Loading...
Plans M C2012 00402 SYSTEM DRAWN BY: GCB CHECKED BY: GCB MECHANICAL EQUIPMENT SCHEDULE DESIGN APX1201 CONSULTANTS INc. SYMBOL DESCRIPTION ELECTRICAL 1515 SE WATER AVE. SUITE 400 ' PORTLAND OREGON 97214 503-248-0227 FAX 248-0240 RTU-6A ROOFTOP CONSTANT VOLUME AIR HANDLING UNIT — ELECTRIC COOL / GAS HEAT: 2,000 CFM 12.3 MCA CONTACT: GARY BARNES SUPPLY AIR AT 1.25 INCHES W.G. EXT. STATIC PRESSURE. 1,435 CFM RETURN AIR, 565 CFM 20 MOCP MECHANICAL LEGEND MINIMUM OUTSIDE AIR, VERTICAL DISCHARGE, BELT DRIVE, POWER EXHAUST FAN, ECONOMIZER, 480 V. 3 PH CD 15 SEER MINIMUM COOLING: 47 MBH SENSIBLE / 64 MBH TOTAL AT 95-F DB ENTERING CONDENSER 1—POINT {' G NATURAL GAS RTU-6A � �E RTU-8 TEMPERATURE, 80°F DB / 670F WB ENTERING EVAPORATOR COIL CONNECTION SHUTOFF VALVE, BALL VALVE µ `3/4"G 80 MBH 80 MBH HEATING: 80 MBH INPUT / 64 MBH OUTPUT, 1—STAGE NATURAL GAS BURNER -' Ni "` '� EXISTING P T 153' DEVELOPED 112' DEVELOPED BASIS OF DESIGN: TRANE YHC060 — HIGH EFFICIENCY —l�F— PETES PLUG, CHECK VALVE RTU-6B LENGTH TO METER0 E 3/4"G LENGTH TO METER OPERATING WEIGHT = 1050 LBS 4 2012 �\\ 80 MBH �O PIPE UP INFINITE H �` ® 2 PSI RTU-6B ROOFTOP CONSTANT VOLUME AIR HANDLING UNIT - ELECTRIC COOL / GAS HEAT: 2,000 CFM 12.3 MCA 4'1'C'`�'(�!�]' RIS 142 DEVELOPED 3/4-G SUPPLY AIR AT 1.25 INCHES W.G_ EXT. STATIC PRESSURE. 1800 CFM RETURN AIR, 200 CFM 20 MOCP PIPE DOWN �'�"� '"`% .'av ��lN ARCHITECTURE :VELOPED LENGTH TO METER TO METER MINIMUM OUTSIDE AIR, VERTICAL DISCHARGE, BELT DRIVE, ECONOMIZER, 15 SEER MINIMUM 480 V, 3 PH COOLING47 MBH SENSIBLE / 64 MBH TOTAL AT 950F DB ENTERING CONDENSER SUPPLY AIR RISER P.O. Box 664 TEMPERATURE, 80°F DB / 67°F WB ENTERING EVAPORATOR COIL 1-POINT Donald,OR 97020 HEATING: 80 MBH INPUT / 64 MBH OUTPUT, 1-STAGE NATURAL GAS BURNER CONNECTION (b) 503.989.2992 3/4"G BASIS OF DESIGN: TRANE YHC060 - HIGH EFFICIENCY 160 MBH OPERATING WEIGHT = 1050 LBS RETURN, EXHAUST AIR RISER (17 503.976.9013 c� RTU-6C ROOFTOP CONSTANT VOLUME AIR HANDLING UNIT — ELECTRIC COOL / GAS HEAT: 1,600 CFM 12.3 MCA infinitearchitecture@wbcable.net 1"G3/4"G SUPPLY AIR AT 1.25 INCHES W.G. EXT. STATIC PRESSURE. 950 CFM RETURN AIR, 650 CFM 15 MOCP SQUARE TO ROUND TRANSITION MINIMUM OUTSIDE AIR, VERTICAL DISCHARGE, BELT DRIVE, POWER EXHAUST FAN, ECONOMIZER, 480 V, 3 PH G G 15 SEER MINIMUM G COOLING: 37 MBH SENSIBLE / 50 MBH TOTAL AT 95°F DB ENTERING CONDENSER 1—POINT � PRO \_RTU-6C TEMPERATURE, 80°F DB / 67°F WB ENTERING EVAPORATOR COIL CONNECTION WALL MOUNTED �`' GINEE��Jia 80 MBH HEATING: 80 MBH INPUT / 64 MBH OUTPUT, 1—STAGE NATURAL GAS BURNER THERMOSTAT 102' DEVELOPED BASIS OF DESIGN: TRANE YHC048 — HIGH EFFICIENCY WALL LENGTH TO METER OPERATING WEIGHT = 1050 LBS CO2 �� DIOXIDE OSE SENSOR UNTED CARBON RTU-8 EXISTING ROOFTOP CONSTANT VOLUME AIR HANDLING UNIT — ELECTRIC COOL / GAS HEAT — i oK (EXISTING) c 13�RRNt�S C. B RTU-9 EXISTING ROOFTOP CONSTANT VOLUME AIR HANDLING UNIT — ELECTRIC COOL / GAS HEAT: — MITER ELBOW 1"G EXPIRES 12/31/13 2SPi (EXISTING) 2,000 CFM SUPPLY AIR, 1850 CFM RETURN AIR, 150 CFM MINIMUM OUTSIDE AIR TURNING CARRIER 48DJD060 VANES 410 MBH MUA-1 ROOFTOP MAKE—UP AIR UNIT — 3700 CFM AT 1.25 IN. EXTERNAL STATIC PRESSURE, 100% 2 HP c� EXISTING GAS PIPING OSA, DOWNFLOW, STAINLESS STEEL HEAT EXCHANGER 480 V, 3 PH 0.25W & 4"Mi BELOW ROOF TO BASIS OF DESIGN: TRANE AHAA200C EXISTING TENANT GAS OPERATING WEIGHT = 975 LBS 45,E BRANCH TAP (RTU-7, RTU-9 AND MUA-2 ROOFTOP MAKE—UP AIR UNIT — 3800 CFM AT 1.25 IN. EXTERNAL STATIC PRESSURE, 100% 2 HP —►�W�— DUCT HEATER) 600 OSA, DOWNFLOW, STAINLESS STEEL HEAT EXCHANGER 480 V, 3 PH MBH TOTAL HEATING: 250 MBH INPUT, 192 MBH OUTPUT INDIRECT FIRED NATURAL GAS G BASIS OF DESIGN: TRANE GRAA25 2SPI CONNECT TO METER SERVING OPERATING WEIGHT = 1400 LBS WARNING: APEX. COORDINATE WITH THIS TYPE OF FITTING IS 2 PSI GAS PIPING SIZING BASED ON 10 PERCENT 1-1/4"G NORTHWEST NATURAL AT SITE BEFORE THE START OF ZERO INSIDE PERMITTED N OT PRESSURE DROP AND A GAS OF 0.6 SPECIFIC GRAVITY 490 MBH CONSTRUCTION_ RADIUS GAS METER(S) SERVING TENANT. W � RADIUS ELBOW R 1 GAS PIPING DIAGRAM R=W _ mi 01 DIAGRAMMATIC FLEXIBLE GASKET (SUPPLIED DUCT WITH CURB) NAILER STRIP 1/D -----� MANUAL VOLUME MECHANICAL SEISMIC DESIGN CRITERIA .i M.F METAL FLASHING - 12" O.C. DAMPER i SET IN CAULKING o OCCUPANCY SEISMIC COMPONENT 3 RIGID INSULATION MOTORIZED DAMPER. NOTE: ACTUATOR BUILDING SYSTEM CLASSIFICATION DESIGN CATEGORY IMPORTANCE FACTOR (Ip) FLASHING - CSPS MEMBRANE SYMBOL IS DIAGRAMMATIC ONLY - EXACT cn ' II D 1.5 ROOFTOP UNITS (NATURAL GAS) LOCATION OF ACTUATOR TO BE FIELD DUCT ROOFING COORDINATED FOR PROPER ACCESS NATURAL GAS PIPING SYSTEM II D 1.5 CANT STRIP THROW PATTERN D 1.0 r Q OTHER HVAC COMPONENTS II - LEVELING STRIP OR TYPEam < NECK - ROOF DECK SIZE GRILLE/DIFFUSER X APEX LABS - -_ _ 8x8-4W DESIGNATION ZONE CODE EXISTING 150 PRIMARY VENT. RTU MAKEUP MAKEUP CFM uj AIRFLOW OSA OSA OSA OSA CFM CFM CFM CFM CFM CFM CFM OCCUPANCY SUPPLY OUTSIDE RETURN EXHAUST OUTSIDE MAU-1 MAU-2 THIS DETAIL DENOTES GENERAL FLASHING AND CURB SA DIFFUSER CONFIGURATION. VERIFY THE EXACT REQUIREMENTS OF CATEGORY AIR AIR AIR AIR AIR AIR AIR THE EQUIPMENT CURBS AND THE ARCHITECTURAL ROOFING SYSTEM USED. INSTALL CURBS IN ACCORDANCE WITH THE OPEN TESTING 120 SCIENCE LABS 2000 565 ROOFING MANUFACTURERS INSTRUCTIONS. COORDINATE RA GRILLE J U TOTAL RTU-6A 2000 565 1435 565 WITH ARCHITECTURAL DETAILS AND SPECIFICATIONS. ABBREVIATIONS J W a- DWING 117 , EXT 119 SCIENCE LABS 135 270 4200 0� Z c?) STORAGE 116 OCC. STORAGE 525 105 2 RTU CUR AIL 8— ROUND DUCT DIAMETER, INCHES OBD OPPOSED BLADE DAMPER 0O 0 ti DIAGRAMMATIC TYPICAL ROOFTOP AIR HANDLING AND MAKEUP AIR UNITS 1 X RECTANGULAR DUCT SIZE, INCHES OSA OUTSIDE AIR X W rn SEMI VOLS 115 SCIENCE LABS 765 355 1800 mi 01 2 s L z ' a EXT ANNEX 118 SCIENCE LABS 350 110 825 M/D MOTORIZED DAMPER RA RETURN AIR uj m 0O METALS PREP 114 SCIENCE LABS 225 135 875 BDD BACKRAFT DAMPER SA SUPPLY AIR M p � � CORRIDOR CORRIDOR 0 30 TOTAL RTU-6B 2000 1005 1800 7700 200 3700 3800 DIF DIFFUSER SD/FLD COMBINATION FUSIBLE LINK a N EA EXHAUST AIR AND SMOKE DAMPER d CORRIDOR CORRIDOR 100 30 FLD FUSIBLE LINK DAMPER TRANS TRANSFER RR /C-2 RESTROOM 50 0 TYP TYPICAL DI ROOM 117 OFFICE 175 65 UNION BREAK ROOM CONFERENCE 200 105 PRESSURE REGULATOR, SYMBOLS REVISIONS WASTE PROC 105 SCIENCE LABS 150 150 650 COORDINATE REQUIRED CONFERENCE 124 CONFERENCE 300 150 PRESSURE W/EQUIPMENT © CONNECT TO EXISTING ® RELOCATE EXISTING 250 5 MANUFACTURER. C 1 OFFICE (122), (12 OFFICE � EXISTING TO REMAIN 0 REMOVE EXISTING TEST FITTING O 375 75 P CAP OR PLUG 1 OFFICE 121 OFFICE SHUTOFF VALVE - TOTAL RTU-6C 1600 650 950 650 650 AGA AND UL APPROVED FOR NATURAL GAS SERVICE CITY OF TIGARD OFFICE 101 OFFICE 285 35 GENERAL PLUMBING NOTES Approved.... 5�� 6" DIRT LEG MANUFACTURED PIPE Conditionally Approved..............[ ] OPEN OFFICE 103 OFFICE 865 80 ROLL STAND, PROVIDE See Letter to:Follow..................[ ] SAMPLE REC 100 OFFICE 400 35 PRESSURE TREATED WOOD 1 INSTALL ALL PLUMBING WORK SO AS TO AVOID INTERFERENCE Attac e ................ TEST FITTING BLOCKING AS REQUIRED - �+L, (a.' v�0�U CORRIDOR CORRIDOR 0 30 WITH ELECTRICAL AND MECHANICAL EQUIPMENT AND STRUCTURAg�N ber: PRN OFFICES 102,104 OFFICE 250 25 WITH MASTIC (TYP) AD FRAMING_ A PRN OFFICE 105 OFFICE 200 25 02 COORDINATE ALL REQUIREMENTS FOR ALL POINTS OF By: Date: 2 TOTAL RTU$ 2000 230 1770 230 (TMP)WALK PAD CONNECTION WITH THE GENERAL CONTRACTOR AND OTHER TRADES PRIOR TO BID. 0-T-C HVAC LEGEND, 3 RTU GAS C 0 N N E C TI 0 N DETAIL Q ALL VALVES, UNIONS, ETC. TO BE SAME SIZE AS LINE SIZE ��,� SCHEDULE AND KEITH 108 1100 105 OFFICE UNLESS OTHERWISE INDICATED ON DRAWINGS. GPC'S 110 SCIENCE LABS 450 190 M 101 DIAGRAMMATIC TYPICAL ROOFTOP AIR HANDLING AND MAKEUP AIR UNITS RMTyw DETAILS t� PROVIDE UNIONS AFTER EACH SCREW TYPE VALVE AND PRIOR RasxdConidor METALS INSTR. 112 SCIENCE LABS 1 450 190 TO EQUIPMENT CONNECTIONS. 8nargyCode ISSUE DATE: JULY 24, 2012 Existing TOTAL RTU-9 2000 485 1515 O5 ALL WORK AND MATERIALS SHALL BE IN FULL ACCORDANCE WITH Accm1billty r-y* PROJECT NO.: 2012-02 W THE LATEST RULES AND REGULATIONS OF ANY STATE OR LOCAL Approved plans SHEET � LAWS OR ORDINANCES. OBTAIN AND PAY FOR ALL REQUIRED PERMITS, LICENSES, CODE INSPECTIONS, ECT. Shall be on job m101 OFFICE COPY Lu MECHANICAL SPECIFICATIONS SYSTEM DRAWN BY: GCB D PART 1 GENERAL CHECKED BY: GCB DESIGN APX1201 1.1 SCOPE NSULTANTS Nc. A. THE WORK INCLUDED IS THE ADDITION OF PACKAGE ROOFTOP AIR HANDLING UNITS AND MAKEUP AIR UNITS. THE SCOPE ALSO 5 6 7 8 9 5 SE WATER AVE. SUITE 400 INCLUDES ASSOCIATED DUCTWORK, GRILLES, NATURAL GAS PIPING AND ALL ACCESSORIES AND SYSTEMS REQUIRED FOR COMPLETE TLAND OREGON 97214 OPERATING SYSTEMS. 0s-248-0227 FAX 248-0240 B. THE SCOPE INCLUDES PROVING DUCTWORK, EXHAUST FANS AND ROOF TERMINATIONS FOR NEW AND RELOCATED EXHAUST ONTACT: GARY BARNES HOODS. C. IT IS THE INTENT OF THESE SPECIFICATIONS AND THE ACCOMPANYING DRAWINGS TO DESCRIBE COMPLETE MECHANICAL SYSTEMS INSTALLATIONS FOR THE BUILDING AREAS WITHIN THE SCOPE OF WORK. THE DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY. WHAT IS CALLED FOR IN ONE SHALL BE CALLED FOR IN BOTH. E IF (DDIF D. FURNISH AND INSTALL ALL MATERIAL, LABOR AND EQUIPMENT IN ACCORDANCE WITH THESE DOCUMENTS. INCLUDE ALL 4T)DIF QE DIF OPEN OFFICE OE DIF OD INCIDENTAL ITEMS AND WORK NOT SPECIFICALLY SHOWN OR SPECIFIED BUT REQUIRED BY GOOD PRACTICE IN A COMPLETE F7 121 E. THE DRAWINGS ARE DIAGRAMMATIC BUT SHOULD BE FOLLOWED AS CLOSELY AS POSSIBLE. WHERE REQUIRED BY JOBSITE )OX DUCT L - - - - _ - - - - - - �QDUCT OE 1p4� Q100 SAMPLE I QDIF RECEI��INGE DIF I I CONDITIONS, RELOCATE AND PROVIDE FITTINGS, ETC., AS REQUIRED. PROVIDE AN ALLOWANCE IN THE CONTRACT BID TO FURNISH t; I QX DUCT I , INFINITE ADDITIONAL PIPE AND DUCTWORK FITTINGS REQUIRED FOR COORDINATION WITH STRUCTURE AND OTHER CONSTRUCTION TRADES. P 120120 1' " E E RILE ARCHITECTURE F. PROVIDE: THE TERM PROVIDE MEANS TO FURNISH AND INSTALL, COMPLETE AND READY FOR THE INTENDED USE. �� OG Q80 OPEN OFFICE �$0 1.2 STANDARDS AND CODES 101 P.O. Box 664 A. PROVIDE ALL EQUIPMENT AND MATERIAL AND PERFORM ALL WORK IN ACCORDANCE WITH ALL LOCAL, STATE AND NATIONAL Donald,OR 97020 OPEN TESTING CODES AND REGULATIONS. AREA QDIF E 120 0100 QDIF ! (b) 503.989.2992 1.3 SUBMITTALS AND APPROVAL OF EQUIPMENT AND MATERIALS Ii - -I ! �- L" O TAT (f) 503.976.9013 A. MANUFACTURER'S TRADE NAMES, CATALOG NUMBERS AND MATERIAL SPECIFICATIONS USED IN THIS SPECIFICATION ARE �I T QE GRILLE 080 INTENDED TO ESTABLISH THE QUALITY OF EQUIPMENT OR MATERIALS EXPECTED. MATERIALS AND MANUFACTURERS NOT LISTED - _ _ _ _ _ _ _ _ _ __--�� infinitearchitecture@wbcable.net REQUIRE APPROVAL PRIOR TO THE BID DATE. I QGRILLE I F ------- ---------- _ QDIF �ODU T QX DUCT P 120 Q1p0 �/�'0 B DEEMED pIMPORTANT BY U THE EQUIPMENT OR OR THE CONTRACTOR OR WIL BASED BERESPONSIB EFOFORAMAKINGUALL CHANGES INRTH THIS AND OTHER E IF ----------------- OE 120 PRIV OFFICE ASSOCIATED WORK REQUIRED AS A RESULT OF THE SUBSTITUTION. ADDITIONAL OR MODIFIED STRUCTURAL CALCULATIONS AND - - - �' -! - - - _i.