Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report
s , , ,, 1 , , . , , , , . . . . N , , • Quality Refrigeration Since 1947 ' ux. t '. Eve? y? f WALK-IN 3 4',,F1- INSTALLATION MANUAL a y n {g f,� <rae ' tl. .,,,,,,,i,.:,,.,,,-;-,.,;$,,,,�:''YI FOR ' .-,'.,,,,,,,..4....,,V4:=,,,,,� f , � " ,",.1 t , ; �KOLD LOCKERM . Y :rt f'y FAST TRAK® t ' ? . 4. r 4. ��1{,s,,E FINELINETnn 4,164,''' g , `,o' r MINI ROOMS 1- 4 *° xs. ENVIRO-LINE -,,,,,r,-t,...,,,, Y 1 1 , r' , c I l a ,,,, t 41 $1,1 n 1.m zit:01.v 'fo tERE0 Nor-Lake, Inc. Registered to ISO 9001:2008 File No. 10001816 ©2013 Nor Lake,Inc 05/13 Rev.E 132617 K.NO The Quality Systems at Nor-Lake, Incorporated have been registered by UL to ISO 9001:2008. Your Nor-Lake Walk-In Cooler (Freezer) was quality engineered and produced under rigid factory controls. It features the very latest in manufacturing technology plus innovative design techniques that will provide the ultimate in user convenience. Please maintain this service-reference material in a handy file for an immediate answer to any questions you may have concerning your Nor-Lake Walk-In. This manual was designed not only to provide guidance during the installation phase, but to serve its owner as a reference source for years to come. It contains information pertaining to the operation of its various components, electrical wiring details, maintenance procedures and adjustment techniques or replacement methods for certain parts. Please take time to read all sections of this manual. You will be rewarded with a better understanding of your equipment and will gain product knowledge that will assist you in obtaining the performance that you should expect from your Nor-Lake Walk-In. Sincerely, NOR-LAKE, INCORPORATED Chuck Dullea President ANY CORRESPONDENCE PERTAINING TO THIS EQUIPMENT MUST CONTAIN THE MODEL NUMBER OR JOB NUMBER AND THE SERIAL NUMBER AS THEY APPEAR ON THE DATA PLATE LOCATED ON THE INSIDE OF THE DOOR SECTION. NOR-LAKE, INC. 727 Second Street P.O. Box 248 Hudson, WI 54016 800-955-5253 Sales 715-386-2323 800-388-5253 Parts/Service Fax: 715-386-6149 www.norlake.com 2013 Nor-Lake,Inc 05/13 Rev.E 132617 �NORL \KE� PRODUCT SAFETY POLICY OF NOR-LAKE, INC. We strive to provide those who buy and/or use our product with equipment which is: 1. Developed by applying professional engineering principles in product research, development and user safety. 2. Designed to comply with or exceed industry performance and safety regulations. 3. Thoroughly reviewed and professionally tested for function, reliability and product safety. 4. Manufactured according to our professional purchasing, production and quality control standards designed to assure continued product reliability and safety. 5. Represented in our advertising and/or product literature in an informational and factual manner created to aid our customer in their product selection. 6. Accompanied by clear, complete installation, operation and maintenance instructions designed to assure many years of satisfactory product performance. 7. It is only through you, our satisfied customer, that we can continue our past successes in the design, development and manufacture of refrigeration equipment. 8. Nor-Lake, Incorporated reserves the right to improve upon our products without notice and without imposing on ourselves, any obligation to make such changes on products previously manufactured. NOR-LAKE, INC. 727 Second Street P.O. Box 248 Hudson, WI 54016 800-955-5253 Sales 715-386-2323 800-388-5253 Parts/Service Fax: 715-386-6149 www.norlake.com 411110 ©2013 Nor-Lake,Inc 05/13 Rev.E 132617 TOOLS REQUIRED QNORAK_ TOOLS REQUIRED FOR UNCRATING AND INSTALLATION OF YOUR NOR-LAKE WALK-IN CD: © TJ R IAA (i1.0 -31 I " I) • LEVEL • CAULK GUN • TAPE MEASURE • SAFETY GLASSES • HAMMER • METAL SNIPS • PRY BAR • PHILLIPS SCREWDRIVER • ALLEN WRENCH • UTILITY KNIFE • SQUARE • DRILL DRIVER ®2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN INSTALLATION GENERAL INFORMATION �N RLAKE� WALK-IN INSTALLATION General Information This walk-in cooler or freezer was produced utilizing the latest in manufacturing technology, the highest quality materials available, along with innovations that make it a distinctive product in its field. Despite , ry rigid controls in the production of the product, there is no substitute for thoroughly reading and UNDERSTANDING the instructions that follow. The result will be an orderly and efficient installation. Take the time to follow the steps explicitly! NOTE: The most important step is to start y=`� with a level surface. k / NOTE: Indoor walk-in(s) must be in an environmentally controlled space. Relative humidity should be kept between 30% - 60%, maintaining a dew point of 50°F or less. ,° 1 yy k UNPACKING/INSPECTION Check the Delivery Receipt for the number of pieces that made up the Delivery Receipt shipment and make sure that the number of pallets, boxes or crates agrees with that number. Each piece should be clearly marked with the same five- digit order number that appears on the Delivery Receipt as the shipper's number. Each individual walk-in is color coded. Examine the general condition of the shipment and, as soon as unpacking is completed, carefully inspect all parts for possible shipping damage. If damaged parts are discovered, contact Nor-Lake immediately. x F' .per* �ri ��,��� �,,`' � x ar >'k`gab +�" '•� � _.„ , Kold LockerTM Walk-in with Ceiling Mount Kold LockerTM Walk-in with Remote Capsule Capsule Pak TM Refrigeration System PakTM Refrigeration System ©2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN INSTALLATION GENERAL INFORMATION _N___9- 1__P\K_E___ M.•••• 41 1i614 11•••• 1(11+• rrh r n11•F w t• Pr �e+s P' c. u(v o •FSf c+ 1H1• (t(1r0 ° tlt(4 ••• {rf li1.Kltwt K rllt• •411S•11 .0166•••16 H•41f1 1'• •11'P41.K(1 CIS MI r F 044.1.1444E6•• F. r'' •rilt• • •r•el ( •t• 1fH•t (•K[1 0/It f(' 1fMf1 t 1111 41.114 WM .. ,.S(JI•(1, t •((c(1, :� Mf11K-1 ca▪ rs( e.a((e..fe•1. , r. Packing List • Locate packing list and use as reference during uncrating. 0 1/ 1 - t.}':} • Remove protective packaging and locate hardware bag. r t • The hardware bag also contains accessory parts for this walk- "p.- '� ` ;• in together with an erection diagram, a layout of the screed ' iV-' '- assembly for floorless walk-ins, and a detailed packing list of _ all parts furnished for this individual walk-in. All parts should be iC' r°•�-:. 1 ;E n; compared to the packing list. If discrepancies are found, contact Nor-Lake immediately. a Some walk-ins come with an additional orange hardware box. ,r- ...-. * i 4, 4 0 2013 Nor-Lake,Inc 05/13 Rev.E 132617 FOAM PANEL STORAGE NO(�LA� FOAM PANEL STORAGE If foam walk-in panels require storage at the job site prior to installation, the following steps must be taken to protect the panels against both staining from moisture and sunlight, and denting by workers and traffic. Whenever possible, the panels should be stored indoors, and should remain in the crating pallet they were originally shipped in. If the panels were uncrated as they were unloaded from the delivery truck, and they are being stored indoors, they should be stored vertically on skids with spacers between the panels. When storing panels in a vertical position, always place the female rail (grooved) edge down (see illustration below.) This method of storing panels will provide proper ventilation, permit drain-off of condensation moisture and protect panels against the formation of white rust stains. If the panels must be stored outdoors, follow the same procedure as indicated for indoor storage WITH THIS ADDITION: Cover the panels completely with an opaque polyethylene water-proof material to protect against rain, snow, heat and sunlight. The illustration below shows the method for storage outdoors when panels are not left in palletized crates. Note: Nor-Lake always recommends equipment to be installed once received but understands storage may be required. Nor-Lake does not guarantee issues related to storage, such as handling damage, storage damage, panel aging, etc. We would recommend the locks be oiled and the panels be wiped down with a white oil. - OPAQUE POLYETHYLENE WRAPPING ---- - •- MUST NOT TOUCH GROUND SO + '- , ---- ' THAT AIR CAN CIRCULATE '%r FREELY AROUND PANELS c:" •,'/ . I./ 4 PANELS STACKED VERITCALLY WITH SPACERS BETWEEN PANELS ©2013 Nor-Lake,Inc 05113 Rev. E 132617 ERECTION DIAGRAM Y ___I __10--V\K_E ERECTION DIAGRAM The erection diagram, as furnished with each walk-in, is a detailed plan that illustrates the placement of every wall, corner, ceiling and floor panel that comprises a complete, individual walk-in. The erection diagram for all installations clearly shows the i V , `, 4, direction of the male and female formed profile of every wall - 0-.,4 Clay panel and every corner panel. I ": .. II. ■::7Ef TL.i[C:_EE':i i ;+r KU 13.i Eu IESE Mail L it∎ aE_'i it _..... ling 01039 COS _ 0115119,1 F-:,1„. Obi = tl�y .Om W V ti 1 CTlI.1N O N +N REVISED 10335;60 REVISED 2'25/(JR; REVISED'7,19 Oft Erection Diagram ( WALK-IN PA EL BUOMI Wa.i..