Loading...
PFI2015-00102 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT _ COMMUNITY DEVELOPMENT Permit#: PF12015-00102 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 08/04/2015 Parcel: SEG1118 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: Adjacent to 10160 SW Walnut St. Install 2"PVC conduit and wire from existing pole 2070 approximately 100'down Walnut St. (Pacific Evergreen Homes-Graceland). Owner: FEES Description Date Amount PHONE: Contractor: PHONE: FAX: Applicant: TIMOTHY BELL 10800 SW AVERY ST TUALATIN, OR 97062 PHONE: 503-672-5481 Total $0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: Not Present Issued By: Special Conditions Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12015-00102 Type: Condition Name: Status: Severity: PFI—Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI—Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI—Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI—Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs,pavement markings, mailboxes,etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept.of Transportation, FHWA,current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI—Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI—Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI—Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI—Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI—Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI—Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080.Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI—Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary,as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the city's inspector Kenny Fisher 503.816.6146(cell), 503.718.2602(office), or kenny@tigard-or.gov TWENTY FOUR(24)hours prior to commencing work, prior to any staged inspection,AND after completing work covered by the permit. PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance,and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans,and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector,in writing, of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice RECEIVED City of Tigard JUL 2 3 2015 Igq PUBLIC WORKS—ENGINEERING PGE WORK ORDER# MCM29fTIGARD PLANNING/ENGINEERING Public F,acitity Improvement (PFI) Permit DESCRIPTION OF WORK(in the right-of-way) REQUIRED SUBMITTAL Check one: ❑ Utilities R Sidewalk/driveway approach ❑ Street improvements ELEMENTS Detailed description: INSTALL 2" PVC CONDUIT AND WIRE B Minor work in right-of-way (sidewalk repair,curb cut,street FROM EXISTING POLE 2070 APPX 100' DOWN WALNUT ST opening,etc.)requires: (PACIFIC EVERGREEN HOMES -GRACELAND) •Application form,completed and signed •Submit one(1)copy of scaled sketch Property address/location(s): 10160 SW WALNUT STREET of the proposed work to be done jj ]� •Submit one(1)copy of traffic /�— control plan OR- Applicant's name: TIMOT BELL FOR CHRIS JEWETT E] Substantial project work requires PP above items and professional Address: 10800 SW AVERY STREET engineered plans for: TUALATIN, OREGON 97062 -Street widening Ci /state: Zip: •Subdivision infrastructure Phone: 503-672-5481 Email: T&DSUPPORTAVERY@PGN.COM •Main utility line extension: Storm Drain,Sanitary—Tigard Water--Tigard Water Service Contractor's name: N/A Area(includes Durham,Icing City CCB#: Expiration: and a portion of unincorporated Washington County) Address: City/state: Zip: DELIVER APPLICATION TO: City of Tigard Phone: Email: Planning/Engineering 13125 SW Hall Blvd. Engineer's name: NIA Tigard,OR 97223 Applications for"ttwtor work in right-of-way" Address: only may be emailed to: City/state: Zip: ro�l7ermitsdt1igard-or.gov Phone: Email: FOR STAFFUSE ONLY Estimated value of work (within the public right-of--way): $ Case No.: Pj cam"s-- av) Application submittal fee: _ Is work related to a LAND-USE DECISION? ye ® No Application accepted: If so,please specify (MLP,SDR,SUB,etc.) c #. By:L— Date: AT ��(4+�0�2Appticarion reviewed: Is work related to a BUILDING PERMIT? ❑ Yes W No )� By.1�_ Date: If so,please specify(BUILDING PERMIT)case#: Applicant notified: By:�_ Date: O I� t:\CURPUI\M ntea\t.nd use AOPtiotscm Rea 07/16MI4 _ drxsar+aa�rec� City of Tigard - 13125 SW Hall Blvd. - Tigard,Oregon 97223 www.tig-ard-or.gov - 503-718-2421 • Page I of 4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work. *When the owner and the applicant are different people,the applicant must be the purch2sef of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any deed restrictions that may be attached to or imposed upon the subject pig r�tv. • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in the plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. SIGNATURES of each owner of the subject property required. 1 TIMOTHY BELL FOR CHRIS JEWETT 7/22/2015 App can / uthorize Agent's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 Page 2 of 4 6.4.4 VAULT WITH 7-TERMIDUCTS SUBDIVISION LEGEND M °b' DIeN.i rNaroxM!MD,Rn IAA / NEW PGE FACILITIES TO BE INSTALLED sRY OR r.Raro,aA i -- cvMufce lDAI ANr apwnpine Plr•8D7D (UNLESS OTHERWISE SPECIFIED) mucTAe 6 r >m6'AM!OI d �°� M�^ B 15 316 6 3 , MONDED S NSi F�9r CUSTO EF RMN rM A A F 02071 2015 2.. M7TALL cN 1990-4 CoNDUR �*\ MEE FlAING AS NOTED TM fRCpAYY vAUtr, IROV10[D{R4TM 3lD Rr LIAICMAFR YC)OrlNDD1M7LICI O I INSTALL 2'POLE CONDUIT UNIT 0____. dAL 1-02 AR IRY ARY M 2 DD ""/ 12'°RA`L '",2`o E°' � a� -------- µw M IKPLANNIN ENGIN LIGHTNING ARRESTER 010MA MSTAUM OV C(TOAER oLrrn Ron.[ri51 - CUS/OAAR To MRTAII rrAc COlilm R SR4-LM PO �E G R nmL m AI-w soma � o rLaaw 1 -142 00006 E NATURAL DAs CDNDUR R.M,n RRD Ra ON r F 1 00 T O 1962-3C A STtw LGN,slue P US "R'A4O�� PL02071 CTQMER PROVIDED 6 IN7TALLED PYC CONDUD `"°sow" '""`�j IOF C 'REFERRTO S!y B 25 52625 FAXTVGNDNG r STIIEFTUCM f JOR FOR 5� CMDUR.) T(Vial �� STREEtUGM IIIHRION 1- 2 —2. ROX•' RrcONOMT-srRerT RM oNLn P 2077 0990045 <� I DO WrTH SLCST * ICF v26 srtlCr sox ,� ST NwN CONS" fIQT r arorTr'iDLl�.rL7N•OM14+1;�E.. 'nw.R!M�o�e'r wr!'•Y�1•P,:!LR•H:R,RI•Pr';,.Il T;L•AI�;:�� .L.sa�n•'"wi'"ec,eMc n� % ♦ 4�M.L{' /{'SO r•P I • j 0 AA� �A�lDOMaOm u.bARRAM.v�EIorObYow�eeD.nWW+i.°RrilLc°.LRMdc oRo On4'1roHD1"RmR1I1O^xImMHALi',xcMMi.Rlw.wI�1DflRD/wnnI4roIi"RwI!r1o�Iw�+MIeA!wIro Q°C1wF^wMr�AMOd4R.i!rterALE.RLg1!LMsIiY!�H.�rTRe.^r�Ln,v°�RU.o.MT•.fOfY.wRI.Mn1rr1NDMRlr]^i-".AoPYwOar.RrnDiulreaaMIXw�wAO"•im Ir.R E%r`<DLRR,`wRReR.NwR°R.r.!RO6^M7.sO wP«�IaeiM°•wm66`p R'"dO'r1�iDnARar>'xwT'"•sI tiNpruM�aRn�.s{.Y'mKqMrrII.Mu•,fR.A1L,�Wf�sr.roe•nLFrrl"pNrLW/aO�e w"rr+ucwR!'.l"RrR,ab/"R..�xIrOsrr"r.e:iwI1rlarauQ'DIoMRR+s./elnasSi6MVR,Rw�Ri.r,.rey!Il.abn1rRLP e rw"u.u•rmtwo"P�Mf'RMcWrr,rI.e... rf YrgRIwN mYR.irM'r�.s rKT�l•rO..0 RrRMTr�a1rN�r1Ap aNwO"IA R AsaY'I. �werIm I �Matlpx—bw PAD X111 3 007'7 90-35 INSTALL 7200V 195 PAD MT 50 Cp 720240V 37KW DEMAND I@ 7KW TOR o ` O7C-- 2069 7-wl'— /C 50 CONSTRUCON NOTES: 1990-40 0011 V 00123 WR CHECKLIST REM YES COMMENTV 1 DOM I --ROAR Dom .l Dor.a1A 1 fl m1 Y aR1RR iM 1 A TWO ^ PO 00022 160' . R APC .. TRRORMoboL.uLeLnM �pMRR�pp��RAR1 /prl nl `,'.., R LOCATES �pKr/Wt SdOLG b�D SIurr6D TRJR ADAATlRO2lNluMegmM—ARM�rtLsM1'W F \ RAO ' F A ORTOMA ro Ab RlTA4 P{R{{R!MAW MM I4iIM�rirb CMa �� UTNRY VN.ILT.NWR rrr AT ATPRpLMyeMr 0 pR FAp Mp r!•RT iRMWFO.IMEb. � rADv.Lar ro rMN um IA oma oN aq. / \ 24 j/ PB1ND s now /M TRYAIIOIip AMIrT!WRIIW f 1!r{1 A RNW!AM•�• R At M,uRer,M 9 Nn�aE,�R,Nn M 1RWI M N11RMlIOOMb // MRC RM ( 7.�M�IpIT.Ab Ap1I0 TprPOaAMtl TMI,b RPofeD / \\ Cl/IRHf a RRTra vALaT ro MEIn AT IRLw~If MnE/Mp 04.'N wr Mro LG a ftCOWIXIEµ,�o� R+ra mE vrxt si LwLa RNoc*am rrtw-+-wrn: 9cm0L4011r PRF RFE 9R mAEII�I UTRRY I,RAMM R.u.rf ro!R rm pwl. \ \ O 3574 '"700" POLE NEEDS TO COWAV Onau'R COW ■ }Mm IRe RRlrRRATM r Mw wAo4 TARRVR,AAM IDAIw PPED IN G.I.S. �.�� D]wAM O 1RrcID.•RNCDIITRLKrIDH COIPa4rID..ICLLoeD M na ca+..Hv/ouv,roa rAK mCO.UH.Aw ou. \ MI G 4 Deva+R Mrm DH TMi,rD lvEµrRGRDui[DIIARNI riNJTANDAo 0AR IRR ro nr�'Ou'Oosro.MRFawwrNr oma.A,- AS-BUILT T...AS-BUILT VERIFICA7, 8 NESC VIOLATIONS CORRECTED Sy �+ 1Oo1O � FMRIIAp1: Owa: �J � yr 0•-A••r• (� GMHrrd FvnrrAlA: Dom: RO Sp O .. / for now LaRrw.DES d., Q T� SDPA6£NG REVIEW: ASRUK/n DESIGNER: \ w. _ArrKT COORDINATOR uT 1A7017 •- P-60' •KAT'1070001 •�`� X)0DDDR716 MI678701 O IRICe b!411CRI COORDINATOR TO _ O II,WirrMr n Wrl llp■w R v PACIFIC EVERGREEN HOMES-GRACELAND l r K m n. r.r ,' tutor va 1303-736.S{!0 S02-d{1�26RISAlGQ / 7M.MD-17762 17.22 CALL III BEFORE YOU DIG �El L-- ~ 4• p OBELION LAW WXAW YOU TO RO RUL[s ADO"80 )0160 SW WALNUT S7 P �• MG LWr AI WAY fERMIf NOTICE: c THINK RY Rn IX"AR 91 NorW GO 24R)Ct" DeIfxr T o A Pawn naw re4 Iaat ARI®ICItON s IOOISelo2 R[IDC A!M SAFETY w011 M Im NOM-0M1WAY MAT N PLVORAtO.CRAY Poe A"AO Trlofe�!]�-0OL�OOPO.YOI/Mj MAY Ow—Cosa PM Exr ro d LOT sURDMnON 12o2A0 R M CONAACTIM AND COImACrOR3 WNO HAYR AMPS OTO VECW "n M OwLMO T ORMODH UTU" �� ATHW INGiCM D2T-Ole rORS WnH FIRS11 AORHM Wmf FGM WILL R AUOMM TO WOK MM Mn MIMET TION CRROI ADWNWUTKW 4 Bos-7s}MA THE CONTRACTOR MUST HCTIY THE LOCAL AWJUW ON p HOwtt TO REpIEST UTRITY LOUTFS CALL TNf OREGON w 04v ~ 'n RrDIR(T4 LIRAIAN n R[FOK WdR(P TO ROM.A COPY OF THE FW/ff MW E ON SITE UTam'HOTRCAis01/ANTER m AT lfASi 81114��~�• liAwL-nor �S KWFfl 677-9/87 SANE WHITNEY 2 RWIISR DAYS MOOR TO DCAVµ1CN, YRIN4IA� OPORRANO ONLRAL ft Crwc CO-Au 4 m fjuM CUn ONO(Wl� NN9O fY � CD 3 a a 0 Single Flagger Operation Cr 3 for Low Volumes (Optional; o' Q rn Ln (ADT<400) .•r I :3 W o o D ^ BE2) 00 ONE LANE N PREPARED Op iO �1•e I•a?•C�► TO STOP ROADAHEAD r ROAD 3 <i WOF�C KC K•K•K• l� AHEAD) "n y 000-4 • 1 mile M max. - — 2) —• • • • • • • to j • • to O • C—_B-�B AIS^ Buffer Protection Vehicle w/TMA(both Optional) ROAD • WORK See Chapter 4 v AHEAD, BE C ONE A p� TO s oP Two Flagger Operation 'a w m (Optionaq IN) OD 'O Zn Z � rn Z c C7 r m - z � �, m Z > o M :X) 'Ln m � v � z