- _ - - - - - - �p PROF ROOF PENETRATIONS REQUIRED TO ACCOMMODATE THE SUBSTITUTION WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. ( QX DUCT QDUCT QP 120 102 t�� FS C. INCLUDE SHOP DRAWINGS WITH THE SUBMITTALS WHERE NECESSARY TO DETERMINE CLEARANCE, WERE THE CONTRACTOR11 I -� PRIV OF-ICE PRIV OFFICE �FQ$0 I QDIF r�;\ j �1;,tNEE,Qry spm PROPOSES ALTERNATE EQUIPMENT OR MATERIAL ARRANGEMENTS. 125 1229 0 -N OFFICE QDIF D. APPROVAL OF THE SUBMITTALS BY THE ENGINEER DOES NOT RELIEVE THE CONTRACTOR FROM THE REQUIREMENTS OF THE �J 103 EO80 ::jEXISTING Q80 c !,' ,r IF APPROVAL H GIVEN DEVIATION. I - Ts AT ! RTU-8 \ CONTRACT DOCUMENTS UNLESS SPECIFIC RO AL AS BEEN REQUESTED FOR A G I 0 � T DROPS � � QRE�N PART 2 PRODUCTS - ��� �r' XD UCT E100 / vG cam : 2.1 ROOFTOP AIR HANDLING UNIT - - - - - - �l� 1°� - - Q80 QE 80 t 3 A. DESCRIPTION: ROOF-MOUNTED, CONSTANT VOLUME, SINGLE PACKAGED AIR CONDITIONING UNIT DESIGNED FOR FULL CURB - QX DUCT - P 120 QE DIF EE 80 cgRy G SG' MOUNTING ON FACTORY-SUPPLIED CURB, VERTICAL INTAKE AND DISCHARGE, NATURAL GAS EAT, CAPACITIES AS INDICATED, E IF �� CONFERENCE FACTORY ASSEMBLED, WIRED, PIPED, TESTED AND SHIPPED IN ONE PIECE WITH U.L. LISTING, WITH SINGLE POINT ELECTRICAL �yODIF QDIF IXPIRES 12/31/13 CONNECTION. JDIF 124 IF EXISTIN QE DIF QE G ILLE B. HOUSING: CONSTRUCT THE UNIT HOUSING OF MINIMUM 18-GAUGE GALVANIZED STEEL FORMED EXTERIOR PANELS FINISHED WITH - - - - - - - RTU-7 7N QE 80 RUST INHIBITING ENAMEL COAT. STANDARD FINISH COLOR. 1' R XQDUCT OGRILLE _ QX GRILLE QGRILLE DROPS i _ {E GRILLE E ILLE _ C. PROVIDE MINIMUM 1", 1-1/2 POUND COATED FIBERGLASS INSULATION ON EXTERIOR PANELS WITH NEOPRENE DOOR GASKETING. �I L, h O L y L y CAULK ALL EXTERIOR PANEL-TO-PANEL JOINTS TO PROVIDE WATERTIGHT CASING. PROVIDE HINGED DOORS TO ALL PORTIONS OF - - - - _ P 30 24i P P _ _ G THE RTU REQUIRING ROUTINE MAINTENANCE. - - --- E 100 HIGH PRESSURE , O A TORY CHARGED, , , , 1 HA E WITH CRANKCASE HEATER REFRIGERANT INE FILTER DRIER F C (D DUCT UNITS LL BE AIR COOLED LUCT I WX�ST� NIN X (DDIF J C - - - - - - - IF ROC`SSING CUTOUT, LOSS OF CHARGE PROTECTION, OVERCURRENT AND OVERTEMPERATURE PROTECTION, ANTI-RECYCLE TIMER AND LOW i - - - - - - - - - - - _ _ I X UCT r PRIV 0F1 r� -' - - - - lc AMBIENT E. REFRIGERATIONAS STEM: PROVIDE SCROLL OR SEMI HERMETIC RECIPROCATING TYPE COMPRESSORS EQUIPPED WITH OIL II. I QDIF DQE GRILLE l QE DIF &4,0_ 1 ��� 05 I 104 X H � I QEF QE HOOD (DDUCT ,�I � I I I � PRESSURE, LOW PRESSURE AND HIGH-PRESSURE SAFETY SWITCHES. PROVIDE THERMOSTATIC EXPANSION VALVE REFRIGERANT '` r-I-� X UCT �� Q3 FLOW CONTROL. - �- -� QEF-8 � I X UCT I � I �. L!' Q40 � I X D' PRIV OFFICE F. NATURAL GAS HEATING: COMPLETELY ASSEMBLED, WIRED, PIPED AND TESTED, WITH THREADED GAS CONNECTIONS. PROVIDE QHOOD , J QX DH �N I QGRILLE 105 QDIF STAINLESS STEEL HEAT EXCHANGER AND BURNERS, FORCED DRAFT COMBUSTION BLOWER AND ELECTRONIC IGNITION. ! E 100 r J SEMI VOLS w I QEF �H G. COILS: PROVIDE INDOOR AND OUTDOOR COILS OF NON-FERROUS CONSTRUCTION WITH ALUMINUM FINS MECHANICALLY BONDED TO SEAMLESS COPPER TUBING WITH ALL JOINTS BRAZED. PROTECT COILS WITH PLYWOOD COVERS DURING SHIPMENT AND I I QEF-6 5 3 I i 5 ODTI E IF - ' E / EQGRIL X IF INSTALLATION. „ QDIF X H - E 100 H. FANS: INDOOR FAN SHALL BE CENTRIFUGAL TYPE DIRECT DRIVE BY A PERMANENTLY LUBRICATED PREMIUM EFFICIENCY MOTOR. EXTRACTIONS' F71 rl QDIF IC 71 Q OUTDOOR FAN SHALL BE A PROPELLER TYPE, DIRECT DRIVEN BY A PERMANENTLY LUBRICATED MOTOR. FILTERS: TWO-INCH 119 t_ J E 140 1 - II E aOO IF Q120 I VN THICK THROWAWAY TYPE FILTERS. I, QE MOOD QE pIF OE 140 C� / X UCT 