�hARACiVIVA All sections used to construct your walk-in are marked with ' "•"" :A,N� u�..raer.et laaculobes wa., a specific part number on the section, corresponding with its ......,..T =„ m ,, is location on the erection diagram. INSULATED PANEL ,,-., K,,;,,, NOR UAAE. � PAC.JCRT&SOTUaI Vi EARf. If the walk-in is floorless, then a diagram showing the vinyl 'R as=y' -, '.4';',',I=,",',', i7t1 AF:ACt•t;,r.++uuw� %, screed (floor sealer) arrangement is provided. Nor-ate PARt.M ;-/'4 thr h+npV4 F3 KY�(E26,1,1C ,,t AHi h�a PEEYn AR l'Cf1 3 The vinyl screed combines the capability of retaining the wall ' �" , , panels in place while providing the inner and outer cove at the if , I , , „ junction of the walls and the building floor (a requirement of Standard No. 7 of the National Sanitation Foundation • Nor-Lake Inspection Label and panel (NSF). specific part number. IMPORTANT! Do not attempt to erect a floorless walk-in FREEZER on an existing building floor that has not been specially prepared and adequately insulated for below freezing storage temperatures! 6 ®2013 Nor-Lake,Inc 05/13 Rev.E 132617 SECTION LATCHES �O�LAKE� SECTION LATCHES • �t r; - All wall, corner, ceiling and floor panels are joined and locked together by the mechanical action of section latches which are integrally foamed into the panels near the perimeter edges. A section latch consists of two halves — a lock housing which contains a cam actuated locking arm, or hook, and a strike housing which — �.,- • - contains the engagement pin. Both housing halves are securely anchored in the - foam core of the panel. The lock housing is always located in the male-formed 4 edge and the strike housing will be found in the female-formed edge of the panel. r! t TO OPERATE LATCHES 1,- • Fully extended cam lock x i 1 ..5.r r1 r . a setii 4. F•1 '4 r1. ,t Y r, r' w 1 ' M T r '< Hex wrench provided in hardware bag , r ; - . . a I, . . . ...., • . :., :i:::.Y • . . . ..; . , I 111- t, _. 1. Insert the hex wrench 2. Push the sections 3. Continue turning the (packed in the hardware tightly together and turn wrench to a full stop bag) through the access the wrench 1/4 turn in a (approximately 3/4 of a hole in the interior clockwise direction. This complete turn from the panel metal into the hex will engage the locking unlatched position) to opening of the section arm (hook) over the pin in complete the locking latch. Turn wrench in the strike housing. operation. a counterclockwise direction to ensure that the lock is fully unlatched .,'' a{; Latches on some panels a�e.,,+jf. , e: r? will have to be turned . r' - /, ,�=(.:•,r counterclockwise to , y""44 _y ;:i=; activate the locking cam. �,∎-' �_ 'I. `'' "' '∎ f These latches will be `-- C:a. rr;f t-"• designated by a "TURN" K.; - sticker. A!'.'ti4 ... • 1:,71`.:. I OM .c 2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN INSTALLATION - SITE SELECTION, BASE PREPARATION NO-LAKE SITE SELECTION, BASE PREPARATION & LEVELING THE FLOOR WALK-IN COOLER OR FREEZER WITH A FLOOR One of the most important considerations in the erection of a walk-in cooler or freezer is the building floor or the surface upon which the walk-in will rest. As with any structure, a firm and level foundation is essential to achieve a perfect end result. If the surface is not perfectly level and smooth, appropriate steps must be taken to provide the proper base. The positive action of self-closing doors, proper door gasket seal and condensate removal all depend directly upon the level and plumb installation of .+ all panels. '`` V ` mimmummr If the walk-in is to be installed next to an existing building wall(s), make sure that a MINIMUM OF 2" REMAINS BETWEEN THE WALK-IN AND THE BUILDING WALL(S) to allow for irregularities of the building wall(s) and to permit a free flow of air between the two surfaces. , NOTE: Indoor walk-in(s) must be in an environmentally controlled space. Relative humidity should be kept between 30% - 60%, maintaining a dew point of 50°F or less. I` In some cases,the surface upon which the walk-in is to be installed was especially prepared for installation and it is perfectly level and smooth. The walk-in floor, in this case, may be installed without - further preparation. Before beginning, however, an appropriate vapor barrier should be placed over the surface that the walk-in will occupy. Asphalt felt paper (50#) or a 6 mil polyethylene film, 4 are suggested materials. These are provided by the installing ;. 01,Y. contractor. 8 ©2013 Nor-Lake,Inc 05/13 Rev.E 132617 FLOOR INSTALLATION (SHIM LEVELING METHOD) _NORLAK_E_ FLOOR INSTALLATION (Shim Leveling Method) For walk-ins subject to light to moderate loads Locate the highest point within the perimeter lines. A transit or surveyor's level or rotary laser level is an ideal instrument to use for locating this point. When the highest point is located, mark it directly on the floor and refer to the erection diagram to determine where the high point is located with respect to the walk- in floor plan. '. 4,' ... One of the most important procedures that will be encountered in rt'' • the erection of a walk-in with a floor is LEVELING THE FLOOR. `w• , It must be PERFECTLY LEVEL! If it is not, the wall panel will follow the irregularities of the walk-in floor which will directly affect Ie f subsequent procedures such as latching, panel gasket seal, ceiling panel assembly among others. Using the erection diagram as a guide, select the floor panel that will be located directly over the highest point and place it in that position while observing the drawn outline on the building floor. After the first floor , y ., ,. panel is positioned, " 4 ; it must be properly - ,, ;. .. leveled. To achieve "" this,shimming material of varying thicknesses :` 2 ....„- must be used. Cedar building shingles are =. . ?- ? 49 ideally suited for this ^,_ - procedure. IMPORTANT! EVERY FLOOR PANEL MUST BE SUPPORTED ON ALL FOUR SIDES AND THE ENTIRE :' .., UNDERSIDE, AT ,,. ° " } LEAST EVERY 12 �-• A `, BY EITHER THE 4 0 ,,. BUILDING FLOOR ;.- OR BY SHIMMING. ;: .< ::;,,,, :`: HOWEVER, OTHER `f ' "'" . MATERIALS THAT ARE RESISTANT TO ROTTING OR COMPRESSION ARE ALSO ACCEPTABLE. After the first floor panel has been leveled perfectly, trim away the excess shim material so that none projects from the panel at any of the four edges. From the erection diagram, determine which floor panel will be installed next and where it will be situated on the floor plan. Prepare shimming material for the second panel at each point where shimming material was used beneath the first floor panel. The shimming material thickness must be such that it will support the second floor panel at exactly the same height as the first panel along the entire length of the joint. NOTE: In many cases, the shimming material will be the same thickness as the adjacent shimming under the first panel. 