107 Sprinkler 116 60 68 57 60 11 5 27.839 Sprinkler 117 57 70 57 60 11.5 25.173 Sprinkler 118 58 08 57 60 11 5 25 503 Spnnkler 119 68.20 57 60 11 5 35 171 Sprinkler 120 68 49 57.60 11 5 35.469 Sprinkler 121 68 20 57 60 11 5 35.173 c Most Demanding Sprinkler Data ©M E.P CAD,Inc. 411 AutoSPRINK®12 v12 0.29.0 9/29/2015 8•22•16AM Page 3 Job Name: UPS Distribution Center 'Remote Area Number: 1 Date: 9/29/2015 Supply Analysis Static Residual Flow Available Total Demand Required Pressure Node Name (psi) (psi) (gpm) (psi) (gpm) (psi) 15 Water Supply 105.000 98.000 1680.00 97 401 1756.30 71.209 Node Analysis Node Number Elevation(Foot) Node Type Pressure at Discharge at Notes Node Node (Psi) (gpm) 15 0'-0 Supply 71.209 1256.30 101 26-0 Spnnkler 25.087 57.60 102 26-0 Sprinkler 25.264 57.80 103 26-0 Sprinkler 26.028 58 67 104 26-0 Sprinkler 27.756 60 59 105 26-0 Sprinkler 25.096 57.61 106 26-0 Sprinkler 25 424 57.99 • 107 26-0 Sprinkler 25 106 57.62 108 26-0 Sprinkler 25.280 57.82 109 26-0 Sprinkler 26.038 58 68 110 26-0 Sprinkler 27.757 60 59 111 26-0 Sprinkler 25.116 57.63 112 26-0 Sprinkler 25.449 58 01 113 26-0 Sprinkler 25 164 57.69 114 26-0 Sprinkler 25.342 57.89 115 26-0 Sprinkler 26 107 58.76 - 116 26-0 Sprinkler 27.839 60 68 117 26-0 Sprinkler 25.173 57.70 118 26-0 Sprinkler 25.503 58.08 k,©M.E.P.CAD, Inc. Ai AutoSPRINK®12 v12.0.29.0 9/29/2015 8 22:18AM Page 4 Job Name: UPS Distribution Center Remote Area Number: 1 Date: 9/29/2015 Node Number Elevation(Foot) Node Type Pressure at Discharge at Notes Node Node (psi) (gpm) ' 119 26-0 Sprinkler 35.171 68.20 120 26-0 Sprinkler 35 469 68.49 121 26-0 Sprinkler 35.173 68.20 1 26-0 40.387 2 25-0 45.459 3 25-0 45.587 4 25'-0 45.800 5 25-0 46.078 6 25-0 46.380 7 25-0 46.702 8 25-0 47.045 9 25-0 47.406 10 25'-0 47 788 11 25-0 48.191 12 25-0 49 442 13 6-0 58.490 14 1'-0 65.871 16 26-0 37.606 17 25-0 39.603 18 25-0 39 727 - 19 25'-0 40.647 20 25-0 42.335 21 25-0 43.521 ik,©M.E.P.CAD, Inc. di AutoSPRINK®12 v12.0 29.0 9/29/2015 8:22.18AM Page 5 Job Name: UPS Distribution Center Remote Area Number: 1 Date: 9/29/2015 Node Number Elevation(Foot) Node Type Pressure at Discharge at Notes Node Node (psi) (9Pm) • 22 25-0 44.342 23 25-0 44.885 24 25-0 45 214 25 25-0 45 378 26 26-0 45.097 27 26-0 47.202 28 26-0 40.345 29 25-0 45.401 30 26-0 37.725 31 25-0 39.735 32 25-0 40 730 33 25-0 41.288 34 25-0 41.545 35 25-0 41615 36 26-0 41419 37 26-0 44 704 38 25-0 45 375 39 25-0 45.376 40 25-0 