'I' QE DIF I. ECONOMIZER: FULLY MODULATING, ENTHALPY CONTROLLED TYPE ELECTRIC CONTROL SYSTEM WITH OUTSIDE AND MIXED AIR _ _ 4 _ + - IF E IF i r\ -1 THERMOSTAT. CONTROLS TO ALLOW SIMULTANEOUS COMPRESSOR AND ECONOMIZER OPERATION. PROVIDE ADJUSTABLE MINIMUM IC�W T X UCT I �01 1 E OOD OUTSIDE AIR DAMPER POSITION. OUTSIDE AIR DAMPERS SHALL CLOSE WHEN INDOOR FAN SHUTS DOWN. CONTROL DAMPERS TO E OOD L y TSTAT TSTATa _ OX i QDM0 (E)6F �' I // Q100 HAVE A MAXIMUM LEAKAGE RATE IN COMPLIANCE WITH CURRENT STATE OF OREGON ENERGY CODE REQUIREMENTS. QX GRILL / J. POWER EXHAUST (WHEN SCHEDULED): PROVIDE A FACTORY INSTALLED POWER EXHAUST WHEN SCHEDULED OPERATED BY AN _ ; _ X IF N/1 _ _�X DH - �- - X IF BREAK RM _ � j ADJUSTABLE END SWITCH. EXHAUST FANS TO BE MANUFACTURER'S STANDARD OPTION WHEN AVAILABLE OR MANUFACTURER'S 1 iil �- - -- - + MUA-1 � 1 107 !I ! E IF 975 LBS I OMD / TSTAT OE EXTRACTION - - - - - - - - - - - - - - - - - - - - - 3 I F APPROVED FIELD CONVERSION OPTION WHEN NOT AVAILABLE FROM THE FACTORY. QEF- QH40D X DUCT �- - - T K. OPTIONS / ACCESSORIES: COMPRESSOR DELAY CONTROL CIRCUIT. =J� X UCT ' ANNEX METALS P EP � �� TSTAR T p i TSTAT i II I� L. ROOF CURB: PROVIDE FACTORY ROOFTOP CURB MANUFACTURED TO PROVIDE A LEVEL MOUNTING SURFACE WITH A SLOPED OEF-,I X IF OGRILLE QGRILLE 120 I Q100 KEITH ROOF INSTALLATION. VERIFY EXACT REQUIREMENTS PRIOR TO EQUIPMENT ORDER. 118 114 QX D CT­___I QX DIk, � K IC�1 108 M. PROVIDE A SMOKE DETECTOR IN THE MAIN RETURN AIR DUCTS OF EACH ROOFTOP AIR HANDLING UNIT AND MAKE-UP AIR 21 X I I ( L0 DUCT(S) Q140 OD 1C>! -, J� I UNIT (EXCEPT RTU-4, RTU-7 AND RTU-8) TO SHUT DOWN THE UNIT IN ACCORDANCE WITH SECTION 606 OF THE OREGON QD1 ( - - - - - �IC21 (- -E-} OX DIF OE 100 MECHANICAL SPECIALTY CODE AND PER NFPA 90A. SMOKE DETECTORS TO BE COMPATIBLE WITH THE BUILDING FIRE DETECTION OE 100 OE 100 �,, N Li ©140 E IF i OE 100 QDIF SYSTEM. COORDINATE EXACT SMOKE DETECTOR REQUIREMENTS WITH THE FIRE ALARM SYSTEM PRIOR TO ORDER. OUTSIDE AIR E IF QDIF QDIF ( I XO14 E�DIF Q100 OD I I QDIF r E 100 EXISTING i I DAMPERS SHALL CLOSE ON UNIT SHUTDOWN. I {E�24 '� 3- I I QX, 12 IC 7 QDIF � RTU-9 I QDIF N 1� CONTROLS: PROVIDE A PROGRAMMABLE ELECTRONIC NIGHT SETBACK THERMOSTAT (TOUCMSCREEN TYPE) FOR THE UNITS. STORAGE E 180 QE 36 QE EF- J QX pU T OE pIF E 140 �RILLE _� DROPS _ L - - - - -1 OGRILL THERMOSTAT SHALL PERFORM THE FOLLOWING FUNCTIONS. X DUCT QEF-2 71 1-67- I ®HOOD G C S OX DUCT��-1 o. MENU DRIVEN PROGRAMMING. EQ120 X ENUMS QX DUCT - 110 LSI L S! L�1 b. BATTERY BACKUP TO MAINTAIN PROGRAM AND TIME. I E 140 OE GRILL 11 10 8 - - - - - - -L 7F-1 X RIL (DGRILE c. INSTANT OVERRIDE AT THE THERMOSTAT. ;! - _ - K� d. PROGRAMMABLE SETUP/SETBACK TEMPERATURE_ i QHOOD QE HOOQ INSTRUMENTS RQMOOQ \�-f e. FAN OPERATION CONTINUOUS DURING DAYS, INTERMITTENT DURING NIGHTS. X 112 f. COMPLETE 7-DAY PROGRAMMING. O80XQ40 q. ENERGY COMPLIANCE. 1) PROVIDE 365 DAY, 24 HOUR OCCUPANCY SCHEDULING. uj 2) WHEN CONTROLLING BOTH HEATING AND COOLING, PROVIDE A 5-DEGREE DEADBAND IN WHICH THE HEATING ENERGY PROVIDED TO THE ZONE IS REDUCED TO A MINIMUM. I 2. OPERATE THE ROOFTOP UNIT TO MAINTAIN THE MINIMUM NIGHT LOW LIMIT TEMPERATURE FOR THAT SYSTEM. OPERATE THE ROOFTOP UNIT OUTSIDE AIR DAMPER TO REMAIN CLOSED ON NIGHT LOW LIMIT HEATING. HVAC DEMOLITION PLAN m4. 3. STANDARD HEATING AND COOLING SEQUENCING AND STAGING CONTROLS WITH ECONOMIZER LOGIC MODULE IN THE UNIT.LOCKING COVER. 3.3 PERMITS, FEES AND INSPECTIONS SCALE: 1/8"= 7=0" A_ OBTAIN ALL REQUIRED PERMITS AND PAY FOR ALL FEES AND CONNECTION CHARGES. J W 2.2 MAKEUP AIR UNITS J U A. ACCEPTABLE MANUFACTURERS: TRANE, GREENHECK, REZNOR, MODINE, STERLING OR APPROVED EQUAL. B. SCHEDULE ANY REQUIRED INSPECTIONS. 