Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Correspondence
• ae,t/ e/y-00036P RECEIVED KLEINFELDER MAY 21 2015 Bright People.Right Solutions. CITY OF TIGARD BUILDING DIVISION LETTER OF TRANSMITTAL TO: MACERICH DATE: February 3, 2015 MR. ROLAND MOLIMARD KLF PROJECT NO: 20150914.001A 401 WILSHIRE BOULEVARD, SUITE 700 SANTA MONICA, CALIFORNIA 90401 RE: Washington Square Too Shopping Center We are sending you via e-mail the following items: El Prints ❑ Invoices ❑ Shop Drawings ❑ Specifications ❑ Reports ❑ Disk(s) ® Copy of Letter/Memo ❑ Other COPIES DESCRIPTION DATED 1 Final Letter 12/19/2014 These are transmitted: ❑ For Approval ® For Your Use ❑ As Requested [' For Review& Comment Remarks: Kleinfelder appreciates the opportunity to oversee special inspection services for the Washington Square Too Shopping Center project. This work was performed in a manner consistent with local practices at the date the services are provided. Our conclusions, opinions, and recommendations are based on a limited number of observations. Kleinfelder makes no other representation, guarantee, or warranty, expressed or implied, regarding the services, communication (oral or written), report, opinion, or instrument of service provided. KLEINFELDER Catherine Ellis Senior Project Manager 20150914.001A/POR15T13618 February 3, 2015 ©2015 Kleinfelder 9200 SW Nimbus Ave., Suite A, Portland, OR 97008 p 1 503.644.9447 f 1 503.643.1905 .r,r,tr 7409 SW Tech Center Dr,Ste. 145 Tigard,OR 97223 Cwcrr.•U Ph:503-443-3799 Fax:503-620-2748 "R% rl%TING,Ise 503.443.3799 Special Inspection Final Report Date: 12-19-2014 Job# 14-4780-D05 Permit#BUP 2014-00038 Mail To: Project: KLEINFELDER WASHINGTON SQUARE TOO 9200 SW NIMBUS AVE. 9585 SW WASHINGTON SQUARE BEAVERTON, OR 97008 BY THE RED ROBIN PORTLAND, OR 97223 To Whom It May Concern: ACS Testing, Inc.attests that their inspectors performed special inspection(s)on a continuous and/or Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed For the following: Proprietary Anchors—adhesive Proprietary Anchors—Cast in Place Steel Construction Concrete Construction Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications, and the applicable codes and standards for the jurisdiction. Approved by: Bob Brown/President BB/KP • Proud to be Nationally Accredited by International Accrediting Service ACCREDITED