45.380 41 25-0 45.388 42 26-0 40 502 43 26-0 37.725 44 26-0 43.635 (s�©M E.P.CAD, Inc. AutoSPRINK®12 v12.0.29 C 9/29/2015 8:22:18AM Page 6 Job Name: UPS Distribution Center Remote Area Number: 1 Date: 9/29/2015 Node Number Elevation(Foot) Node Type Pressure at Discharge at Notes Node Node (psi) (gpm) 45 26-0 39.640 46 25-0 45.427 47 26-0 45168 48 26-0 47.583 49 26-0 44.919 50 26-0 46.834 51 26-0 44.588 52 26-0 46.475 53 26-0 44.057 54 26-0 46.120 55 26-0 43.268 56 26-0 45.766 57 26-0 42.137 58 26-0 45.408 59 26-0 40.590 60 26-0 44.660 61 26-0 41.113 62 26-0 44.688 63 26-0 41.353 64 26-0 44.701 ©M.E.P.CAD, Inc AutoSPRINK®12 v12.0.29.0 9/29/2015 8:22.18AM Page 7 Job Name: UPS Distribution Center Remote Area Number: 1 Date: 9/29/2015 Pipe Information Flow added Length C Factor Notes Elev 1 Fittings 8 Total(Pt) Node 1 K-Factor this step Nominal ID (Foot) Fitting/Device(Equivalent (Foot) Devices (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) (Q) (psi) to(Pf)and shown as a (Foot) (Foot) Friction(Pf) negative value. 101 26-0 11.5 57.60 2 (See 9'-0 120 25.087 Route 1 Notes) Sprinkler 102 26-0 48 10 2 1570 0 019712 9'-0 0 177 102 26-0 11 5 57 80 2 (See 9'4;1 120 25 264 Notes) Sprinkler 103 26-0 105 90 2 1570 0 084893 9'-0 0 764 103 26-0 11 5 58 67 2 (See 9'-0 120 26 028 Notes) Sprinkler 104 26-0 164 57 2 1570 0 191894 9'-0 1 727 104 26'-0 11 5 60.59 2 (See 24'-61/2 120 27 756 Notes) Sprinkler, 12'-3'/s 1 26-0 225 16 2 1570 0 342693 T(12.-3'/:) 36' 10'h 12.631 1 26-0 2 (See 1-0 120 40 387 Notes) 10'-0 0 434 2 25-0 . 225.16 2 0670 11'-0 0.421743 4.639 P0(10.-0) - 2 25-0 413 48 6 10'5 120 45 459 Flow(q)from Route 3 3 25-0 638.64 6 3570 0 012205 10'-5 0 127 3 25-0 225 47 6 10'0 120 45 587 Flow(q)from Route 5 4 25-0 864.11 6.3570 0 021353 10'-0 0.214 4 25-0 132.16 6 10'0 120 45 800 Flow(q)from Route 7 5 25-0 996.27 6 3570 0 027785 10'-0 0 278 5 25-0 45.05 6 10.-0 120 46 078 Flow(q)from Route 14 6 25'-0 1041.31 6.3570 0 030154 10'-0 0 302 6 25 0 38 93 6 10'-0 120 46 380 Flow(q)from Route 13 7 25-0 1080.25 6.3570 0 032273 10'-0 0 323 7 25 0 35 11 6 10'-0 120 46.702 Flow(q)from Route 12 8 25-0 1115 36 6 3570 0 034240 10'-0 0.342 Ak,©M E P CAD,Inc 411 AutoSPRINK®12 v12 0 29 0 1 9/29/2015 8 22 20AM Page 8 Job Name UPS Distribution Center Remote Area Number: 1 Date 9/29/2015 Pipe information Elev 1 Flow added Fittings& Length C Factor Total(Pt) Notes Node 1 K-Factor this step Nominal ID Devices (Foot) Fitting/Device(Equivalent (Foot) (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) (Q) (Foot) (psi) to(Pf)and shown as a (Foot) negative value. 8 25 0 33 46 6 10'-0 120 47 045 Flow(q)from Route 11 9 25-0 1148 82 6.3570 0 036165 10'-0 0 362 9 25 0 33 73 6 10'-0 120 47.406 Flow(q)from Route 10 10 25-0 1182 56 6.3570 0 038154 10'-0 0 382 10 25'0 35 50 6 10'-0 120 47.788 Flow(q)from Route 2 11 25-0 1218.06 6.3570 0 040300 — 10'-0 0.403 11 25-0 38 24 6 (See 4'-2 120 48.191 Notes) Flow(q)from Route 9 25-2 - 12 25-0 1256 30 6 3570 29'-4 0 042671 1.251 2fE(12'-7) 12 25-0 6 (See 19'-0 120 49 442 Notes) 8 237 • 13 6-0 1256 30 6 3570 19'0 0 042671 0.811 f(-0.000),Gauge 1 - 13 6'-0 6 (See 5'-0 120 58.490 Notes) ' 2168 0 042671 f(-0 000), BFP(-5 000) 14 1-0 1256 30 6 3570 5'0 5 213 14 1'-0 8 (See 600'-0 140 65.871 Notes) 32'-8'% 0.434 15 0'-0 1256 30 8 5100 0.007751 E(32'-8'/:), S 632'-8'/2 4 904 500 00 71.209 Hose Allowance At Source 15 1756 30 Total(Pt) Route 1 101 26'-0 11.5 57.60 2 (See 9'-0 120 25.087 Route 2 Notes) Sprinkler 105 26'-0 . ' 9 50 2 1570 0 000981 — 9'-0 0 009 105 26-0 11.5 57 61 2 (See 9'-0 120 25.096 Notes) Sprinkler -106 26-0 67.11 2 1570 0 036508 9'-0 ' 0 329 106 26-0 11.5 57.99 2 (See 99'-3'A 120 25 424 Notes) Sprinkler, ;, , 6'-2 . 16 26-0 125.10 2.1570 0 115536 — E(6' 2) 105-5 12 181 ..,©M E P CAD,Inc 4111 AutoSPRINK®12 v12 0 29 0 1 9/29/2015 8 22 20AM Page 9 Job Name: UPS Distribution Center Remote Area Number: 1 Date: 9/29/2015 Pipe Information Elev 1 Flow added Fittings& Length C Factor Total(Pt) Notes Node 1 K-Factor this step Nominal ID Devices (Foot) Fitting/Device(Equivalent (Foot) (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) (Q) (Foot) (psi) Friction(Pf) to(Pf)and shown as a (Foot) negative value. 16 26'-0 2 (See 1'-0 120 37 606 Notes) 10'-0 0.434 17 25-0 12510 2.0670 11'-0 0142187 1.564 P0(10'-0) 17 25 0 2'/: 10'-5 120 39.603 18 25-0 61.98 2.6350 0 011887 10'-5 0.124 18 25'0 125.32 2% 10'-0 120 39.727 Flow(q)from Route 6 19 25-0 187 30 2.6350 0.091968 10'-0 0.920 19 25'0 72.74 2% 10'-0 120 40.647 Flow(q)from Route 8 — 20 25-0 260.03 2.6350 0.168754 10'-0 1 688 20 25 0 2+%� 10'-0 120 42.335 — 21 25-0 214.98 2.6350 0118687 10'-0 1.187 21 25'0 2'/z 10'-0 120 43.521 22 25-0 176 05 2.6350 0.082012 10'-0 0.820 22 25-0 2'/: 10'-0 120 44.342 — 23 25-0 140 94 2.6350 0 054344 10'-0 0.543 23 25 0 2'/: 10'-0 120 44 885 24 25-0 107 48 2.6350 0 032913 10'-0 0.329 24 25 0 2'/: 10'-0 120 45 214 25 25-0 73.74 2 6350 0.016395 10'-0 0.164 25 25-0 2 (See 1'-0 120 45.378 Notes) P0(10'-0) 10'-0 -0.434 .26 26'-0 35.50 2.0670 0.013835 – 11'-0 0.152 26 26'-0 2 (See 168'-10 120 45 097 Notes) E(6'-2) 18'-5% 27 26'-0 35.50 21570 0.011241 T(12'-3%) 187'-3% 2 105 ,,©M.E.P.CAD,Inc A AutoSPRINK®12 v12 0 29 0 1 9/29/2015 8 2220AM Page 10 Job Name: UPS Distribution Center Remote Area Number 1 Date: 9/29/2015 Pipe Information Elev 1 Flow added I Fittings& Length C Factor Total(Pt) Notes Node 1 K-Factor this step Nominal ID Devices (Foot) Fitting/Device(Equivalent (Foot) . (q) _ Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) (Q) (Foot) (psi) Friction(Pf) to(Pf)and shown as a (Foot) negative value. 27 26-0 2 (See 1'-0 120 47 202 Notes) 10'-0 0.434 10 25' 0 35 50 2 0670 0 013835 — PO(10'0) 11'-0 0.152 47 788 I Total(Pt) Route 2 107 26-0 11 5 57 62 2 (See 9'-0 120 25 106 Route 3 Notes) Sprinkler 108 26'-0 47.64 2 1570 0 019370 9'-0 0 174 108 26'-0 11.5 57 82 2 (See 9'-0 120 25 280 Notes) Sprinkler 109 26'-0 105 47 2 1570 0 084248 9'-0 0 758 109 26'-0 11.5 58.68 2 (See 9'-0 120 26 038 Notes) — -- Sprinkler 110 26-0 16415 21570 0190980 9'-0 1 719 •110 26'-0 11.5 60.59 2 (See 24'-61/2 120 27 757 Notes) Sprinkler, - 12'-3'/2 28 26'-0 224 74 2 1570 36-10'/z 0.341504 12 587 T(12'-31/2) 28 26-0 2 (See 1'4) 120 40.345 Notes) 10'-0 0.434 29 25-0 224 74 2.0670 11'-0 0.420279 4.623 P0(10'-0) 29 25'0 188 75 6 10'-8 120 45 401 Flow(q)from Route 4 2 25'0 413 48 6 3570 10' 8 - 0 005461 0.058 45 459 Total(Pt) _Route 3 107 26-0 11 5 57.62 2 (See 9'-0 120 25 106 Route 4 I Notes) Sprinkler 111 26'0 9 98 2 1570 0 001074 — 9'-0 0 010 111 26-0 11 5 57 63 2 (See 9'-0 120 25 116 Notes) Sprinkler 112 26'-0 67 61 2 1570 0 037010 9'-0 0 333 112 26-0 11 5 58 01 2 (See 99'-31/2 120 25 449 • Notes) Sprinkler, 6'-2 '30 26-0 125 62 2 1570 0 116435 - E(6'-2) 105'-5 12.276 k,©M E P CAD,Inc Al AutoSPRINK®12 v12 0 29 0 1 9/29/2015 8 22 20AM Page 11 Job Name: UPS Distribution Center Remote Area Number: 1 Date:9/29/2015 Pipe Information Flow added Length C Factor Notes Elev I Fittings& Total(Pt) Node I K-Factor this step Nominal ID Devices (Foot) Fitting/Device(Equivalent (Foot) (q) Length) Fitting Pf Friction Elev Pe ( ► Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 (Foot) (Q) Actual ID Length Total (psi) Friction(Pf) to(Pf)and shown as a (Foot) (Foot) negative value. 30 26-0 2 (See 1'-0 120 37.725 Notes) 10'-0 0.434 — 31 25'-0 125.62 2.0670 11'-0 0143293 1576 P0(10.