3.8 CUTTING AND PATCHING B. DESCRIPTION: ROOF-MOUNTED, CONSTANT VOLUME, SINGLE PACKAGED AIR CONDITIONING UNIT DESIGNED FOR FULL CURB 3.4 EQUIPMENT INSTALLATION, BRACING AND SUPPORT A. CUT WORK AS REQUIRED FOR INSTALLATION AND PATCH TO MATCH ORIGINAL CONDITIONS. J W MOUNTING ON FACTORY-SUPPLIED CURB, VERTICAL DISCHARGE, NATURAL GAS HEAT AS SCHEDULED, CAPACITIES AS INDICATED, A. INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS UNLESS OTHERWISE INDICATED. B. WHEN MASONRY CONSTRUCTION MUST BE PENETRATED, PROVIDE A STEEL PIPE SLEEVE IN OPENING AND GROUT 1N PLACE IN A B. THE DRAWINGS IN GENERAL ARE BASED UPON ONE OF THE SPECIFIC MANUFACTURERS LISTED FOR A PARTICULAR EQUIPMENT NEAT MANNER. LEAVE GROUT SURFACE TO MATCH EXISTING FINISH. B FACTORY ASSEMBLED, WIRED, PIPED, TESTED AND SHIPPED IN ONE PIECE WITH U.L_ LISTING, WITH SINGLE POINT ELECTRICAL C. PRIOR TO CUTTING ANY EXISTING WORK, LOCATE ALL CONCEALED UTILITIES TO ELIMINATE ANY POSSIBLE SERVICE INTERRUPTION O p ti CONNECTION. ITEM. THE OTHER SPECIFIED MANUFACTURERS AND ADDITIONAL APPROVED MANUFACTURERS OF EQUIPMENT MAY REQUIRE C. PROVIDE PROPORTIONAL TEMPERATURE CONTROLLER AND ASSOCIATED CONTROL DEVICES TO CONTROL THE DISCHARGE AIR DEVIATIONS FROM THE DRAWINGS TO PROPERLY INSTALL THE PARTICULAR EQUIPMENT IN ACCORDANCE WITH THE OR DAMAGE. Q TEMPERATURE OF THE UNITS. MANUFACTURER'S RECOMMENDATIONS AND TO PROVIDE THE SYSTEM RESULTS REQUIRED. PROVIDE ALL WORK NECESSARY IN THE 3.9 FIRESTOPPING PENETRATIONS IN FIRE-RATED WALL/FLOOR ASSEMBLIESW O C'1 D. GAS FURNACE/HEAT EXCHANGER (WHEN SCHEDULED): INDIRECT GAS FURNACE WITH MINIMUM 80% EFFICIENCY, INTEGRAL BASE BID PRICE TO INSTALL THIS EQUIPMENT. A. CONTRACTORS SHALL PROVIDE PROPER SIZING WHEN PROVIDING SLEEVES OR CORE-DRILLED HOLES TO ACCOMMODATE THE CO O POWER VENT SYSTEM, SPARK IGNITION, ELECTRONIC MODULATION WITH FACTORY MOUNTED DUCT THERMOSTAT. HEAT EXCHANGER C. WHERE THE INSTALLATION SHOWN OR SPECIFIED IS CONTRARY TO THE MANUFACTURER'S INSTRUCTIONS, ADVISE THE ENGINEER THROUGH PENETRATING ITEMS. ALL VOIDS BETWEEN SLEEVE OR CORE-DRILLED HOLE AND PIPE PASSING THROUGH, SHALL BEa ..3 to 0 IS TO BE OF 409 STAINLESS STEEL. POWER VENT. IN WRITING OF THE DIFFERENCES BEFORE PROCEEDING WITH THE INSTALLATION. FIRESTOPPED TO MEET THE REQUIREMENTS OF ASTM E-814. X cv E. 100% OUTSIDE AIR OPENING, 2-POSITION OSA DAMPER WITH SPRING RETURN, MOISTURE ELIMINATORS, AIRFLOW PROVING SWITCH, D. ANCHORAGE TO FLOORS, ROOFS, ETC., SWAY BRACING AND SEISMIC RESTRAINTS: B. FIRE STOP PENETRATIONS IN ACCORDANCE WITH THE U.L. LISTED ASSEMBLIES PROVIDED BY THE MANUFACTURERS OF THE W co 0 SUPPLY AIR FIRESTAT, LOW LEAK DAMPERS, HIGH / LOW GAS PRESSURE LIMIT SWITCHES, MANUAL RESET HIGH TEMPERATURE 1. THE CONTRACTOR IS RESPONSIBLE TO DETERMINE THE MEANS AND METHODS OF EQUIPMENT INSTALLATION AND SUPPORT. PRODUCTS USED. Q Q04 LIMIT, 2-INCH THICK PLEATED FILTERS (3090. 2. PROVIDE SUPPORTS FOR ALL APPARATUS AS SPECIFIED, DETAILED, AS REQUIRED BY THE MANUFACTURERS OF SPECIFIC 3.10 DEMOLITION F. FANS: INDOOR FAN SHALL BE CENTRIFUGAL TYPE DIRECT DRIVE BY A PERMANENTLY LUBRICATED MOTOR. EQUIPMENT AND THE PROJECT GOVERNING CODE AUTHORITIES. ANCHOR ALL ROOF MOUNTED EQUIPMENT WITH SIZE AND SPACING A. GENERAL: THE INSTALLATION OF WORK UNDER THIS CONTRACT MAY INCLUDE REMOVAL OF CERTAIN EXISTING PIPING AND G. PROVIDE AIRFLOW PROVING SWITCH TO PREVENT BURNER OPERATION WITH NO AIRFLOW. OF ANCHOR BOLTS OR OTHER ATTACHMENT MEANS AS RECOMMENDED BY THE RESPECTIVE EQUIPMENT MANUFACTURER. DUCTWORK. THE EXTENT OF THIS WORK HAS BEEN NOTED ON THE DRAWINGS; HOWEVER, IT IS PROBABLE THAT RELATIVELY MINOR H. ROOF CURB: PROVIDE FACTORY ROOFTOP CURB MANUFACTURED TO PROVIDE A LEVEL MOUNTING SURFACE WITH A SLOPED 3. PROVIDE SEISMIC RESTRAINTS ON ALL MECHANICAL EQUIPMENT IN CONFORMANCE WITH THE 2010 OREGON STRUCTURAL ADDITIONAL REMOVAL OR RELOCATION OF PIPING AND DUCTWORK MAY BE NECESSARY IN ORDER TO INSTALL NEW WORK AS ROOF INSTALLATION. VERIFY EXACT REQUIREMENTS PRIOR TO EQUIPMENT ORDER. SPECIALTY CODE, SECTION 1613 "EARTHQUAKE LOADS" AND ASCE 7. COSTS FOR SEISMIC CALCULATIONS ARE TO BE INCLUDED SHOWN. THE CONTRACTOR SHALL ALLOW FOR AND REFLECT IN HIS BID THE COST OF THIS WORK, BASED ON EXAMINATION OF REVISIONS IN THE BID PRICE. PRESENT CONDITIONS. 2.3 DUCTWORK 4. PROVIDE DEFERRED SUBMITTALS DIRECTLY TO THE GOVERNING CODE JURISDICTION FOR ANCHORAGE TO FLOORS, ROOFS, ETC., A. PROVIDE GALVANIZED SHEET METAL DUCTWORK FOR ANY REQUIRED DUCTWORK INSTALLATIONS OR MODIFICATIONS_ PROVIDE SWAY BRACING AND SEISMIC RESTRAINTS. SUBMITTALS TO SHOW LOCATIONS AND SUFFICIENT SUPPORT DETAILS AS REQUIRED BY B. REMOVAL: EXISTING EQUIPMENT SHOWN OR SPECIFIED AS REMOVED BUT NOT RELOCATED SHALL BE REMOVED FROM THE MINIMUM GAUGE AND REINFORCING IN ACCORDANCE WITH CHAPTER 19 OF THE 2012 EDITION OF THE ASHRAE HANDBOOK AND AS THE GOVERNING CODE JURISDICTION. PROPERTY. DISPOSE OF WASTE MATERIALS AND LEAVE THE PREMISES CLEAN. RECOMMENDED BY THE LATEST EDITION OF THE "HVAC DUCT CONSTRUCTION STANDARD" PUBLISHED BY SMACNA. 5. PROVIDE SUPPLEMENTARY DRAWINGS AND CALCULATIONS AS REQUIRED BY GOVERNING CODE JURISDICTIONS NOTING SEISMIC 3.11 VERIFICATION OF EXISTING CONDITIONS 2.4 GRILLES AND DIFFUSERS SUPPORT DATA/CALCULATIONS AS REQUIRED FOR PERMIT PURPOSES. A. VERIFY FIELD CONDITIONS AND MEASUREMENTS PRIOR TO THE MANUFACTURE OR ORDER OF MATERIALS AND EQUIPMENT. A. MATCH EXISTING STYLES IN THE SPACES. 6. MECHANICAL SEISMIC CRITERIA - SEE TABLE ON DRAWING SHEET M1. B. PRODUCE SHOP DRAWINGS WITH DETAILS AS REQUIRED TO VERIFY PROPER INSTALLATION OF MATERIALS & EQUIPMENT IN E. MAINTAIN A COPY OF THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AT THE JOBSITE FOR ALL EQUIPMENT. CONFORMANCE WITH APPLICABLE CODES AND THE MANUFACTURER'S REQUIREMENTS. 2.5 NATURAL GAS PIPING A. PIPE: SCHEDULE 40 BLACK STEEL PIPE CONFORMING TO ASTM A120-82 OR A53-83. 3.5 CLEANING 3.12 AIR BALANCE FITTINGS: 150 PSI SCREWED MALLEABLE IRON. A. MAINTAIN PREMISES AND PUBLIC PROPERTIES FREE FROM ACCUMULATIONS OF WASTE, DEBRIS AND RUBBISH DURING A. ROOFTOP AND MAKEUP AIR UNITS: CONSTRUCTION. 1. ASSURE THAT AIR FILTERS ARE CLEAN, IF NOT NEW, PRIOR TO BEGINNING AIR BALANCE WORK. PART 3 EXECUTION B. CLEAN ALL MECHANICAL EQUIPMENT OF DUST, GREASE, IRON CUTTINGS, UNNECESSARY STAMPS OR SHIPPING LABELS, ETC. 2. ADJUST FAN DRIVES TO OBTAIN FAN SPEED REQUIRED FOR AIR VOLUMES. SPEED SHALL BE SET TO THE MINIMUM TO PROVIDE 3.1 ROOFTOP AIR HANDLING UNITS AND MAKEUP AIR UNITS C. TOUCH UP FACTORY PAINTED SURFACES, AS NECESSARY, WITH PAINT OF MATCHING COLOR. REQUIRED AIR VOLUME AT FURTHEST RUN WITHOUT EXCESSIVE STATIC PRESSURE. A_ INSTALL ROOFTOP UNITS, MAKEUP AIR UNITS AND CONTROLS WHERE NOTED ON DRAWINGS AND IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. DO NOT START UNIT UNTIL FILTERS HAVE BEEN INSTALLED. INSTALL A NEW SET OF FILTERS 3.6 RECORD DRAWINGS 3. ADJUST MINIMUM OUTSIDE AIR VOLUME TO THAT SHOWN ON THE PLANS. A. MAINTAIN ONE SET OF CONSTRUCTION DRAWINGS AT THE JOBSITE FOR THE SOLE PURPOSE OF RECORDING WORK OF THE 4. INCLUDE THE FOLLOWING IN THE LOGS: UPON JOB COMPLETION. a. SUPPLY, RETURN AND OUTSIDE AIR VOLUMES. B. INSTALL UNIT ON CURB AND PROVIDE SEISMIC BRACING AND SUPPORTS AS REQUIRED BY THE GOVERNING JURISDICTION FOR MECHANICAL CONTRACT, AS ACTUALLY INSTALLED. b. SUPPLY AIR TEMPERATURES ON FULL HEATING AND FULL COOLING AS APPLICABLE. ALL UNITS. PROVIDE SEISMIC RESTRAINT DETAILS AND CALCULATIONS AS REQUIRED BY THE GOVERNING CODE JURISDICTION. B. MAKE RECORD DRAWINGS AVAILABLE TO THE OWNER FOR REVIEW OR REPRODUCTION DURING CONSTRUCTION. c. STATIC PRESSURE DROPS ACROSS FAN, FILTERS AND COIL. HVAC COST FOR ALL SEISMIC DETAIL DEVELOPMENT AND CALCULATIONS ARE TO BE INCLUDED IN THE BASE BID PRICE. 