Loading...
Plans CITY OF TIGARD REVIEWED FOR CODE COMPLIANCE Approved: [ OTC: [ Permit#: V/(itEc,20 t5-Or.)572 Address: '3 5-O k)5 R Suite#: By ` " "' Data ' 13( 1 5 Approved plans shall be on job site. OFFICE COPY w 8/31/2015 Strand::Installation Instructios::Horizontal California Valves 1 STRAND EARTHQUAKE CONSULTANTS Earthquake Safety Equipment r PROFILE = — , YRC)DUCTS PRODUCTS PAPERS it 4 1 =. - ,: , . -4. DOWNLOAD :` = 'lli Ik III ZONE 'ii 1111:_:_ CONIACI us CALIFORNIA (formerly known as Koso) Seismic Gas Shutoff Valves HOME Horizontal CALIFORNIA Valves INSTALLATION AND MAINTENANCE INSTRUCTIONS Installation and maintenance must be done to the requirements of the local building code or Click here to view installation steps governing agency; or, in the absence of local building codes, to the requirements of the -- National Fuel Gas Code (ANSI Z223.1), and, if applicable, the National Electrical ` Code (ANSI/NFPA 70). Installation and maintenance must be performed by personnel having the qualifications required by law to install and service natural gas lines and equipment. Whenever possible, the valve should be installed in the gas line before the line enters the protected structure. Generally this is on the customer's side of the meter; but may be upstream of the meter if allowed by the utility. Install valve in upright position with the gas flow in the direction of the arrow on the valve body. The plumb chain in the level indicator on the side of the valve must be centered in the hole in the bracket through which it passes. Warning: If the valve is installed so the gas flow is in the direction OPPOSITE - FROM THE ARROW on the valve body, the valve WILL NOT OPERATE CITY OF TI Y. . _ REVIEWED FOR CODE COMPLIANCE VALVE INSTALLATION Approved: V 1 - OTC= • ( ] The valve must be rigidly mounted to the earth, to the foundation, or near the foundation of the protected Model Turning effort Permit c movements will be transmitted to (inch-pounds) Address: the accel .ra ion tri r mechanism located within the 300/310 560 Suite#: valve assembly. 301/311 750 Y' B etealy� be installed in gas lines whose 302/312 875 maximum pressure will never exceed the pressure rating 303/313 940 stamped on the valve's nameplate band. During 314 1190 OFFICE COPY installation, when making pipe connections to the valve 315 1310 body, the turning effort on the valve body's pipe threads 316 1500 SHALL NOT EXCEED the figures in the table to the right. After the installation is complete, the gas service should be restored according to the directions given below under "Opening& Resetting of the Valve." VERIFICATION OF VALVE OPERATION http:/Avww.strandearthauake.com/prod seis GSVlns horizmodel.html 8/31/2015 Strand::Installation Instructios::Horizontal California Valves Unless otherwise specified by code, it is recommended that the valve be inspected at least once a year to assure it is level and has not been damaged. If the valve is found to be out of level or appears damaged, the customer should call a qualified gas service person to arrange repairs. Warning: Read the following sections before attempting to reset the valve. OPENING&RESETTING OF THE VALVE—MODELS 300,301,302,303 When the valve is closed, a Red Bar will be visible through the window in the position indicator, which is located on the bottom of the red bonnet,just above the clamp band. To open the valve, first verify that the main gas shutoff valve is closed, then gently rotate the Reset Cam(located on the side of the valve) in the direction indicated by the • "to open" arrow, until the Green Bar is visible through the window. Release the turning effort. If reset has occurred, the Reset Cam will return to its original position, and the Green Bar will remain visible through the window. The valve is now open, and the acceleration trigger mechanism is set to respond to a seismic disturbance. The main gas shutoff valve may now be opened. OPENING&RESETTING OF THE VALVE—MODELS 310,311,312,313,314,314F, 315,315F,316,316F,317F,318,318F,&319F When the valve is closed, a Red Bar will be visible through the window in the position indicator, which is located on the bottom of the red bonnet,just above the clamp band. To open the valve, first verify that the main gas shutoff valve is closed, then gently rotate the Reset Cam (located on the side of the valve) in the direction indicated by the "to open" arrow, which will open the pressure-release poppet in the center of the valve's disc. Hold the Reset Cam in this position until the pressure equalizes across the valve's disc. Then, with very little turning effort, continue rotating the Reset Cam until the Green Bar is visible through the window. Release the turning effort. If reset has occurred, the Reset Cam will return to its original position, and the Green Bar will • remain visible through the window. The valve is now open, and the acceleration trigger mechanism is set to respond to a seismic disturbance. The main gas shutoff valve may now be opened. Warning: If the reset shaft does not return to its original position, or the valve remains closed and will not reset, the gas service must be shut off and the valve replaced before service can be restored. If the valve will not reset, please call the factory or your distributor for technical service. After an Earthquake • The acceleration trigger mechanism within the valve has been factory tested to verify that the finished valve complies with national (ASCE 25-97) and state (California 12- 16-1) standards. Gas plumbing damage may have occurred during an earthquake or aftershock. If a gas leak exists, gas service should be turned off at the main shut-off valve. Do not restore the gas service without assistance from a qualified person. You will be safer if you let authorized personnel restore service. http://www.strandearthquake.com/prod sets GSV/ins horizmodel.11ml STRAND EAR'T'HQUAKE CONSULTANTS '1 ililli ' Earthquake Safety Equipment PROFILE` PRODUCTS PRODUCTS . PAPERS DOWNLOAD • ZONE 7: CONTACT US Installation Instructions for Horizontal CALIFORNIA Valves HOME t' r ---Ali ...... 4 1. Original meter set assembly 2. Turn gas off at manual valve (MSA) & connection to upstream of meter. Note: If houseline stub before work has manual valve is difficult to open, begun. contact your gas utility for assistance. in . gar III 3. Loosen meter swivel. 4. Take care not to ruin gasket when removing union. Note: If gasket is damaged, call your gas utility for replacement. r l r • l7 L 5. Remove existing plumbing 6. With original plumbing removed, • downstream of meter. build new plumbing from structure to meter. 8. Use telfon tape or liquid sealant • iiiip,.. .. . omio... iii . on all joints. • 7. Configure new plumbing with CALIFORNIA Valve. i • • 9. Install union gasket and new 10. CALIFORNIA Valve must be plumbing from meter to building. installed level. Note: Use leveling chain to confirm that the seismic valve is level. MOP r 4• OP Ihit- 1161 11. Install stablizer bracket(Unistrut 12. Finish meter plumbing system or equivalent) to plumbing with CALIFORNIA Valve. (within 6" of seismic valve) and Note: For aesthetics, level the secure to building. stabilizer bracket. '1y1% .......‘. i ...--,__,,, . - i it .. rR 1♦ 13. While gas is still off, open 14. Turn gas on at meter inlet valve; seismic valve. Do not open do not use pipe wrench. Note: against gas pressure. Open gas valve slowly to prevent damage to regulator. • 15. Use soapy solution to check for leaks. 16. Apply paint to all new plumbing to prevent rust. Back