-0) 31 25'0 63 12 2'/: 10'-8 120 39.735 Flow(q)from Route 18 32 25'-0 188 75 2.6350 0 093288 10'-8 0.995 32 25 0 2'/2 10'-8 120 40.730 33 25-0 138.05 2.6350 0.052302 10'-8 0.558 33 25 0 2'/: 10'-8 120 41.288 34 25-0 90 78 2 6350 0.024083 10'-8 0.257 34 25 0 2+%� 10'-8 120 41.545 35 25-0 45.16 2.6350 0 006618 10'-8 0.071 - 35 25-0 2 (See 1'-0 120 41.615 Notes) P0(10'-0) 10'-0 -0 434 36 26-0 45.16 2.0670 0.021587 — 11'-0 0.237 36 26-0 2 (See 168'-10 120 41 419 Notes) E(6'-2) 18'-5% 37 26-0 45.16 2.1570 187-3% 0 017541 T(12'-3%) 3 285 37 26-0 2 (See 1'-0 120 44.704 Notes) 10'-0 0 434 38 25'-0 45 16 2.0670 11'-0 0.021587 0.237 PO(10'-0) 38 25 0 6 10'-8 120 45.375 39 25-0 45.16 6 3570 0 000091 10'-8 0.001 39 25'0 45.62 6 10'-8 120 45 376 Flow(q)from Route 17 — .40 25-0 90 78 6.3570 0 000330 10'-8 0.004 40 25'0 47.27 6 10'-8 120 45 380 Flow(q)from Route 16 41 25-0 138.05 6.3570 0 000718 10'-8 0 008 ,ii,©M E P CAD,Inc 11 AutoSPRINK®12 v12 0 29 0 1 9/29/2015 8 22 20AM Page 12 Job Name: UPS Distribution Center Remote Area Number: 1 Date: 9/29/2015 Pipe Information Elev 1 Flow added Fittings& Length C Factor Total(Pt) Notes • Node 1 K-Factor this step Nominal ID Devices (Foot) Fitting/Device(Equivalent (Foot) (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) (Q) (Foot) (psi) Friction(Pf) to(Pf)and shown as a (Foot) negative value. 41 25'0 50 70 6 10'-8 120 45 388 Flow(q)from Route 15 29 25-0 188 75 6.3570 0.001280 10'-8 0.014 45 401 Total(Pt) Route 4 --_ -- - I -T --- - -- • 113 26'-0 11.5 57.69 2 (See 9'-0 120 25.164 Route 5 Notes) J Sprinkler 114 26-0 48.14 2.1570 0.019744 9'-0 0.178 114 26-0 11.5 57 89 2 (See 9'-0 120 25.342 Notes) Sprinkler - 115 26-0 106.03 21570 0.085086 9'-0 0.766 115 26-0 11.5 58.76 2 (See 9'4) 120 26.107 Notes) Sprinkler • 116 26-0 164.79 2.1570 0192367 9'-0 1.731 • 116 26'-0 11.5 60 68 2 (See 24'-61/2 120 27.839 Notes) Sprinkler, 12'-3% 42 26'-0 225.47 2.1570 0.343566 T(12'-31/2)12.663 42 26'-0 2 (See 1,-0 120 40.502 Notes) 10'-0 0.434 3 25-0 225.47 2.0670 11'0 0.422817 4 651 P0(10.-0) 45.587 Total(Pt) Route 5 113 26'-0 11.5 57 69 2 (See 9'-0 120 25.164 Route 6 Notes) _. Sprinkler 117 26'-0 9 55 2 1570 0.000990 9'-0 0 009 117 26'-0 11.5 57 70 2 (See 9'-0 120 25.173 Notes) Sprinkler 118 26'-0 67 25 2.1570 0.036644 9'-0 0.330 118 26'-0 11.5 58.08 2 (See 99'-31/2 120 25.503 Notes) Sprinkler, 6'-2 -43 26'-0 125 32 2.1570 0.115919 E(6'-2) 105-5 12.222 •43 26-0 2 (See 1,-0 120 37.725 