Loading...
Report °olutions 1 ncl l wi :;1 , May 29, 2014 a ./> p,5,1% CiITY phoenixredev-14-2-gi Phoenix Redevelopment 5s4-777. exit jonl @phoenixredevelopment.com SUMMARY OF GEOTECHNICAL SERVICES Infiltration Evaluation, 9880 SW Sattler- Tigard, OR We appreciate the opportunity to present this summary of our geotechnical services for the subject infiltration evaluation. From our communications we understand the site is to be redeveloped for several lots with an access easement/drive to the east. Infiltration rates are needed to evaluate shallow on-site storm water system design by others. Our scope of work included the following: Provide principal-level project management including client communications, management of field and subcontracted services, report writing, analyses, and invoicing. Review previous reports, geologic maps and vicinity geotechnical information as indicators of subsurface conditions. Complete a site reconnaissance to observe surface features relevant to geotechnical issues, such as topography, vegetation, presence and condition of springs, exposed soils and rock, and evidence of previous grading. Explore subsurface conditions with two test pits advanced to a depth of up to 8 feet or refusal using a small track mounted excavator. Provide a water tank and casing for infiltration testing. • Complete open hole or cased hole falling head infiltration testing in the explorations, and provide infiltration rates to the civil engineer for their system design, including related geotechnical material and embedment recommendations. • Classify and sample materials encountered and maintain a detailed log of the explorations. • Provide a written letter report summarizing the results of our geotechnical evaluation. Subsurface Conditions We completed our geotechnical explorations on May 28, 2014 using a small rubber-track mounted excavator by excavating two test pits to depths of up to 8 feet. Our test pits are approximately located on the attached Site Plan. Subsurface conditions consisted of soft to stiff silt with angular basalt fragments at depth in TP-2. Slow seepage was observed at a depth of 7 feet in TP-2. No caving was observed in our exploration. Infiltration Falling head infiltration testing was completed at depths of approximately 3.5 to 4 feet in each exploration, using a double ring standpipe configuration and falling head measurements after initial saturation and up to 2 feet of head. Raw results are listed in the Attached Test Pit Logs. Based on the results of our testing and analyses we recommend using a design infiltration rate of 0.8 cubic inches per hour per square inch (this includes a reduction factor of 2 applied to the average of the test results) applied to the sides of systems, with the base also used if the upstream collection system is protected from sedimentation. 112 1 1 12 7th Street, Oregon City, OR 97045 p 503.657.3487 f 503.722.9946 May 29, 2014 phoenixredev-14-2-gi Trench systems must be protected from silt intrusion with the use of non-woven geosynthetics, such as a Propex Geotex 601 or equivalent. Rock for system fill must be open graded and contain no more than 2%fines. Field Testing As actual subsurface conditions and infiltration can vary widely, testing of infiltration systems is required to confirm this preliminary estimate. Flexibility for adaptation of infiltration systems should be planned into the design and construction, with contingencies built into the budgets and schedules. Infiltration systems need to be maintained free of debris and silt in order to function properly. Limitations We have prepared this report for