Loading...
Permit y n CITY OF TIGARD t ' ELECTRICAL PERMIT ' '. COMMUNITY DEVELOPMENT tsla3fia Permit#: ELC2015-00695 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 08/27/2015 Parcel: 1S135AB01003 Jurisdiction: TIGARD Site address: 10300 SW GREENBURG RD 205 Project: Conference Center Subdivision: METZGER,TOWN OF Lot: 9 Project Description: New Lighting. 9/1/15,REPRINTED to correct suite number from 205 to 210.9/23/15,REPRINTED to change suite address back to 205. Contractor: WILLAMETTE ELECTRIC INC Owner: LINCOLN CENTER LLC PO BOX 230547 BY SHORENSTEIN PROPERTIES LLC TIGARD, OR 97281 235 MONTGOMERY ST, 16TH FLOOR SAN FRANCISCO, CA 94104 PHONE: 503-624-3631 PHONE: FAX: 503-624-2938 FEES Quantity Description Date Amount 1 crt Branch Circuits wo/Purchase 08/27/2015 $56.18 Specifics: Service or Feeder 1 ea 12%State Surcharge- 08/27/2015 $6.74 Type of Use: COM Electrical Class of Work: ADD 45 Misc Administration Fee 09/02/2015 $45.00 Type of Const: Occupancy Grp: Total $107.92 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENT : •regon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-001 through 0 ' 952-001-0090. You m obtain a copy of the rules or direct questions to OUNC by calling 5.232.1987 or 1.800.332.2344. Issued B —�-t (-�C� Permittee Signature: 6aiT OWNER INSTALLATION ONLY The installation is being made on property I own which is not intended for sale,lease or rent. OWNER'S SIGNATURE Date: CONTRACTOR INSTALLATION ONLY SIGNATURE OF SUPR.ELEC' Date: LICENSE NO. Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection.