Loading...
Plans (11) FOUNDATION CERTIFICATION LOT 2 OF "SOUTH VIEW HEIGHTS" CITY OF TIGARD, WASHINGTON COUNTY, OREGON � �� 152.12. rt. ii4'4/i 4WI"" N'� P "srzo15.-oet55 - ..- .--\ .-- gyp► goy - -O. 0 o s yd51,���'--- --' 0- 4 ,- . . . V, -,- - . � 0 d IP. Or,c� s '- $. c^ LOT 3 cP O' 9� o 'OG� LOT 2 0. 50 N'% 2.00' *- 5.00' S6CA 2.00' 's. �a 1 s LOT 1 ?o' Li'�. - SCALE 1" = 20 FEET - - 20 0 8.12 18 20 AGO' "`*�C'A G STE = STREET TREE EASEMENT L" \ S�"��'I�_4A OS) OPQ PUE = PUBLIC UTILITY EASEMENT C, ^ s- o`j -2i -15 -.- tt REGISTERED �v PROFESSIONAL I, ROBERT RETTIG, A REGISTERED PROFESSIONAL LAND SURVEYOR IN THE STATE OF OREGON, HEREBY LAN U YOR CERTIFY THAT I HAVE STAKED THE FOUNDATION FOR LOT 2 OF 'SOUTH VIEW HEIGHTS' WITH HUBS AND TACKS. PREPARED FOR SOUTHVIEW HEIGHTS REGO VENTURE PROPERTIES, INC. JANUARY 11, 2005 DRAWN BY:MEBJCHECKED BY:RDRIDWG:3252CSTK IJDB: 3252 AKS ENGINEERING & FORESTRY, LLC AISC ROBERT D. RETTIG 4230 SW GALEWOOD STREET 12965 SW HERMAN RD SUITE 100 60124LS J SURE 100 TUALATIN, OR 97062 www.oks-eng.com RENEWS: 12/31/16 LAKE OSWEGO, OR 97035 PHONE: 503.563.6151 FAX: 503.563.6152 GeoPacific Engineering,lac. Real-World Geotechnical Solutions Investigation • Design• Construction Support September 18, 2015 Project No. 12-2704 Stonebridge Project No. 1839 Stonebridge Homes p/7 S 7-2015- OO 0 S5 4230 SW Galewood St., Ste. 100 Lake Oswego, OR 97035 Fax 503-387-7615 Email Andy(a)stonebridgehomesnw.com; JimD @stonebridgehomesnw.com; kristen(a7dmhholdingsco.corn RE: FOUNDATION EXCAVATION REVIEW SOUTH VIEW SUBDIVISION LOT 2 15212 HARVEY'S VIEW LANE TIGARD, OREGON References: GeoPacific Engineering, Inc., Geotechnical Explorations, Knauss Property Subdivision, 12035 Southwest Beef Bend Road, Washington County, Oregon, report dated August 10, 2012 GeoPacific Engineering Inc. visited the site on yesterday to review the single family home foundation layout on Lot 2. We understand that the proposed building is a two-story home. In our opinion, the observed subgrade is generally adequate for support to an allowable bearing pressure of 1,500 psf. The expected maximum anticipated total and differential footing movements (generally from soil expansion and/or settlement) are 1 inch and 3/4 inch, respectively, over a span of 20 feet. At the time of our site visit, the excavation was nearly complete. The excavation consisted of predominantly medium dense to dense, rocky fill soil that could be probed less than 4 inches with heavy pressure using a steel "T" bar probe. These soils are considered adequate to support the planned foundation loads. Footing-to-slope setbacks were adequate and foundation embedment depths appeared adequate. Some structural backfilling may be required. Due to rocky and silty soils encountered throughout the site, all foundations should incorporate appropriate drainage measures. Crawlspaces should be provided with a low-point drain and pass through pipes should be installed through footings which would otherwise restrict water flow to the low-point drain. Care should be taken to avoid saturation or disturbance of footing subgrade soils during and after excavation. If footing bearing soils become saturated or disturbed, any softened soil or slough should be removed and replaced with crushed aggregate or additional concrete. 14835 SW 72nd Avenue -- --- -_ __,__ _ Portland, Oregon 97224 Tel(503) 598-8445 Fax (503) 941-9281 Project No. 12-2704 South View Lot 2 Our work scope pertains to a geotechnical engineer's foundation excavation review only and the conditions existing and exposed at the time of our site visit. Within the limitations of scope, schedule and budget, GeoPacific attempted to execute these services in accordance with generally accepted professional principles and practices in the fields of geotechnical engineering and engineering geology at the time the report was prepared. No warranty; express or implied, is made. If you have any questions, please call. Sincerely, GEOPACIFIC ENGINEERING, INC. htt��cSts1 14 %`r OREC N '-S D.1M°' EXPIRES:06130/20/2 James D. Imbrie, P.E., G.E Geotechnical Engineer - 2 -