use by Phoenix Redevelopment and members of the design and construction teams for this project only. The information herein could be used for bidding or estimating purposes but should not be construed as a warranty of subsurface conditions. We have made observations only at the aforementioned locations and only at the stated depths. These observations do not reflect soil types, strata thicknesses, water levels or seepage that may exist between observations. We should be consulted to observe all excavations for infiltration systems. We should be consulted to review final design and specifications in order to see that our recommendations are suitably followed. If any changes are made to the anticipated locations, configurations, or construction timing, our recommendations may not be applicable, and we should be consulted. The preceding recommendations should be considered preliminary, as actual soil conditions may vary. In order for our recommendations to be final, we must be retained to observe actual subsurface conditions encountered. Our observations will allow us to interpret actual conditions and adapt our recommendations if needed. Within the limitations of scope, schedule and budget, our services have been executed in accordance with the generally accepted practices in this area at the time this report was prepared. No warranties, expressed or implied, are given. < We appreciate the opportunity to work with you on this project. Please call if you have any questions. Sincerely, Don Rondema, MS, PE, GE _ Principal 4rp 'yr r _Expires 1213111+4 I Attachments: Site Plan, Classification Guidelines, Test Pit Logs, Moisture Contents 2/2 1 1 12 7h Street, Oregon City, OR 97045 p 503.657.3487 f 503.722.9946 ■ 4-,••••••• .. - ' --,--.4.,•1'.....,'",..•••'-'.••• • . . - .. __ • 'SINIII.' " - -., . - - .. , , . -, . . , . . . . •- Sett* si SW Sattler Street . . . •: . . ..:., 1:.;V.". . . .. . - - --, ,..,.. ::-.•• -_.•. . ,,..... ... _ 4 : •r-ls,- i .-0.•'-- -. L'e.- ''' ii• -: — . - '.e-'''.t- ' . -'' '''''' -.0 - ' d•,-..P' • .- .*''' '"''''-':,., 1.'-- :,-. :..-,!---,••-.. - • ,,,,i.-,.., ' f'''„:-.,;,%,,, • 7.i• •••'''''''-'2.r".:'. ' .,jhb 444.:.-lik.W°4;- w . ::,-- '''.. :7;-.7-4.***. ," *IP.: 4 . -,,,--'' . - '-'-j- 40•;,'•*.- ' ;!- - .7.-.44- . -14,- ." - - -•''.7.' -_ -4,-.- - -- it.. ... -4‘..-iii*let* .:. ,:-4,4. .. . _ • ... -4,/,,N . . ....-- 1.- . 4.-4-*Ar , 40.,..iipp, 4. .;'.„.„4-; -, '''r . otif.,,.- ..-_,_„1".4.--41°.-•.; ;,....,..-',/.,'i _. .'r „-...., - • . it" '-. .-•._.--±.`'••-••••••,10s...••',t• .-. -• ' ' -.ow*',-...L...:11-, : ig.._... . .‘,1 • •Vit: ' . -',.--'' .. •-1.'4- :-• . '--,.',:L. 4/. " . , . '1,4k.1 ... 1 ,--.i. - - '4 ''..,:•,4,. 'It''• .•'' '44,..,..k.1.4. ',..--,'''', r. '''.., :."-.'' '''' .'-. '- %. . -." * .: ---A—,,, 1 . . -■• : •- S. ...,'. .•'i ' ..:4': -4-:. _ - . '4... . .$4..-:-,- = ." .. '',' ,'ir,-:-.....1. 4.-2 ' 4't-r_..•./. , .,,Ar„.4,- - . :,_ • :_ . - • -,- 4- 011r1416 ‘ • ..... , - _ : - - .. .„ . - •4-- . _... . •.. . ... ,_, . ... . , • . _ . . -„, _t . ...-4-,..• ',-....,__ ,,-- ... -‘-.-., .' •----....•-",i. ,....,-41:Th '' : . - e t - '11 . ,.. ' 4- • .4.4 ii.rw'': -. .''''. '''4i-..--:-.„7.44 --'''' :.-' . . , . -•_.- '.' -' '-.- ..',.::. /- ''''.• .., - .. 14. k,44-;',••-•-•. ' ,.. Ipirli"."1111"111" 4' „et .p.• • r - • - • .. V) • . '4' '' . . ftt..-41:= 3.-1,,,, ,• - r.• 40' ., rFt I , ,A'''' " V.. •-,.11. . . ..4.1717.4 - ir *......: • , .,,'.-,.ti?..•.'.f*7' : 03 . ..„ .. . ik -''. 'll* '' e : .. '.111101. 4 re. I'•• .0'."- =70 t7 ! 1 . . •T'i . .-\ '' ' - 1.-•*, t., - - --,..4,„4.• v-.- fill. .4, .- •-- ' i. 114 ...... .