9 ©2013 Nor-Lake,Inc 05/13 Rev.E 132617 FLOOR INSTALLATION (SHIM LEVELING METHOD) Place the second panel in position next to the first floor panel but DO NOT LOCK! Shim the second panel,where necessary, using the same procedure as was used on the first panel. When all four edges of the second floor panel are properly shimmed, lock the two panels securely ' together. Using the same technique for leveling, check the levelness of the two sections in all directions by placing the level across the I joint at several points and again, check the levelness of the floor `a 11 panels in the direction of the panel joint. Refer to the erection diagram and install the remainder of the floor panels using the same procedure as was used for the first and second floor panels. When all of the floor panels are installed and leveled perfectly, check the section latches for full and complete Trim excess vapor barrier. ft +r 10 ©2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN INSTALLATION - SITE SELECTION, BASE PREPARATION Q■ SITE SELECTION, BASE PREPARATION WALK-IN COOLER WITHOUT A FLOOR INSTALLED ON 1" VINYL SCREED IMPORTANT! Do not attempt to erect a floorless walk-in FREEZER on a existing building floor that has not been specially prepared and adequately insulated for below freezing storage temperatures. To install a vinyl screed assembly on an existing floor, proceed as follows: Locate the screed (floor sealer) diagram which was packed in the hardware box and, using it as a guide, draw an outline of the outside dimensions of the installed screed directly onto the building floor where the walk-in will be situated. These dimensions will be 1 1/2" larger than the overall dimensions of the walk-in in both directions. If the walk-in is to be installed next to an existing building wall(s), make sure that a MINIMUM OF 2" REMAINS BETWEEN THE DRAWN OUTLINE AND THE BUILDING WALL (s) to allow for irregularities of the building wall (s) and to permit a free flow of air between the two surfaces. CAREFULLY CHECK FOR SQUARENESS by insisting that the two dimensions between opposite corners are equal (Figure 1). One of the most important procedures that will be encountered in the base preparation is LEVELING THE SCREED. It must be PERFECTLY LEVEL! If it is not, the wall panels will follow the irregularities of the building floor which will directly affect subsequent procedures such as panel latching, panel gasket seal, ceiling panel assembly and others. After the outline of the screed assembly is completed, locate the highest point within the outline on the floor where the screed will be installed. Screed sections are 5 1/2" wide. A transit or surveyor's level is an ideal instrument for this purpose. Mark the highest point on the floor(Figure 2) and, referring to the screed diagram, identify and locate the appropriate screed section and position it directly over the highest point. 1"VINYL SEALER EXISTING WALL 2'MINIMUM EXISTING WALL EXACT DIMENSIONS OF SCREED ASSEMBLY (REFER TO SCREED DIAGRAM) .x. x I I NOTE: DIMENSIONS"X-X" MUST BE EOUALI 2'MINIMUM --rj/ 5 1/2" Figure 1 ®2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN INSTALLATION - SITE SELECTION, BASE PREPARATION N0LAJ > Note: All sealers lettered 8-1 12 alike are _ ..___ interchangeable.' IQIIMIMNIIIMINNIIEIif OVERALL SCREED WIDTH THAT EXISTING WALL CONTACTS THE FLOOR IS 5 12" EXISTING WALL 2"MINIMUM r —� \ 5 vz° / \ Sealers may also be / \ EXACT DIMENSIONS / OF SCREED ASSEMBLY numbered by part / (REFER TO SCREED number DIAGRAM) L A / \ (Screed Diagram) 1 f✓ HIGHEST POINT \\ / _(EXAMPLE ONLY \ ..------ HIGHEST POINT —°/ — (EXAMPLE ONLY 1-4--2"MINIMUM 1 39 12" O_ ilWelailitt Note. Corners are shipped in two pieces. Figure 2 Installer to silicone together during the installation /L-.. —I\ <' LEVEL \! LEVEL TIHOSE SHOULDERS IN BOTH DIRECTIONS `\....l: \ L-11 \ \'I \\\,A \ 'a r ,°'llla ■ tit, \ SHIMMING MATERIAL Figure 3 After the first screed section is positioned, it must be LEVELED PERFECTLY not only over its length but, across its width, as well. To achieve this, shimming material will probably be required. Vinyl floor - tile is ideally suited for this purpose. However, other materials that are resistant to rotting or compression are acceptable. IMPORTANT! EVERY SECTION OF SCREED MUST BE SUPPORTED AT LEAST EVERY 12" BY EITHER THE BUILDING FLOOR OR BY SHIMMING (Figure 3). Assuming that the first screed section has been perfectly leveled, refer to the screed diagram and select an adjoining screed section and level it perfectly in both directions, shimming wherever necessary. Continue leveling the remainder of the screed sections until the entire assembly is in position. Check the assembly to make sure that the outer edges are located exactly on the drawn outline on the building floor. 0 2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN INSTALLATION - SITE SELECTION, BASE PREPARATION KNORLAK> When the entire screed assembly is leveled and supported by shimming, as required, CAREFULLY AND WITHOUT DISTURBING THE SHIMMING MATERIAL, lift the screed sections, tip them upside-down and apply a heavy bead of construction sealant to the bottom of the screed section along both of the edges that contact the building floor surface. The diameter of the sealant bead should be larger than the thickest shimming material to ensure a complete, air-tight seal along the entire length of the screed (Figure 4). NSF approved sealant is provided and will be found in the hardware box. Immediately after applying the construction sealant to a screed section, replace the screed section to its original location on the building floor WITHOUT DISTURBING THE SHIMMING MATERIAL and place a sealer splice every joint in the screed assembly (Figure 4). Since the sealer splice is intended to keep adjacent screed sections in alignment, approximately one-half of the sealer splice should lap each section. It need not be fastened in place (Figure 4). NOTE: Seal all screed joints with sealant. Make a final check for squareness, levelness and whether the screed assembly is located properly with respect to the drawn outline on the building floor. Follow by securing the screed assembly to the building floor with fasteners that are appropriate for the building floor. These fasteners are not provided and must be obtained by others. Fasteners should be applied down the center line of the inside of the screed at intervals of approximately 36"; however,where shimming is used,apply the fasteners through the shimming material, NOT BETWEEN the shimming. When the entire assembly is secured in position, trim away all excess construction sealant and shimming on both edges of the screed. Trim flush with the sealant lip of the screed and touch up any areas where the construction sealant is not making a perfect seal (Figure 4). NOTE: In the event that the building floor was specially prepared for the installation and no low or high points are detectable, it is possible that no shimming will be necessary. It will then only be necessary to apply construction sealant to the bottom of the screed and secure the screed directly to the building floor. The entire procedure, as described, must be followed explicitly, however, except for the details that pertain to the shimming. / SEALER SPLICE // AT EACH JOINT 1 TRIM S SHIMMING MATERIAL IAL FLUSH USH H WITH J \\l 1 EDGE OF SCREED TRIM SEALEANT FLUSH WITH EDGE OF SCREED 411110 ®2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN INSTALLATION - SITE SELECTION, BASE PREPARATION • c NOR AK> TAPE z V. o 114 ...44. / uw.- ...... / G _1./ SHIMMING MATERIAL SEALANT Figure 5 ALTERNATE SHIMMING METHOD FOR 1" VINYL SCREED If the surface that the vinyl screed will occupy is level, except for an occasional low point, the screed may be secured directly to the building floor and compensation for the low points may be achieved by shimming the support shoulders on the inside of the screed. When employing this method, the low points should be marked on the building floor in the vicinity of the drawn outline for reference. After the screed has been sealed and secured, leveling may proceed with special attention being focused in the areas marked as being low points. Vinyl floor tile is often chosen as shimming material and strips (5/8" wide maximum) are cut and placed on top the supporting shoulders of the screed to provide a level surface for the wall sections to rest upon. Strips of tape should be applied to hold the shimming material in place (Figure 5). IMPORTANT! Shimming the support shoulders on the inside of the screed is ideally suited for minor irregularities on the building floor and has the advantage of complete screed-to-floor contact over the entire perimeter of the assembly. IT IS NOT RECOMMENDED, HOWEVER, FOR EXTREMELY IRREGULAR BUILDING FLOORS. Excessively thick shimming material on the support shoulders may elevate the wall panels to a point where the effectiveness of the uppermost screed sealing flanges would be compromised. Shimming thickness of more than 3/4" should be avoided! If shimming the support shoulders of the screed is selected, the entire procedure, as described, must be followed explicitly to ensure squareness and levelness over the entire screed assembly. 