Loading...
Report -f TM RIPPEY _ Field Report CONSULTING ENGINEERS {�� �f 00�� 7650 SW Beveland Street Phone: (503)443-3900 �'`�'^��� Suite 100 Fax: (503)443-3700 Tigard,Oregon 97223 I o 130 S w. ,t/(h-g y_s Av( Issue Date: 8/11/15 PROJECT INFORMATION Project Name: Scholls Business Center—BLDG D Project#: 15125 Owner: KG Investment Permit#: SITE INFORMATION Location: Site Observation Date: 8-10-2015 Observation Time: 10:00am Weather: Sunny Temperature: 80 Deg. Contractor: Cotton Present On-Site: Brandon Messerly—Cotton Bob—Five Star General Contractors OBSERVATION SUMMARY Area(s) Observed: Roof Nailing Purpose of Observation: Compliance with design drawings. Estimate of Progress: 100%Completed Workmanship Level: Fair DISTRIBUTION Copies to: Brandon Messerly-brandon.messerly @cottonteam.com TM Rippey Consulting Engineers 7650 SW Beveland Street,Suite#100,Tigard,Oregon 97223 (503)443-3900 Fax(503)443-3700 Project Name—Field Report Date Page 2 of 2 PREVIOUS OBSERVATION ITEMS Note: Listed below are items noted in previous field observations that have not been addressed to date. Items noted in this or previous f eld observations must be addressed and documented for review v by all affected parties to be considered as closed. CURRENT NOTED ITEMS ISSUE: SOLUTION: 1. The typical spacing of the roof nails was The general contractor was notified of the issue observed to be greater than the maximum 6" and told to re-walk the entire area and add nails allowed in keynote 5 on sheet S2.1. at any location where the spacing exceeds 6 inches. UPDATE: TMR verified on 8-11-2015 that additional nails have been added and the nailing now meets the requirements of keynote 5 on sheet S2.1. Any work observed and noted above shall not be considered a waiver of the duties and responsibilities of other parties or of the requirement of strict compliance with the Contract Documents and the intent of the project plans and specifications. This report shall not be considered to specifically address every detail or location of the work in progress, but is rather a general observation of field conditions of the day of the report. Submitted by: Kyle Kruger TM Rippey Consulting Engineers TM Rippey Consulting Engineers 7650 SW Beveland Street,Suite#100,Tigard,Oregon 97223 (503)443-3900 Fax(503)443-3700