Notes) 10'-0 0.434 -18 25-0 125.32 2.0670 11'-0 0.142659 1.569 P0(10'-0) 39.727 Total(Pt) Route 6 k,©M.E P CAD,Inc. 11 AutoSPRINK®12 v12 0 29.0 1 9/29/2015 8 22 20AM Page 13 Job Name UPS Distribution Center Remote Area Number: 1 Date 9/29/2015 Pipe Information Elev 1 Flow added Fittings& Length C Factor Total(Pt) Notes Node 1 K-Factor this step Nominal ID Devices (Foot) Fitting/Device(Equivalent (Foot) (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) (0) (Foot) Foot (psi) Friction(Pf) to(Pf)and shown as a (Foot) negative value. 119 26-0 11 5 68 20 2 (See 9'-0 120 35 171 Route 7 Notes) Sprinkler 120 26'-0 63 67 2 1570 — 0 033118 9'-0 0 298 120 26-0 11 5 68 49 2 (See 51'-61/2 120 35 469 Notes) Sprinkler, 12'-31/2 44 26-0 13216 21570 0127886 — T(12'-31/2) 63'-10'/2 8 167 44 26-0 2 (See 1-0 120 43.635 Notes) 10'-0 0 434 4 25-0 132 16 2 0670 11'0 0 157385 1 731 — P0(10'-0) 45 800 Total(Pt) Route 7 119 26-0 11.5 68 20 2 (See 9'-0 120 35 171 Route 8 Notes) Sprinkler - 121 26-0 4 53 2 1570 0 000249 9'-0 0.002 -121 26-0 11 5 68 20 2 (See 99'-31/2 120 35 173 Notes) Sprinkler, 6'-2 ' 45 26-0 , '. 72 74 2 1570 0 042367 E(6'-2) 105'-5 4 467 45 26-0 2 (See 1-0 120 39.640 Notes) 10'-0 0 434 — 19 25-0 72 74 2 0670 11'0 0.052140 0.574 P0(10'-0) 40.647 Total(Pt) Route 8 25 25-0 21/2 10,-0 120 45.378 Route 9 46 25-0 38 24 2 6350 0 004865 — 10'-0 0.049 46 25-0 2 (See 1,-0 120 45 427 Notes) P0(10'-0) 10'-0 -0 434 47 26-0 38 24 2 0670 0 015869 11'-0 0 175 47 26-0 2 (See 168'-10 120 45168 Notes) E(6-2) 18' 51/2 48 26'-0 38 24 2.1570 0 012894 T(12'-31/2) 187'-31/2 2.415 48 26-0 2 (See 1-0 120 47.583 Notes) 10'-0 0 434 11 25'-0 38 24 2 0670 11'0 0.015869 0 175 P0(10'-0) 48 191 Total(Pt) Route 9 k ©M E P CAD,Inc 411 AutoSPRINK®12 v12 0 29 0 1 9/29/2015 8 22 20AM Page 14 Job Name: UPS Distribution Center Remote Area Number: 1 Date: 9/29/2015 Pipe Information Elev 1 Flow added Fittings 8 Length C Factor Total(Pt) Notes Node 1 K-Factor this step Nominal ID Devices (Foot) Fitting/Device(Equivalent (Foot) (q) Fitting Length) • - Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) (Q) (Foot) (psi) Friction(Pf) to(Pf)and shown as a (Foot) negative value. 24 25-0 2 (See 1'-0 120 45.214 Route 10 Notes) PO(10'-0) 10'-0 -0.434 — 49 26'-0 33.73 2.0670 0 012585 11'-0 0.138 49 26'-0 2 (See 168'-10 120 44.919 Notes) E(6'-2) 18'-5Yz 50 26'-0 33.73 2 1570 0 010226 T(12'-3%)187'-3/z 1.915 50 26'-0 2 (See 1'-0 120 46.834 Notes) 10'-0 0.434 9 25-0 33.73 2.0670 11'0 0.012585 0.138 PO(10'-0) 47.406 Total(Pt) Route 10 23 25-0 2 (See 1'-0 120 44 885 Route 11 Notes) P0(10.