14 ©2013 Nor-Lake,Inc 05/13 Rev. E 132617 i WALK-IN INSTALLATION - SITE SELECTION, BASE PREPARATION c ORLAK� SITE SELECTION, BASE PREPARATION WALK-IN COOLER OR FREEZER WITHOUT A FLOOR INSTALLED ON FOAMED SEALERS IMPORTANT! Do not attempt to erect a floorless walk-in FREEZER on an existing building floor that has not been specially prepared and adequately insulated for below freezing storage temperatures. To install a foamed sealer (screed) assembly on an existing floor, or on a properly prepared floor for freezers, proceed as follows: Locate the floor sealer (screed) diagram that was packed in the hardware box and, using it as a guide, draw an outline dimensions of the installed sealer(screed) assembly directly onto the building floor precisely where the walk-in will be situated. These lines will be exactly the same dimensions as the dimensions of the walk-in in both directions. If the walk-in is to be installed next to an existing building wall(s), make sure that a MINIMUM OF 2" REMAINS BETWEEN THE DRAWN OUTLINE AND THE BUILDING WALL(S). This space will allow for irregularities in the building wall(s) and will permit a free flow air between the two surfaces. CAREFULLY CHECK FOR SQUARENESS by insisting that the dimensions between opposite corners are equal (Fig. 1). Since the foamed sealer (screed) is retained in position by a 3/8" thick plywood sealer guide, which will be secured to the building floor, it is imperative that the sealer guide be accurately located, as well, on the building floor. Refer to the sealer guide diagram which was also packed in the hardware box. On the diagram, you will notice that the sealer guide is located 78" INSIDE the drawn outline which represents the outside dimensions of the sealer (screed) assembly. Further, Fig. 1 illustrates that the sealer guide is 2 1/4" wide centered beneath a 4" wide sealer leaving a border of 7/8" along each edge. Draw another outline of the outside dimensions of the sealer guide directly onto the floor. There should be exactly 7/8" between the new sealer guide outline and the previously drawn sealer (screed) outline (Fig. 2). vEUAE:rRtKE EXISTING WALL 2"MINIMUM EXISTING WALL \ EXACT DIMENSION$ OF FOA■EO SEALER ASSEb18LY(tSCkEE0) g( FEgTOgsuER 01AGNAY! NOTE:DINCNSIONE MUST.EMAW 61� / eEUEn GunE —�j4—2"MINIMUM I' Figure 1 411110 ®2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN INSTALLATION - SITE SELECTION, BASE PREPARATION ..N. ORLAI'<_ OUTSIDE ORENNON Of FOAMED SEALER(SCREED!ASSE SLY IX 1T$G WALL _ ro i r•2'MINIMUM w 1E: I EXISTING WALL -V SEALER WIDE © EXACT DENSIONS ISOUDtXESI IM OF FOAMED SEALER /._ AESEMMLY(SCREEO) OIREFER TO SSEEALEA DOTTED IRE(REPRESENT AGMM LOCATION OF FOAMED SEALER OU.:.. r ISL:IIUDASSEMSLY3 y SE• T .r -X' ME/0,,,,I. % L• IN FROM ORAN, OUTLINE Z Zs NOT['OIMLMEIOME'E.x' O .. MEET N EQUAL, 11 / 7 .--2'MINIMUM E _ f.--Poi---.1 OUTLINE OF FOAMED SEALER AND SEAL rX cuing t'S- • 'Newsome DIAGRAM Figure 2 I '.o.. 1 I I I ' D ) I I S I ) I I A �' I I I OVERALL SCREED WIDTH THAT ,� CONTACTS THE FLOOR IS 4" __- _.P•, 4" 2'MINIMUM -- EXISTING WALL ir-- ,----V ___ / \ SCEDEAE _ LATCHES OF SECTION \ OF SCREED SCREED c/ \ DIAGRAM) / \ E / \ -2 / \ / HIGHEST POINT \ --- (EXAMPLE ONLY) \ / \ HIGHEST POINT _- t..- J *A-(EXAMPLE ONLY) -Pd.-2"MINIMUM I I I.--39'6" I _v ' I ® ECM I I I I FOAMED SEALER(SCREED)DIAGRAM Figure 3 One of the most important procedures that will be the screed (sealer)will be installed. (Sealer sections - encountered in the base preparation is LEVELING are 4" wide). A transit or surveryor's level is an ideal THE SEALER (SCREED). It must be PERFECTLY instrument for this purpose. Mark the highest point LEVEL! If it is not, the wall panels will follow on the floor as illustrated on Figure 3. the irregularities of the building floor which will directly affect subsequent procedures such as panel latching, panel gasket seal, ceiling panel assembly and other. After the outline of the sealer(screed)and the sealer guide is completed, as shown in Figure 2, locate the highest point within the outline on the floor where 16 ©2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN INSTALLATION - SITE SELECTION, BASE PREPARATION • STRIKE HOUSING LEVEL ./ /any// /- / NSF APPROYEW / SEALANT FeMALE-FO*MEO ENO --�► �,� f fl 10 1° / SHIMMING SEALER Gum SNOMINNO.LEVELING ANa SEALING ALL FOAMED SEALERS(8CREE% Figure 4 SEALER GUIDE INSTALLATION When all sealer guides are in position, make a final CHECK FOR SQUARENESS and secure Locate the SEALER GUIDES. They are bundled them to the building floor with fasteners that are together and packed along with the walk-in corner appropriate for the surface. NOTE: This can either or wall panels and are labeled accordingly. Sealer be a mechanical fastener or construction grade guides are strips of 3/8" plywood 2 1/4" wide as adhesive. If the sealer guide is positioned over shown in Figure 1. a polystyrene or polyurethane thermal breaker, a Refer to the SEALER GUIDE DIAGRAM. Select compatible construction adhesive may be used. the proper sealer guides and position them as FOAMED SEALER (Screed) INSTALLATION shown by the circled letters on the diagram. Each length of sealer guide is marked with a circled Refer to the FOAMED SEALER DIAGRAM. letter that corresponds to the circled letters on the Identify and locate the sealer section that will be sealer guide diagram. positioned directly over the highest point which was determined earlier and marked on the building Each sealer guide, when positioned properly, will floor (Figure 3). have its outer edge precisely over the INSIDE OUTLINE drawn on the building floor, Figure 2, NOTE: All foamed sealers are male-formed on and its outer edge will be exactly 7/8" from the one end and female formed on the opposite end. outline which represents the foamed sealer outer The configuration of the ends is clearly indicated edge. The quality of workmanship performed in on the diagram. Also, make certain that the strike locating and securing the sealer guides will be housing portion of the section latches is visible on transmitted directly to the location of the foamed the upper edge of the sealer when it is in position sealers (screeds) and, subsequently, to the overall (see Figure 1 and Figure 2). erection of the complete walk-in. BE EXACT! Refer to Figure 1 and Figure 2. ®2013 Nor-Lake,Inc 05/13 Rev.E 132617 J WALK-IN INSTALLATION - SITE SELECTION, BASE PREPARATION cORLAK_E9 411101111K" 11110111* . SECTION GASKET F\\\\ • SEALANT• ♦ � SHIMMING ROHN REQUIRED) ANO HIGHER • • \ \\\ \ WM CARINA awn ALGRINEINT R{ rutitnONa?"2 11 IOCR RIO U► \ ♦ TIMT SMKOT EN,I.nr[NGf • \ AWSWIlf Figure 5 After the first sealer (screed) section is positioned over the sealer guide and over the highest point, it must be LEVELED PERFECTLY not only over its length but, across its width, as well. to achieve this, shimming material will probably be required. Vinyl floor tile cut in strips 7/8" wide by 6" long make ideal shimming strips that can be placed beneath the sealer, wherever necessary, to achieve levelness. IMPORTANT: EVERY SECTION OF SEALER (SCREED) MUST BE SUPPORTED AT LEAST EVERY 24" BY EITHER THE BUILDING FLOOR OR BY SHIMMING. Avoid using shimming strips less that 6" long whenever possible (see Figure 4). Assuming that the first sealer (screed) section has been perfectly leveled, refer to the sealer diagram and select an adjoining sealer section and level it perfectly in both directions, shimming wherever necessary. NOTE: Sealer (screed) sections 8" high or more employ section latches for end-to-end locking. CAREFULLY flush the upper edges and the inner or outer surfaces of adjoining sealer sections while locking them together (Figure 5). Continue leveling the remainder of the sealer sections until the entire assembly is in position. When the entire sealer assembly is leveled, apply NSF approved sealant to achieve a vapor seal - between the bottom edge of the sealer and the building floor. This sealant is provided and is packed in the hardware box. The sealant must be applied to the inner and outer surfaces of the sealer (screed) assembly. Make certain that the sealant produces a complete, air-tight seal, without gaps, and that special care is taken to seal the shimming material appropriately. After the sealant has had an opportunity to set up, trim away all excess material flush with the edges of the sealer (screed) assembly and touch up any areas where the sealant is not making a perfect seal (Figure 5.). 