Permit .f CITY OF TIGARD BUILDING PERMIT
3 COMMUNITY DEVELOPMENT Permit#: BUP2015-00241
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 08/20/2015
Parcel: 1 S136CC00100
Jurisdiction: Tigard
Site address: 8200 SW PFAFFLE ST
Project: Westside Christian High School Subdivision: 2006-016 PARTITION PLAT Lot: 3
Project Description: Install interior glass walls and doors in the library.
Contractor: INTERIOR TECHNOLOGY INC Owner: HILL LAND LLC,THE
PO BOX 80400 BY ARQUITAS CAPITAL MGMT INC
PORTLAND, OR 97223 5300 MEADOWS RD, STE 400
LAKE OSWEGO, OR 97035
PHONE: 503-643-9480 PHONE.
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: Vg Permit Fee-Additions,Alterations, 08/20/2015 $377.90
Demolition
Occupancy Grp: E Occupancy Load: 12%State Surcharge-Building 08/20/2015 $45.35
Dwelling Units: 0 Plan Review 08/12/2015 $245.64
Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 08/12/2015 $151.16
Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Sm$0.50(up to 08/20/2015 $0.50
Value: $20,000 11x17)
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $820.55
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Yes Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
7
Issued By: flee Signature: _ ail#.e 11-� L
.639.4175 by 7:00 a.m.for the next available inspection date
This permit card shall be kept in a conspicuous place on the job site until completion of the•roject.
Approved plans are required on the job site at the time of each inspection.
' Building Permit Application
Commercial RECEIVED I OIt ()Iii( i I 'NI O\l 1
City of Tigard Received
g AUG 12 2 015 DateB : d �e7 /j r Permit Nq�f(# o 5 6��!y/
• 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Rene%�j,
0 Phone: 503-718-2439 Fax: 503-598-1960 Date/ : +g` r� Related Permit:
I i c, \I I) Inspection Line: 503-639-4175 CITY OF TIGARD Date Ready:y: Q / Juris: H See Page 2 for
Internet: www.tigard-or.gov BUILDING DIVISION Notified/Method: V 1 '//� Supplemental Information
t
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
►� •ddition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
work indicated on this application.
❑ 1-and 2-family dwelling ❑Comercial/industrial Valuation: $
m
❑Accessory building ❑Multi-family Number of bedrooms:
❑Master builder P�Other:g 6,10 l Number of bathrooms:
Total number of floors.
Job site address: 'f) . / BIC ngi` New dwelling are square feet
City/State/ZIP: ` i Garage/carport ea: square feet
Suite/bldg./apt.#: i• Project name: .I , 1t Covered porch area square feet
►,iZts I_ _
•
Cross street/directions to job site: Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: I Lot#: Permit fees*are based on the value of the work performed.
Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
work indicated on this application.
�
� Valuation: $ 2/0, 000
A i Dr5 in , t, • � `
�1/► Existing building area square feet
GyI
New building area: square feet
' ' t' ❑ TENANT Number of stories:
Name: k Mir♦ *MO' Q� ` Type of construction:
Address: LA A , 11 Occupancy groups:
City/State/ZIP: `/ 1�0 ‘ ‘q fZZ 3 Existing:
Phone: 6 0 oil 1, Fax:( ) v New:
■ APPLICA • '-' I CONTACT PERSON
Business name: I �
�' ; t ` il & Structural plan review fee(or deposit):
Contact name: AAA /
' , I [, , FLS plan review fee(if applicable):
Address: —
r Total fees due upon application:
a ication:
City/State/ZIP: �ii,r�, rJ �lh��
Phone: u 0 • �� Amount received:
l Fax: :( )
E-mail: /' ,, M n , , ~ . ♦ G-
Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System.
Business name: i r rr ter` ` I j Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address: Solar Installation Specialty Code checklist.
City/State/ZIP: Permit fee(includes plan review
and administrative fees): $180.00
Phone:( ) I Fax:( ) State surcharge(12%of permit fee): $21.60
CCB Lic.: al I ` 74, Total fee due upon appication: $201.60
Authorized signature: A fir This permit application expires if a permit is not obtained
� within 180 days after it has been accepted as complete.
Print name: "Dim 4110 ,y / Date:ft t2,/r5— * Fee methodology set by Tri-County Building Industry
11111111 Service Board.
I:1Building\Permits\BUP COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB)
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
■
• Accessibility: Barrier Removal Improvement Plan
Commercial & Multi-Family - Additions or Alterations
I ('A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014
.- -
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
iI " Plan Submittal Requirements
Commercial & Multi-Family - New, Additions or Alterations
I c'`\ D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with:
A. ❑ map&tax lot# ❑ project name ❑ site address ❑ suite number
❑ zoning ❑ applicant name ❑ phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the"Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit-based on valuation of project.
4. ADDITIONAL INFORMATION AS FOLLOWS:
A. Fire Department Building Survey with (1) additional full set of architecture
drawings.
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
11 " Plan Submittal Requirements Matrix
Commercial & Multi-Family - New, Additions or Alterations
T I G n R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
ype o u animal o ans
(Includes new,additions and alterations.) Required at
us Submittal
Demolition Permit
(site plan is required showing location and square footage
of all buildings to be demolished,erosion control plan and
tree protection,if applicable)
Site Work
(must include location of all accessible parking)
Plumbing (site utilities)
Building 3
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Solar Photovoltaic 2
(Requires check list for prescriptive installation. If not
prescriptive installation,engineering is required.)
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County, and Tualatin Valley Fire &Rescue),if applicable.
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014
Location:
Record Type:
Inspection Type:
Result:
Comments:
Inspection Date:
Record ID:
Inspector:
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
8200 SW PFAFFLE ST, TIGARD, OR, 97223
Commercial - Building
299 Final inspection
PASS - No C of O
BUP2015-00241
Chip Barnett
Violation Summary:
Inspector Contractor