-0) 10'-0 -0.434 51 26'-0 33.46 2 0670 0.012399 11'-0 0 136 51 26'-0 2 (See 168'-10 120 44.588 Notes) E(6'-2) 18'-5% 52 26'-0 33.46 2.1570 187'-3Yz 0.010075 1.887 T(12'-3%) 52 26'-0 2 (See 1-0 120 46.475 Notes) 10'-0 0.434 8 25-0 33 46 2.0670 11'0 0.012399 0.136 P0(10'-0) 47.045 I Total(Pt) Route 11 . 22 25-0 2 (See 1'-0 120 44.342 Route 12 Notes) — P0(10'-0) 10'-0 -0.434 53 26'-0 35.11 2.0670 0.013553 — 11'-0 0.149 53 26'-0 2 (See 168'-10 120 44 057 Notes) E(6'-2) 18'-5% 54 26'-0 35.11 2.1570 0.011013 T(12'-3%) 187'-3% 2.063 54 26'-0 2 (See 1,-0 120 46 120 Notes) 10'-0 0 434 7 25-0 35.11 2 0670 11'-0 0.013553 0.149 P0(10.-0) 46 702 Total(Pt) Route 12 21 25-0 2 (See 1,-0 120 43.521 Route 13 Notes) - _ P0(10'-0) 10'-0 • -0.434 55 26'-0 38.93 2 0670 0 016408 11'-0 0.180 ©M.E P CAD,Inc. 411 AutoSPRINK®12 v12 0 29 0 1 9/29/2015 8 22 20AM Page 15 Job Name: UPS Distribution Center Remote Area Number: 1 Date: 9/29/2015 Pipe Information Elev 1 Flow added Fittings& Length C Factor Total(Pt) Notes Node 1 K-Factor this step Nominal ID Devices (Foot) Fitting/Device(Equivalent (Foot) (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) _ Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) (Q)Foot (psi) Friction(Pf) to(Pf)and shown as a (Foot) (Foot) negative value. 55 26-0 2 (See 168'-10 120 43 268 Notes) E(6'-2) 18'-5YP 56 26-0 38 93 2 1570 — 0 013333 T(12'-31/2) 187'-3% 2 497 56 26-0 2 (See 1,-0 120 45.766 Notes) 10'-0 0 434 6 25-0 38 93 2 0670 11' 0 0 016408 0 180 P0(10.-0) 46 380 Total(Pt) Route 13 20 25-0 2 (See 1'-0 120 42 335 Route 14 Notes) P0(10'-0) ' 10'-0 -0 434 57 26-0 45 05 2 0670 0.021491 11,-0 0 236 57 26-0 2 (See 168'-10 120 42137 Notes) E(6'-2) 18'-5%2 58 26-0 45.05 2.1570 0 017463 — T(12'-3%) 187-3% 3 271 - 58 26-0 2 (See 1'-0 120 45.408 Notes) 10'-0 0 434 5 25-0 45.05 2.0670 11'p 0 021491 0.236 PO(10'-0) 46 078 Total(Pt) Route 14 32 25-0 2 (See 1'-0 120 40.730 Route 15 Notes) P0(10'-0) 10'-0 -0.434 59 26-0 ' - 50.70 2.0670 0 026740 — 11'-0 0 294 59 26-0 2 (See 168'-10 120 40 590 Notes) E(6'-2) 16-51/2 60 26-0 50 70 2 1570 187' 3Yz 0 021728 4 070 T(12'-3'/%) 60 26-0 2 (See 1,-0 120 44.660 Notes) 10'-0 0 434 41 25-0 50 70 2 0670 11'0 0 026740 0 294 P0(10.