18 m 2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN INSTALLATION -WALL & CEILING PANEL ERECTION K O-LAK> WALK-IN INSTALLATION Wall & Ceiling Panel Erection The installation instructions that follow apply to any walk-in cooler or freezer where the wall panels are supported either by foamed walk-in floor panels or by a floor sealer (screed) assembly which has been accurately located and properly leveled. NOTE: The procedure for erecting wall and ceiling panels will be identical in all cases. NOTE: The walls do not lock to vinyl sealers, but will lock to foam sealers when III - . I used. To aid in the erection process,the floor plan furnished with your walk-in has part numbers listed for each wall, corner, ceiling and floor section. Match the part number on the floor plan to the label on the interior of i I each panel to determine the current placement for each panel. ,7 MOM 7111001111.11~41 =VCR!4 IYY MML ON TM1 KY CI-= fT S .I��rr:14 w 2.7 N .a S f 1 ..'y4 V;WV ' z -__ ' ' LY/q 741�'� g bi! .=vow cn.a _ it --""'"-n__ i t . L.6 7 p„ a„ Select the first panel to be installed, Dam WWI was( normally begin with a CORNER PANEL. REMED„9: Notice that the panel is labeled "Top" along with a part number indicating that when the panel is in its proper position, Notice,also, that the section latch access holes on the vertical edge of the labeled end will be up. the panel are always on the interior of the panel. Position the corner panel in the -.171 I proper location on the walk-in J floor or vinyl screed assembly ,,`; : and IF THE WALK-IN HAS A '" • FLOOR, flush the corner panel with the corner of the floor panel boo in both directions and lock it - securely to the floor panel. y rs. y • 0 2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN INSTALLATION -WALL & CEILING PANEL ERECTION o.LAK__E___ If the first corner panel is supported by a 1"vinyl r sealer (screed), seek assistance to support the 4 corner panel in a vertical position until succeeding I .I wall panels are installed. Wall and corner panels ''. do not lock to the vinyl sealer (screed). �t,r �' Select the next panel as indicated on the floor ,• ,/ plan and position it on the floor or sealer(screed) t close enough to the first panel installed so that t` r `_ section latch engagement is possible. Iµ' :. 1 ,. ' . Making sure that the two panels are perfectly — - - . aligned at the TOP EDGE and that the VERTICAL JOINT of the two panels are perfectly flush, turn nx,, k Id;,�, ,. tit the section latches on the vertical edge of the panel until they are completely k'.," ,t ,. � q � w"' t engaged. V� �� FA IMPORTANT! Insist that the top edges of the adjoining panels are aligned , 1. ke +" ':r.'t`'`' e: perfectly. inn.- 1 3 If misalignment is encountered, merely lift the lowest panel edge while Correct locking to achieve alignment and, when all latches are engaged, permit the locked panels to resume their normal position on the walk-in floor or sealer ,4,,1 ,c°, �,» (screed). `.� : ,f �,.a ife �• i�,.� y*,. nom..,j� #� DO NOT SHORT-CUT! TAKE ENOUGH TIME TO PROPERLY ALIGN ALL SECTIONS. Misalignment 20 c 2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN INSTALLATION -WALL & CEILING PANEL ERECTION __1ORL ■KE__ As each wall panel or corner panel is erected and locked in an adjoining panel along the vertical joint, engage the section latches to I the floor panels by turning the hex locking wrench ONLY ABOUT 1/4 "n TURN CLOCKWISE. No 4 fib�..�, . T Make certain that the wall or corner panel is perfectly aligned with the �I „t'; floor panel or foamed sealer before engaging the section latches. It. a .: wig T'� MINIM 1 er ii , . a • • 'All .u:� Continue erecting panels according to the part numbers shown on the floor plan, and follow, explicitly, the technique described for panel i alignment. s �' CEILING PANELS will be erected at y'4 t.,specific intervals to facilitate the t;'• , installation. The intermittent ceiling d' ' - . . .. !, ' panel erection is scheduled to allow the ceiling panels to serve as supporting ties between opposite walls as the a installation progresses. CAUTION! DO NOT SLIDE CEILING PANELS INTO POSITION! To avoid gasket damage, - elevate the ceiling section clear of the wall section while bringing it into position. ? ! When adjoining ceiling panels are in position, adjust the exterior edges so that they are perfectly flush with one another and with the ti wall panels directly below them. Lock the 9 •„!,•.!•.2..'! f;, "°`"""" • ceiling panels securely to each other. DO NO r., LOCK ceiling panels to wall panels at this time. —..n•-- - NOTE: If local conditions, such as existing ■� building walls, make it difficult to align ceiling •... panels with each other from the exterior, locate iti a step ladder near the interior walls to visually r C inspect the alignment and adjust as necessary. _____1r," s 2013 Nor-Lake. Inc 05/13 Rev. E 132617 - WALK-IN INSTALLATION -DOOR/DOOR SECTION • KO-LAKE - DOOR/DOOR SECTION A standard door/door section consists basically of a single wall panel that + „�j ,. contains an entrance door and several accessories. The electrical .-""i` components contained in this panel were prewired at the factory. They include the anti-condensate door opening heater, the pilot light, and switch f`.?t::- _ and a vapor proof interior light. The door was factory installed on the door panel framing fixture, checked for a.{; ! . '' squareness and for proper operation under controlled conditions. . I CAUTION! While installing the door/door section, extreme care must be taken to avoid twisting the panel or handling the assembly in such a manner that it is not square when it is installed. The self-closing feature, door closure an operation and a perfect gasket seal all depend a great deal upon a SQUARE ... and PLUMB door/door section. - After all the wall and door panels have been erected and locked securely ; i together and all the ceiling panels have been positioned above the wall panels, 1111440, I, the ceiling panels have been locked securely to each other, re-check the =' position of the ceiling panels with respect to the wall panels. - a . l Now lock all ceiling panels securely to the wall panels. Recheck the position of the wall panels with respect to the floor panels and , rr4 ,_,.-r;',. i#j VV •V lock them securely together. ,� � �, �* --"'" NOTE: When a 1" vinyl floor sealer (screed) is used no attachment to the , s� ,, -�"' ,S wall panels is required. . . :• a■ S. rx 11. . - : '.'. 4 • 7: tier I 1 Completed Completed Walk-in floorless-shown Walk-in with floor with vinyl floor sealer ®2013 Nor-Lake,Inc 05/13 Rev.E 132617 I WALK-IN INSTALLATION -DOOR/DOOR SECTION NOr AKE NOTE: If, for some reason, conditions on the site prohibit the :. installation of the walls and ceilings in the recommended order ,,,_ rh-.. �4r install the wall and ceiling panels in a logical sequence that will A7*. ,�, -. 1-i k, - permit accessibility for installation of the last panel. Remember to '1 .` .,; y_` -- ' .- schedule ceiling panel installation at the proper intervals to serve as ,. c supporting ties between installed wall panels. r �Y4 Locate the plug buttons which were packed in the hardware bag " ``` - P 9 P 9 ,�, ,;,- c and, after checking to make sure that the hex wrench comes to a z. ; full stop on each section latch, insert a plug button into every latch r�' access hole. SLAM BRACES The door/door section frame on most floorless walk-ins will be fitted -'._ A with slam braces,one on each of the interior,vertical frame members. These braces will require attachment to the building floor. - v3 Their purpose is to positively locate the lower extremities of the door frames and prevent any movement that might occur at the '' point where the door frame rests on the floor sealer (screed). , When 1" vinyl floor sealers are furnished, they will be notched to accommodate the slam brace location. The slotted holes in the vertical leg of the slam brace permit adjustment in either direction to allow the slam brace to contact the building floor properly. Fasteners suitable for securing the slam braces to a concrete building floor are packed in a bag and attached to one of the slam braces. For other types of building floors, the appropriate fastener must be provided by others. IMPORTANT! Make sure that the door/door section is PERFECTLY PLUMB before attaching the braces to the building floor. The holes in the slam brace for attachment to the building floor are intentionally round so that no a.shifting can occur after they are secured. Make sure the slam braces have been secured to the building floor.0., •P -':-''.''',,;°'':'*,:'.,*nv' - , r . 