Loading...
Report #.ufZo Li- 000 iii co 2106 Pacific Avenue,Suite 300 Tacoma,WA 98402 T(253)627-4367 72 September 16,2015 Mr. Eric Evenson Wal-Mart Construction Sam M.Walton Development Complex 2001 S. E. 10th Street Bentonville, Arkansas 72716 Re: Walmart Store#55 Supercenter,7600 SW Dartmouth St,Tigard OR 97223 Outlot Building, SW Dartmouth St,Tigard OR 97223 Outlot Building, 7700 SW Dartmouth St,Tigard OR 97223 Dear Mr. Evenson: The purpose of this letter is to state to Wal-Mart Stores, Inc.that,to the best of our knowledge,the construction on the above referenced projects have been completed in substantial conformance with the approved Contract Documents and with the provisions of the applicable building code. We performed construction observation visits and functional performance tests as agreed to by the Owner and as required by our scope of services to verify general conformance of the work.To our knowledge and our construction observations, no outstanding items exist. Sincerely, BCRA Structural Engineering Wilson Hu, PE,SE Blake Johnson, PE,SE cc: File R1jcTp; f. 'S'S'O i 340 45 Ir- j 4OREGON T gr13 1 4:114 4:114 10.0 XPIRE $ U. . BCRADESIGN.COM ■ oc_,cC r �f�f Information LIe1 M •To Build On Engineering•Consulting•Testing September 15,2015 Mr.Eric Evenson Wal-Mart Stores,Inc. 2001 SE 10th Street Mail Stop 5570 Bentonville,AR 72716-5570 Subject: Final Summary Report Retail#2 7500 SW Dartmouth Street,Tigard,OR PSI Project No.0654138 Dear Mr. Evenson: Professional Service Industries, Inc. (PSI) is writing this letter to document that, in accordance with Section 1704.1.2 of the State Building Code representative(s) from our firm has performed special inspections during construction of the limited remodel for the following project: Permit No: City of Tigard,OR—BUP2012-00069 Project Address: 7500 SW Dartmouth Street,Tigard,OR Project Description: Retail#2 Our project file(s) indicate that PSI special inspection activities listed below were conducted as scheduled between June 10,2013 and June 23,2014 for the above referenced project. This letter represents a summary of work observed and reported by PSI representative(s) and the resolution of any documented non- compliance. • Anchors Cast In-place • Reinforced Concrete • Structural Steel Welding and Bolting • Proprietary Anchors • Structural Masonry To the best of our knowledge,the special inspections referenced herein were performed by our firm in general accordance with the requirements, approved plans and specifications, provided change orders that impacted plans and/or specifications,and applicable workmanship provisions of the State Building Code and Standards. If you have any questions or we can be of further assistance,please do not hesitate to call. Sincerely, Professional Service Industries,Inc. frAirN■ Deborah Priest,P.E. Joe Morrissey Project Engineer CS Department Manager Professional Service Industries,Inc.•6032 N.Cutter Circle,#480•Portland,OR 97217•Phone 503/289-1778•Fax 503/289-1918•CC8#176269