Loading...
Report (5) Deno v►uce .3.3U-YIJJ Geotechnical Office (503)601-8250 Carlson Testing, Inc. Eugene Office (541)345-0289 Salem Office (503)589-1252 • Tigard Office (503)684-3460 March 20, 2015 RECEIVED Michael Kors MAR 3 0 2015 1 Meadowlands Plaza CITY OF 1'IGARO East Rutherford, NJ 07073 BUILDING DIVISION Attn: Glenn Divincent Re: Washington Square— Michael Kors—SP#G06 — Store Front 9620 SW Washington Sq. Rd. —Tigard, OR Permit No. BUP2014-00259 NCL UPDATE CTI received and reviewed email from Engineer of Record dated 03/20/15, which resolves NCL item #2 on the Incompleted Items List (NCL). Please see the attached updated list for further details. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Sincerely, CARLSON TESTING, INC. ith R. G Project Manager KG/jk Attachment cc: Michael Kors — Glenn Divincent Glenn.divincent @michaelkors.com City of Tigard Building Division —Walter 'Chip' Barnett James Agresta (JA) Carpentry Inc—Will Chace Will.chace @jacarpentryinc.com 03-20-15 COV 11503500 Upd'd 04122111 • Carlson Testing, Inc. Incompleted Items List (NCL) Mar 20,2015 T1503500. Project Name: WASHINGTON SQUARE — MICHAEL KORS — SP#G06 — STORE FRONT Project Address: 9620 SW WASHINGTON SQ RD TIGARD OR Permit No: BUP2014-00259 P.O.No: Project Manager: KEITH R. GAUVIN Item# Insp. Date Item Description Compliance CTI Sign-Off Corrected 1 JP 03/05/2015 NEED WELD PROCEDURE FOR REWELDING OF BASE PLATES. WELDS AT BASE PLATE J. PILAND 03/09/2015 GROUND OUT AND WELDED WITH FCAW PROCESS. 2 JP 03/12/2015 (1) WELD COULD NOT BE ACCESSED AT SOUTHWEST ACCEPTABLE PER ENGINEER KEITH R. GAUVIN 03/20/2015 COLUMN TO 4'-8" LONG 4"X14" TUBE STEEL X 3/8" OF RECORD EMAIL DATED BEAM CONNECTION SOUTH FLARE BEVEL VERTICAL WELD 03/20/15. (NOT WELDED) . (OVERHEAD AND FLAT FILLETS AT CONNECTION WERE INCREASED TO 1/2") NEED ENGINEER OF RECORD APPROVAL. DETAIL 1/S201. CC:MICHAEL KORS — GLENN DIVINCENT CITY OF TIGARD BUILDING DIVISION — WALTER 'CHIP' BARNETT JAMES AGRESTA (JA) CARPENTRY INC — WILL CHACE Page: 1