10 .. „ t.. ilp z., , �� The recommended hole size for Install anchor Attach slam brace with fastener PARABOLT ANCHOR is 3/8"X provided 2-1/4" ® ®2013 Nor-Lake,Inc 05/13 Rev.E 132617 J WALK-IN INSTALLATION -DOOR/DOOR SECTION ruin ENO�IAK� C. 7, WALL SEALER OOOR SECTION 'c, =i SLAMSRACE IMPORTANT! � ��iNRE9HOl0 MAKE SURE THAT THE R DOOR/DOOR SECTION IS Le. OWrEN000RPANEL PERFECTLY PLUMB BEFORE ATTACHING THE SLAM INTERIOR VIEW APPLYSE/LLANT UNDER THRESHOLD BRACES TO THE FLOOR. INSTALLATION Of ELAN SPAcIS Fig. 11 i i l i DOOR SECTION(DOOR NOT SHOWN) / TMRE3HOLO Note:Add sealant between threshold and floor to seal. `j Apply Sealant Under Threshold THRESHOLD ATTACHMENT (EXTERIOR VIEW) Fig. 12 THRESHOLD ATTACHMENT The threshold was attached at the factory to the lower portion of the door section and it is positioned in such a manner that no adjustment is required. It must, however, be attached to the building floor to complete the installation. IMPORTANT! Make sure that the slam braces are securely fastened to the door section and to the building floor before attaching the threshold to the building floor. Both edges of the threshold should be attached with fasteners that are appropriate for the building floor and, since the floor surfaces vary so greatly in composition, no fasteners are provided and should be obtained by others (Fig. 12). 24 ®2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN INSTALLATION - SITE SELECTION, BASE PREPARATION Q____NORLAKE \\ \\.\\\\\\ ■ / \\\,:\\' Is \ ' COVE MOLL"NG APPL• W TO A WALL PANEL WITN CEMALE FORMED BOTTOM END Fig. 13 SEALING THE JUNCTURE OF WALLS TO BUILDING FLOOR Apply a generous amount of NSF approved sealant to achieve a vapor seal between the bottom edge of all wall, corner, door and partition panels and the building floor. The sealant must be applied to both inner and outer edges of all perimeter walls and to both edges of partition walls where they meet the building floor. Make certain that the sealant produces a continuous, air-tight seal, without gaps, and that special care is taken to seal around the shimming material. After the sealant has had an opportunity to set up, trim away all excess sealant flush with the edges of the walls. Touch up any areas where the sealant is not making a perfect seal (Fig. 8). COVE MOLDING To comply with the requirements of Standard No. 7, National Sanitation Foundation, a cove molding with a minimum radius of 1/4" must be applied to cover the juncture of the walk-in walls and the building floor. For with floor models cove molding is required on exterior walls only. Cove molding and adhesive for application are not normally provided. They are readily available at most building materials suppliers. Before applying cove molding, make final inspection of the area that will be covered with the molding to make sure that the sealant is intact and making perfect vapor seal. If not, add sealant as required. Read and follow the instructions prepared by the manufacturer of the cove molding and the adhesive before proceeding with the installation (Fig. 13). If tile and grout are employed as floor material and, if base title is intended to produce the cove required, make sure that the inside radius of the base tile is at least 1/4". ®2013 Nor-Lake,Inc 05/13 Rev.E 132617 EXTERIOR RAMP INSTALLATION INSTRUCTIONS • Q\10- LAK_E___ Exterior Ramp Installation Instructions Center ramp in front of door opening. Then using the 1-1/2" x 1-1/2" x 3-1/2" angle the screws provided, attach the ramp to the walk-in, as in the illustration below. fot\.,\ 000/ 41 0 444‘ F�-TAR/oR R4Mp. BRACKET (TYP) 1 26 C 2013 Nor-Lake,Inc 05/13 Rev.E 132617 . , INTERIOR RAMP INSTALLATION INSTRUCTIONS �ORLAK__E - Interior Ramp Installation Instructions INTERIOR FLOOR METAL ,,,!' POI --6.)4 /oil OP- EXT FLOOR METAL UP 44 4' Step 1 Step 2 After floor sections are in place and fully Place ramp into position by lining up the pre- locked together, apply approximately drilled holes in the ramp with the pre-drilled 1/8" bead of sealant to the interior metal, in the interior floor then secure the ramp into 3/8" in from the ramp cut out. Also apply the floor with the #8 x 1/2" screws provided. approximately 1/8" bead of sealant to the center of the exterior metal lip. 6"x24" NON-SKID FLOOR FABRIC 3"x24" NON-SKID FLOOR FABRIC I. '�`{.+ .+ .,, ` Step 3 r1`' ++ ++ ++ ++ • Install non-skid floor fabric 6" x 24" Non-skid • t + , , , , f applied to cover ramp base and back seam of r ++ ++ ++ ,, ramp to floor 3" x 24" non skid applied to cover _ + +++ ./` side seam of ramp base to floor. SEALANT /`� Apply sealant where the door section meets the interior and exterior of the floor panel and ramp. Also, apply sealant under the door threshold. 0 2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN INSTALLATION-ELECTRICAL CONNECTIONS OI�LAK� WALK-IN INSTALLATION Electrical Connections WALK-IN COOLER OR FREEZER WITH A SINGLE INTERIOR LIGHT MOUNTED ON THE DOOR SECTION Y` CAUTION: ELECTRICAL CONNECTIONS TO THE WALK-IN MUST '° #• t COMPLY WITH APPLICABLE PORTIONS OF THE NATIONAL ELECTRICAL CODE AND ANY OTHER ELECTRICAL CODES THAT MAY HAVE JURISDICTION OVER THE INSTALLATION! A dedicated electrical power supply circuit for the walk-in is recommended. WARNING! DISCONNECT THE SELECTED POWER SUPPLY CIRCUIT AND ATTACH A TAG TO THE DISCONNECT SWITCH INDICATING THAT THE CIRCUIT MUST NOT BE ENERGIZED WHILE SOMEONE IS WORKING ON THE LINE. WIRING The cooler or freezer door panel contains several electrical components that were prewired at the factory. They include the anti-condensate door opening heater, the pilot light/switch and vapor proof, incandescent interior light mounted on the door panel. NOTE: It is the electrical contractor's responsibility to provide the necessary wiring, connections, conduit and fittings to complete the hook-up. The base for the vapor proof light fixture is the junction box which contains the electrical leads that are prewired to the electrical components contained in the door section. Determine exactly where the power is to be brought into the junction box. s ` f 4 Affixed to the interior of the door section is a label which describes the electrical characteristics and the energy consumption described in watts and amperes. The total energy requirement for a walk-in includes one (1) 100 watt incandescent lamp. This information is useful in determining wire sizes. The light bulb is not furnished. 28 ®2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN INSTALLATION-ELECTRICAL CONNECTIONS KORLAK> IMPORTANT! When all field wired connections are completed in the junction box located on top of the ceiling section, be sure to THOROUGHLY SEAL the conduit fitting through which the wiring projects into the junction box. The silicone sealant provided is well suited for this purpose. Failure to do so will a . permit moisture to form within the junction box and electrical fixture(s) and potentially cause a short. .- -< POSITIONING THE THERMOMETER SENSING BULB % , For convenient monitoring of the temperature of the storage compartment of this walk-in, a remote reading thermometer has been installed in the door section at about eye level. It is a flush panel mount with an LED readout. , . y I .n . ,1 • < For optimum accuracy, the sensing bulb must be exposed to the air that is being monitored. Make " certain that the sensing bulb is not positioned near lg.° , the interior light or any other heat producing device, ,l^ -( _: ... `.1 ' ,. „'l nor should it be located where stored products `"' " ' shield the sensing bulb from the circulating air , pattern within the walk-in. The long sensing lead is l' ,1- more than adequate to provide an ideal sensing bulb ¢',`_. ' °4 , placement on the inside surface of the door section 4105'''''' r' ' i ; , or an adjacent wall or corner panel. When the . ,ilr, '' `,', ' location is finalized, an adhesive backed, plastic clip 4, is used to secure the sensing bulb to that surface. I To prevent possible damage to the door opening RE heater and/or to the protective globe over the interior light, DO NOT energize the door/door section until the interior temperature has been reduced to the normal operating range by refrigeration. A caution label is affixed to the door section near the vapor proof light to serve as a reminder. PRESSURE RELIEF PORT a° 1.,In If a pressure relief port is supplied, •°4 1am connect it to a 115/60/1 VAC power ■ % • + _.., supply. e .. _.,M.,,.r \ AMC!OM 1131 0:1 '.� ...in.0-1M7►It CU w »cu rt MM. pr s s/ usn imrw 5011 1 WIRING DIAGRAM: A wiring diagram showing the electrical lti `:11—" 'J' ® ' components contained in the door/door section circuitry involved till; , 0 I 1 as shown. Always refer to the wiring diagram if it becomes ; necessary to replace any of the components. ..:r.LIfMT V/ WITCH 29 c 2013 Nor-Lake,Inc 05/13 Rev E 132617 WALK-IN MAINTENANCE �NO�LAK� WALK-IN MAINTENANCE SWEEP GASKET • The sweep gasket was factory installed and tested for proper �r 4 "' a" operation before shipment. It features a unique cross-section a designed to not only seal the gap between the bottom of the walk-in door and the threshold or building floor, but its off-set configuration closes an opening that is normally created at both �` ends of a conventional sweep gasket. It is attached to the lower edge of a walk-in door assembly with 3/4" pan head sheet metal screws and flat washers. 