Report #.ufZo Li- 000
iii
co 2106 Pacific Avenue,Suite 300
Tacoma,WA 98402
T(253)627-4367
72
September 16,2015
Mr. Eric Evenson
Wal-Mart Construction
Sam M.Walton Development Complex
2001 S. E. 10th Street
Bentonville, Arkansas 72716
Re: Walmart Store#55 Supercenter,7600 SW Dartmouth St,Tigard OR 97223
Outlot Building, SW Dartmouth St,Tigard OR 97223
Outlot Building, 7700 SW Dartmouth St,Tigard OR 97223
Dear Mr. Evenson:
The purpose of this letter is to state to Wal-Mart Stores, Inc.that,to the best of our knowledge,the
construction on the above referenced projects have been completed in substantial conformance with
the approved Contract Documents and with the provisions of the applicable building code.
We performed construction observation visits and functional performance tests as agreed to by the
Owner and as required by our scope of services to verify general conformance of the work.To our
knowledge and our construction observations, no outstanding items exist.
Sincerely,
BCRA Structural Engineering
Wilson Hu, PE,SE Blake Johnson, PE,SE
cc: File
R1jcTp;
f. 'S'S'O
i 340 45 Ir-
j 4OREGON
T gr13
1 4:114 4:114 10.0
XPIRE $ U. .
BCRADESIGN.COM
■
oc_,cC r
�f�f Information
LIe1 M •To Build On
Engineering•Consulting•Testing
September 15,2015
Mr.Eric Evenson
Wal-Mart Stores,Inc.
2001 SE 10th Street
Mail Stop 5570
Bentonville,AR 72716-5570
Subject: Final Summary Report
Retail#2
7500 SW Dartmouth Street,Tigard,OR
PSI Project No.0654138
Dear Mr. Evenson:
Professional Service Industries, Inc. (PSI) is writing this letter to document that, in accordance with Section
1704.1.2 of the State Building Code representative(s) from our firm has performed special inspections during
construction of the limited remodel for the following project:
Permit No: City of Tigard,OR—BUP2012-00069
Project Address: 7500 SW Dartmouth Street,Tigard,OR
Project Description: Retail#2
Our project file(s) indicate that PSI special inspection activities listed below were conducted as scheduled
between June 10,2013 and June 23,2014 for the above referenced project. This letter represents a summary
of work observed and reported by PSI representative(s) and the resolution of any documented non-
compliance.
• Anchors Cast In-place
• Reinforced Concrete
• Structural Steel Welding and Bolting
• Proprietary Anchors
• Structural Masonry
To the best of our knowledge,the special inspections referenced herein were performed by our firm in general
accordance with the requirements, approved plans and specifications, provided change orders that impacted
plans and/or specifications,and applicable workmanship provisions of the State Building Code and Standards.
If you have any questions or we can be of further assistance,please do not hesitate to call.
Sincerely,
Professional Service Industries,Inc.
frAirN■
Deborah Priest,P.E. Joe Morrissey
Project Engineer CS Department Manager
Professional Service Industries,Inc.•6032 N.Cutter Circle,#480•Portland,OR 97217•Phone 503/289-1778•Fax 503/289-1918•CC8#176269