■■ 1 .'"'. :.....-- - ..,•• ' .. .. _ ,... .... ,...ji, --..i.--, ' ' ... . : 1$ t ACIII. ' . All let 1 A -•.--,..t 74---'- ` '''' .1.' . .., ,.. .. .‘... 16t.....-..,,,,,•. - . .1, 1 - -4, IZR - 1 .--..• : --dd;• ,, wet! A 7T- • .i/t:'' - 4.' . . • - i . i, ilt4 '••••• - i-.4„,.... : ASA ':'-. ,r, .-.... 4d dr, • to -...*. --I.-* ---• 414 -4. ' -_• n..•• •-.-• litralaggatOr ' i # 4 ,,... -d) -.., Mr ...z.:' '*-. 41.1.1.1ftleilig■'... ", : - " - '-- ' -'. ''''":4;`'."::i;' ,le . -.'' -, ' 4- - . ,- - ,. - -11••,. :Y.,-,-Z:' 4 . . -.'t6-44-'. .- * f 0:-.,, -4 id"-. -"'d,- ' ' ' d'' . .•-• - ' . i dift. . _ .. • _ .•.. . , .. -., .,--•-•....:);* •,-.,, ,.•••,-1',.0.4:-.,. lirts. -••, - - •,-airt..• ,• 4. 4.0. 10: _, :1/2...„.......: , • .• : 111 a t"..•.,-ete' ....,..,. • .-t.- i.o• tle• ,.. -.•. . -.-: -:,..,..• 4 i...,.. 4 .... . . . ...,.. ., . . . . , •__ -4k , . 1 ,-• „IX fr'e.- ' - -": - ..--4e • •'.-:' ...-.1.-- , •• • ••;,.. .. 4.-`.': _ •- ' '.0.• r t: Ikkit -- - - N NOT TO SCALE BASE FROM GOOGLE EARTH 2012 AERIAL 6 tRcf) SITE PLAN VOILIII0FIS Incl phoenixredev-I 4-2-gi • GUIDELINES FOR CLASSIFICATION OF SOIL Description of Relative Density for Granular Soil Standard Penetration Resistance Relative Density (N-values) blows per foot very loose 0-4 loose 4- 10 medium dense 10- 30 dense 30-50 very dense over 50 Description of Consistency for Fine-Grained (Cohesive) Soils Standard Penetration Torvane Consistency Resistance(N-values) Undrained Shear blows per foot Strength,tsf very soft 0-2 less than 0.125 soft 2-4 0.125 -0.25 medium stiff 4-8 0.25-0.50 stiff 8- 15 0.50- 1.0 very stiff 15 - 30 1.0- 2.0 hard over 30 over 2.0 Grain-Size Classification Description Size Boulders 12-36 in. Cobbles 3 - 12 in. Gravel /, -3/4 in. (fine) 3/4- 3 in. (coarse) Sand No. 200- No.40 Sieve(fine) No.40- No. 10 sieve (medium) No. 10- No.4 sieve (coarse) Silt/Clay Pass No. 200 sieve Modifier for Subclassification Percentage of Other Adjective Material In Total Sample Clean/Occasional 0- 2 Trace 2 - 10 Some 10 -30 Sandy, Silty, Clayey, etc. 30 -50 r Test Pit# Depth (ft) Soil Description Explorations completed on May 29, 2014 with small excavator TP-1 Location: E central portion of property Surface conditions:Mowed grass 0.0 O4 So*dirk-6rown,rooty organic SILT with tace cmoist(topsoil). 0.4-8 Soft to medium stiff, mottled orange and gray, brown SILT with trace clay and occasional fine roots; moist. 2 feet-medium stiff, no roots 5 feet-stiff No seepage. No caving. Infiltration test at 3.5 feet. Raw field rate 2 in/hr. TP-2 Location:SE portion of property Surface conditions: Mowed grass 0.0-0.3 Soft, dark brown, rooty organic SILT with trace clay; moist(topsoil). 0.3 -7.5 Medium stiff, mottled orange and gray, brown SILT with trace clay and occasional fine roots; moist. 1.5 feet-no roots 3 feet-stiff 5 feet-stiff 7 feet-with some angular basalt fragments Slow seepage below 7 feet. Infiltration test at 4 feet. Raw field rate 1.2 in/hr. tC TEST PIT LOGS G J 0 1 U l 1 o n s I n c+ phoenixredev-14-2-gi Exploration Depth,ft Moisture Content TP-1 2.0 20% TP-1 4.0 25% TP-2 4.0 27% TP-2 6.0 27% G ep t�C MOISTURE CONTENTS O LJ i o n S I Il C I phoenixredev-14-2-gi George, Here is the Infiltration test I had done at the two homes on Sattler Street that you had requested. Please let me know if you need anything else. I am hoping to get started on these right away as one of the homes are sold and closing in a couple of weeks. I appreciate your help on this. Thanks. Cale Doney (J Gvl ( °G .?8 y Q w S47-re �'► Construction Manager fi k, 020(5-_ Cc) ?',90* 5 Ste?L.t Sage Built Homes, LLC 503-969-8298