Loading...
Report 7409 SW Tech Center Dr,Ste. 145 �I M' Tigard,OR 97223 " F Ph:503-443-3799 Fax:503-620-2748 503.4413799 Special Inspection Final Report Date:09-18-2014 Job#14-4763-D35 Permit#BUP2014-00194 Mail To: Project: NORTHWEST HANDLING SYSTEMS ERNEST IMAGING 18008 NE AIRPORT WAY 6777 SW BONITA RD STE 100 PORTLAND, OR 97210 TIGARD, OR 97224 PO#03ER140804A To Whom It May Concern: ACS Testing, Inc. attests that their inspectors performed special inspection(s)on a continuous and/or Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed For the following. Proprietary Anchors- Expansion Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications, and the applicable codes and standards for the jurisdiction. Approved by: _ Bob Brown/President BB/KP i Proud to be Nationally Accredited by International Accrediting Service ACCREDITED