-0) 45.388 Total(Pt) Route 15 33 25-0 2 (See 1,-0 120 41 288 Route 16 Notes) P0(10'-0) 10'-0 -0 434 61 26-0 47 27 2 0670 0 023493 11'-0 0.258 61 26-0 2 (See 168'-10 120 41113 Notes) E(6'-2) 18'-5'/2 62 26-0 47 27 2 1570 - 0 019090 T(12'-3%) 187'-3/2 3.575 k,©M E P CAD,Inc ;in AutoSPRINK®12 v12 0 29 0 1 9/29/2015 8 22 20AM Page 16 Job Name: UPS Distribution Center Rertiote Area Number: 1 Date: 9/29/2015 Pipe Information Elev 1 Flow added Fittings& Length C Factor Total(Pt) Notes Node 1 K-Factor this step Nominal ID Devices (Foot) Fitting/Device(Equivalent (Foot) I (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) (Q) (Foot) (psi) Friction(Pf) to(Pf)and shown as a (Foot) negative value. 62 26-0 2 (See 1'-0 120 44.688 Notes) 10'-0 0.434 40 25-0 47 27 2 0670 11'-0 0 023493 0.258 P0(10'-0) 45 380 Total(Pt) Route 16 34 25-0 2 (See 1'-0 120 41.545 Route 17 Notes) P0(10'-0) - 10'-0 -0 434 63 26-0 45 62 2 0670 0 021998 11'-0 0.242 63 26-0 2 (See 168'-10 120 41.353 Notes) E(6'-2) 18'-5'/2 64 26'-0 45 62 2 1570 0.017875 T(12'-3'/:) 187'-3/: 3 348 64 26-0 ' 2 (See 1'-0 120 44.701 Notes) 10'-0 0.434 39 25-0 45 62 2.0670 0.021998 P0(10.-0) 11'-0 0.242 45.376 Total(Pt) Route 17 17 25'-0 2'% 10'-8 120 39.603 Route 18 31 25-0 63.12 2.6350 0.012297 — 10'-8 0.131 39.735 Total(Pt) Route 18 k,©ivi E.P CAD,Inc y AutoSPRINK®12 v12.0.29.0 1 9/29/2015 8.22.20AM Page 17 Job Name: UPS Distribution Center Rerhote Area Number: 1 Date: 9/29/2015 Equivalent Pipe Lengths of Valves and Fittings(C=120 only) I[C Value Multiplier Actual Inside Diameter 4.87 Value Of C 100 130 140 150 =Factor • Schedule 40 Steel Pipe Inside Diameter Multiplying Factor 0 713 1.16 1 33 1 51 • Fittings Legend • ALV Alarm Valve AnqV Angle Valve b Bushing BaIV Ball Valve BFP Backflow Preventer BV Butterfly Valve C Cross Flow Turn 90° cplg Coupling Cr Cross Run CV Check Valve DeIV Deluge Valve DPV Dry Pipe Valve E 90°Elbow EE 45°Elbow Eel 11W Elbow Eel 22W Elbow f Flow Device fd Flex Drop FDC Fire Department Connection fE 90°FireLock(TM)Elbow fEE 45°FireLock(TM)Elbow flg Flange FN Floating Node fT FireLock(TM)Tee g Gauge GloV Globe Valve GV Gate Valve Ho Hose Hose Hose HV Hose Valve Hyd Hydrant LtE Long Turn Elbow mecT Mechanical Tee Noz Nozzle P1 Pump In P2 Pump Out PIV Post Indicating Valve PO Pipe Outlet PRV Pressure Reducing Valve PrV Pressure Relief Valve red Reducer/Adapter S Supply sCV Swing Check Valve Spr Sprinkler St Strainer T Tee Flow Turn 90° Tr Tee Run U Union WirF Wirsbo WMV Water Meter Valve Z Cap • �A,©M E P CAD,Inc. AutoSPRINK®12 v12 0 29.0 1 9/29/2015 8 22 20AM Page 18