1 . . The sweep gasket extrusion consists of three distinct durometers ' (hardness)of vinyl extruded in a one-piece profile. The rigid area forms the attachment section. The flexible portion forms the sweep projection and provides the end seal and an extremely - flexible lip that contacts the threshold or building floor, depending upon the installation. OPERATION As soon as the door opening sequence begins, the cam-lift hinges begin raising the door and the sweep gasket releases its contact with the threshold or building floor. At approximately r-- , 90° from the face of the walk-in, the door will reach the "hold open" position and will no longer rise by cam action. The sweep f i - ^ gasket will be lifted about 3/8" above the threshold or building floor. When in the closed position, the extremely flexible lip of the sweep gasket should merely brush the threshold or building floor along its entire length. ADJUSTING THE SWEEP GASKET (Initial Installation) With the door COMPLETELY CLOSED, the proper distance between the bottom of the rigid attachment area of the sweep gasket and the threshold or building floor MUST BE 1/2". If this dimension is less than 1/2", the sweep gasket will wear prematurely and will produce excess friction for the door closer to act against during the door closing sequence. If this dimension is greater than 1/2", the lower lip will not contact the threshold or building floor and the seal will be compromised, permitting air infiltration to occur in this area. Measure both ends of the sweep gasket with the door closed and adjust until exactly 1/2" is attained. ADJUSTING THE SWEEP GASKET (Normal Wear) After considerable usage, if examination reveals that the lower lip of the sweep gasket has worn to a point where noticeable air infiltration is occurring, merely loosen the attachment screws and the lower the gasket only enough to permit the lower lip to brush the threshold or building floor while the DOOR IS IN THE CLOSED POSITION. Do not lower the gasket more than is necessary! Tighten the attachment screws and check the operation. 30 ®2013 Nor-Lake,Inc 05/13 Rev.E 132617 _J WALK-IN MAINTENANCE NORLAKE ADJUSTABLE HINGE • Nor-Lake 26", 30", & 36"wide walk-in doors are provided with an adjustable hinge. The adjustable hinge provides the ability to square a door within the door jamb. If a door requires adjustment: Open the door and you will find a small chrome plug button, on the edge of the door behind the upper hinge. Before any adjustment you must first slightly loosen the screws on the hinge strap on the door. Then pop off the chrome plug button. Now you can access the adjustment screw. You should only make minor adjustments and then close the door to view if the adjustment rectified the situation. When complete replace the chrome plug and re-tighten the screws on the hinge strap. NOTE: On doors with a kick plate you may have a center (3rd) hinge. In this case there is a 2nd adjustable hinge. You will need to loosen the screws on both the top and center hinge(s) and make minor adjustments in both areas. REPLACEMENT OF THE MAGNETIC DOOR GASKET ASSEMBLY For your convenience and safety, it is advisable to remove the entire door assembly from the walk-in cooler or freezer before attempting to replace the door gasket. aft," Prepare a smooth, clean surface on which the exterior surface of the door assembly can be placed without marring or scratching the finish. °V!4 DOOR ASSEMBLY REMOVAL -ALL FOAMED WALK-IN COOLER OR FREEZERS WITH CAM LIFT HINGES • NOTE: For doors equipped with a spring hinge, see the door removal instructions label on the interior of the door near the top hinge. When removing the door assembly from any walk-in, solicit the aid of an assistant during the door removal and replacement procedures. 1. Open door to dwell position, stopping at approximately 120°. 2. Put mark on floor to indicate position of door, see sketch. 3. Lift door off frame. ■•• • 4. To replace door, line up door with mark on floor. 1.po 5. Place hex hole in hinge straps over hex rods and lower door. Strap RESETTING SPRING HINGES For the top spring-loaded hinge, you will need to reset the spring/hexagon pin. With the door installed, closed and locked, remove the screws from the spring loaded hinge strap on the door only. You will need to hold the hinge strap against the door to prevent the strap from springing out towards you after the screws are Mark removed. Remove the strap portion from the door by pulling upward. Hold the strap portion above the remainder of the hinge so that the strap is flat against the door. Bring the strap portion back down towards the door so that it meets the hexagon pin. You have now reset the spring. Insert the screws back into the strap and door. Note: Under normal conditions, the spring has no tension when the door is closed. ©2013 Nor-Lake,Inc 05/13 Rev,E 132617 WALK-IN MAINTENANCE ,NORLA ) • DOOR GASKET REPLACEMENT - ','A-:t",,V - - 1. Place the door, exterior face down, gasket up, on a clean, smooth surface • c ',. that will not mar or scratch the finish. 2. The magnetic door gasket consists of a cavity • containing the magnetic strip, a bellows cavity • ;At, .. r that permits the gasket to conform to irregular i %h ;-{ ; too surfaces, and a base section that features , Yom__ a dart- shaped projection that serves as the attachment means when it is forced into the slot in the door breaker. 3. To remove the original magnetic gasket assembly, grasp the gasket at one of the corners and pull the dart-shaped projection out of the retainer slot in the door breaker q 0'0.x` Pull slowly and examine your progress to • avoid tearing the projection which will then remain in the retainer slot. 4. Remove the entire gasket assembly and examine the retainer slot to make sure that it is free of gasket material or other debris. 5. Starting at one corner, insert the dart-shaped projection of the replacement gasket into the retainer slot and, using a rubber mallet, drive the dart into the retainer slot. HINT: Cover the face of the rubber mallet with masking a tape to prevent smudging the gasket. Attach only about two inches (2") of the gasket in each direction away from the corner. 6. Use the same procedure as in Step 4 at the remaining corners and also midway between the corners on the long sides of the door. •' :_� P,'''."4:,. s ,.t t V• 7. Using the rubber mallet, drive the dart into the 7 - std .,n. PA .-3 : 5. 1ap�r.�•i �F '., retainer slot working from the center of each side - . �a X, toward the corners. l �- ���» W 8. Lift the gasket base on the outer edge of the gasket and examine the gasket to determine if the dart ' :.- , is engaged by the retainer slot around the entire ,, perimeter of the door, except where the sweep id gasket is attached. If the dart has failed to engage in some areas, a small, slotted screwdriver blade can III be used to tuck the dart into the slot. • 9. Replace the door assembly. Simply reverse the instructions in the "Door Assembly Removal" section. T.)2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN MAINTENANCE a DOOR CLOSER • • The door closer was factory-installed and tested forproperoperation " . before shipment. This small, but powerful device provides smooth and positive closing with only a minimum of attention. No lubrication of any kind is required. Correct with Door Closed Correct with Door Open It is recommended that, at least once each month, the relationship of the hook and roller to each other be examined. To become familiar with the various components of the closer, see photo of a closer properly engaged when the walk-in door is dosed. Since the door closer in itself is literally non-adjustable, any adjustment that becomes necessary must be accomplished at the closer hook. CAUTION: DO NOT ATTEMPT TO BEND THE HOOK as a means Roller Too Low of adjustment. The hook is formed and tempered to resist deformation during normal use. ROLLER IS TOO LOW: Loosen all hook bracket screws and add flat washer(s) between the bracket and the header where the TOP two - — screws will keep them in place. Tighten the screws and check the hook position. ROLLER IS TOO HIGH: Loosen all hook bracket screws and add washer(s) between the bracket and the header where the BOTTOM two screws will keep them in place. Tighten the screws and check the hook position. Roller Too High If, for any reason, the roller arm is accidentally bumped into a vertical Nig position while the door is open, IT MUST BE MANUALLY MOVED TO f` =� `c �••V'',11•74,1. fi f •', THE HORIZONTAL POSITION before the door is closed. Failure to doi - so may cause serious damage to the door and/or the door closer. WARNING! • •"� to tc: S[i T R 411' tit 0001 ^ Qoffa Roue ARM JMult RIMAM 0$A ' . •A MWnUO•IAI MAXIM wr1 flit DOOR •• tS ORot AVIS, • I.• 01!113 A warning label is affixed to the door section as a reminder. 0 2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN MAINTENANCE �vo�LAKE ▪ ANTI-CONDENSATE DOOR OPENING HEATER l • To prevent condensate from forming around the outer edges of the door opening, an anti-condensate heater has been installed around the perimeter of the door opening. This constant-energy, low wattage, electric heater wire elevates the temperature of the door jambs and threshold sufficiently to maintain these surfaces above the dewpoint temperature of the surrounding air preventing condensation. Failure of the heater wire is usually suspected when condensation forms around the perimeter of the door opening. Moisture accumulates to a point where it causes a problem on the building floor, or when the condensate freezes around the door opening, as will be the case when a walk-in freezer is involved. There is no cause for alarm, however, if occasionally a few drops of moisture form during a period of EXCEPTIONALLY HIGH HUMIDITY. NOTE: The heater wire is designed to provide the proper amount of heat to the surfaces around the door opening WHILE THE WALK-IN IS AT DESIGN TEMPERATURE! Premature failure will result if the heater wire is energized over an extended period of time while no refrigeration is occurring within the walk-in cooler or freezer. HEATER WIRE REPLACEMENT Three pieces of trim and the threshold must be removed to gain access to the heater wire. The trim serves as the cover of the heater raceway at the side jambs r and the head jamb. The threshold covers the heater channel in the bottom plate of the door section. THRESHOLD REMOVAL WARNING! Make sure that the electric power to the walk-in is disconnected before attempting to replace door heater. To remove the threshold, remove all 11110 visible screws that attach the threshold to the walk-in floor or to the building • floor. Three screws attach the threshold to the bottom plate of the door section. ' When all screws are removed, pry the �. threshold up until it is free and remove it from the floor section. } . .• STAINLESS STEEL TRIM REMOVAL i Use a screwdriver to remove four screws on each of the three trim pieces. Remove each trim piece in turn. This will expose the heater wire and hardboard '4., ., �kl' spacer strip. ' '' t t. :F 34 )2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN MAINTENANCE NORKE I • Again, MAKE SURE THAT THE POWER IS DISCONNECTED and remove the cover plate from the pilot light and switch on the front of a ' to g- the door section. Remove the two screws that attach the pilot light and switch assembly to the switch box and pull the pilot light and switch IP.. assembly out of the switch box enough to expose the terminal screws on the device. Examine the wiring in the switch box and identify the two black leads from the heater wire that are connected either to two switch terminals or to one switch terminal and to a wire connector. Refer to the wiring diagram of the walk-in cooler in the "Electrical Connections" section of this manual. HINT: After positively identifying the two leads to the heater wire, cut the leads off, but leave an inch or two remaining on the switch terminal(s) and/or wire connector. In so doing, these short lengths of lead will positively identify the proper points of connection when the replacement heater is installed. Remove the original heater wire from the jambs and threshold and discard it. y a. A ∎ VI `s, i.. .... f3 tps, .MM1P,` .,.w. .0 '.AIM INSTALLATION OF THE REPLACEMENT HEATER Insert the two lead wires of the replacement heater into the access hole in the heater wire raceway that leads to the pilot light and switch junction box. NOTE: The section where the lead connects to the heater wire SHOULD NOT BE BENT! Locate the connector sections as close as possible to the access hole, but KEEP THEM STRAIGHT! Secure the connector sections in place with a short piece of electrical tape. e Temporarily arrange the heater wire assembly. o 2013 Nor-Lake,Inc 05/13 Rev.E 132617 J WALK-IN MAINTENANCE N0LA > - . t . , Syii i. .404,,,,,,,..i., ,„,'0 1.4 f u 1, . Y,dt, Y., , 4 rc f....t;:./,-....,.,. y s T +y �4 }44 ptiti,'argaiIiiig ,ii -.As . v* Using small pieces of electrical tape, fasten the heater wire in place. Lift the heater wire at each corner and apply three thicknesses of electrical tape around the insulation over a length of approximately 3". Follow by forming a small loop at each corner to permit expansion and contraction of the heater wire without strain at these points. After the loops `r te' ,: -` are formed, tape them in place with a short strip of electrical tape. V.4)'—i-.1.1. 41 The heater wire should be relatively straight in the head jamb and in the side w jambs, but all excess heater wire must be taken up in the THRESHOLD AREA '+r - , ONLY by forming a "zig-zag" configuration. Make sure that this configuration will be accommodated by the width of the raceway in the bottom plate orS° "` • threshold. The extra length of heater wire concentrated in the threshold will -1 , produce more heat per foot in the threshold than in the jambs. t.",f ;. i After the heater wire is in place, tape it down where necessary with short strips of electrical tape to prevent the heater wire from interfering with the replacement of the chrome trim. STAINLESS STEEL TRIM REPLACEMENT i'` Start replacing the stainless steel trim with the head trim section. Hold in place while replacing the three screws. Install the right and left trim in a similar manner. The trim should easily be replaced by hand. THRESHOLD ; , " REPLACEMENT i . `: �" . g ' Place the threshold in its original 1 location and replace all of the screws .. • in their original locations. Reminder: The hardboard needs to be in place .r t'n• OFF .,nip< � �' before replacing the threshold. After the threshold is secured, apply a 3/16" bead of silicone sealant at both ends of the threshold where they meet the side jambs. With a wet finger, smooth out the silicone fillet for a neat, professional looking job. 36 ©2013 Nor-Lake,Inc 05/13 Rev.E 132617 WALK-IN MAINTENANCE �NO�LAK� ELECTRICAL CONNECTION Referring to the wiring diagram in the"Electrical Connections" section of this manual, connect the heater wire leads as shown. If short lengths of the lead wires were left as indicators, connect the replacement heater leads to those points of connection and discard the short indicator lengths. NOTE: If one of the heater leads connects to another wire through a wire connector, obtain a properly sized, twist- on wire connector for this purpose. Replace the pilot light and switch in the switch box and attach the switch cover to complete the job. Energize the walk-in cooler to resume operation. PANEL CLEANING AND MAINTENANCE RECOMMENDATIONS During the course of uncrating, handling and installation, the panel surfaces of your walk-in cooler or freezer may have become stained or dirty. Cleaning all metal type surfaces, door trim and gaskets can be performed with a mild detergent and hot water. It is important that you remove all excess soap and dry the surfaces thoroughly. Never, under any circumstances, use an abrasive or alkaline solution. Occasionally it may become necessary to clean the interior surface for sanitary purposes. A mild solution of baking soda and warm water will tend to impart a clean, sweet smell to the interior should odors occur from spillage or container breakage. Never leave standing water inside the walk-in cooler or freezer. O I ®2013 Nor-Lake,Inc 05/13 Rev.E 132617 NO LAKE Nor-Lake, Incorporated 800-955-5253 Sales 727 Second Street 800-388-5253 Parts/Service P.O. Box 248 715-386-2323 Hudson, Wisconsin 54016 715-386-6149 FAX Email: service @norlake.com www.norlake.com : ., Standex Food Service Egaipment Group 2013 Nor-Lake,Inc 05/13 Rev.E 132617 J