3.7 OPERATION AND MAINTENANCE MANUALS: d. TOTAL PRESSURE DROPS FOR SUPPLY AND RETURN SYSTEM. DEMOLITION PLAN C. PROVIDE GAS PRESSURE REGULATOR AT EACH UNIT TO REDUCE GAS PRESSURE TO PRESSURE REQUIRED BY THE A. SUBMIT FIVE COPIES OF THE OPERATION AND MAINTENANCE MANUALS TO THE PROJECT MANAGER FOR APPROVAL BEFORE e. FAN SPEED OR RPM. MANUFACTURER'S INSTALLATION INSTRUCTIONS. PROJECT COMPLETION. BIND THE INSTRUCTION BOOKS WITH THREE RING 8-1/2" X 11" SIDE BINDERS WITH PLASTIC COVERS. f. ACTUAL MOTOR VOLTAGE, AMPERAGE, RPM AND OVERLOAD HEATER SIZES. INCLUDE AN INDEX AND TABS FOR MAJOR SYSTEMS AND EQUIPMENT. OPERATION AND MAINTENANCE MANUALS SHALL INCLUDE B. RELOCATED AND NEW EXHAUST HOODS / FANS:3.2 DUCTWORK INSTALLATION THE FOLLOWING: 1. MEASURE EXHAUST AIR VOLUMES. ISSUE DATE: JULY 24,2012 A. ALL DUCTWORK AND MODIFICATIONS TO CONFORMANCE WITH SMACNA STANDARDS. B. MANUFACTURER'S LITERATURE: 2. RECORD THE FAN NAMEPLATE DATA, FAN RPM, MOTOR VOLTAGE AND AMPERAGE. PROJECT NO.: 2012-02 B. ALL JOINTS IN THE AIR DISTRIBUTION SYSTEM SHALL BE SEALED AIRTIGHT WITH HARDCAST CCWf-181 OR SIMILAR LEEDR 1. INCLUDE ILLUSTRATIONS, DIAGRAMS, AND INSTRUCTIONS FOR INSTALLATION, STARTUP, OPERATION, INSPECTIONS, MAINTENANCE, C. AIR DISTRIBUTION SYSTEM: LLLI COMPLIANT SEALANT. PARTS LIST, DATA SHEETS AND OTHER NECESSARY MATERIALS. 1. ADJUST AIR VOLUMES AT DIFFUSERS AND GRILLES TO WITHIN PLUS OR MINUTo3JF THE VALUES SHOWN ON THE PLANS. C. DUCT CONSTRUCTION PRESSURE CLASSIFICATION (SMACNA): + 2-INCH FOR SUPPLY AND -1 INCH FOR RETURN AND EXHAUST 2. INCLUDE COMPLETE ELECTRICAL, SCHEMATIC AND CONNECTION DIAGRAMS FOR EACH EQUIPMENT ITEM. 2. ADJUST DIFFUSERS AND GRILLES FOR PROPER DIRECTION AND THROW. SHEET to DUCTWORK. 3. WHERE THE LITERATURE COVERS MORE THAN ONE MODEL, CHECK OFF NEATLY IN INK CORRECT MODEL NUMBER AND DATA 3. LOG ALL READINGS TAKEN AND MARK FINAL POSITION OF ALL BALANCING DAMPERS. FOR THE MODEL NUMBER INCLUDING ALL SPECIFIED OPTIONS. C. COPY OF WRITTEN GUARANTEE. M1 02 W SYSTEM DRAWN BY: GCB DESIGN CHECKED BY: GCB APX1201 CONSULTANTS Nc. 1515 SE WATER AVE. SUITE 400 lllil PORTLAND OREGON 97214 503-248-0227 FAX 248-0240 CONTACT: GARY BARNES i ; EXIST EXIST OPEN OFFICE EXIST EXIST EXIST 400 Q Q 400 j 12 1 450 175 110 - vo � c � E 10� 01 � " EXIST EEXIST ' INFINITE Q o sAMP` ARCHITECTURE j VD 120 120 � I 100 RECEIVING 100 � EXIST ! 100 P.O. Box 664 024 12X12 350 J Donald, OR 97020 E 20X20 325 OPEN OFFICE 024 Q 14 VD i 101 08� (b) 503.989.2992 I (f) 503.976.9013 OPEN TESTING 124 VD OE $0 EXIST AREA. 8X8-2 12� lj Q10b Q1 200 i 120 XI T 125 VD ! �TU-8 I infinitearchitecture@wbcable.net �� �-T EXIST E 40 QC 16 --10so C 11045 XI T 870 - o N - 5—- - -EXIST E $�D - - - - - E 10x$ --O PR EXIST � OFFS EXI T PRI OFFIC 125 QE 1 Q 1245 400 a0 125 010 X 123 Q84t PRIV OFFICE 22X22 M 8X8 `r X ! EXIST $� ; 102 250 1 �7 1185 1 RTU-6A 75 VQ Vp 75 ! o' „ �}E 80 DROPS 4 1041 ` OPEN OFFICE EXIST I I J103 150 \ 171 , 18x16 10 T RTU_6C 012X12 I cGty 13, �', 10�b 10 100 10� QE 845 0100 � E 100 EXIST ' 'Y C BARN 80 EXI T EXIST 080 i Q14x12 j Q 250 EXPIRES 12/31/13 _�_ XIST 250 8X8 2 175 175 C 10s� 8 8X8 Q j EXIST EXIS EXIST C 125 200 20a - 250 - 20 E- 12�b QE 84s IST EXIST EXIST ®RECIRC. 225UUN�EHENCE 200 125 MUA-,2R COIR . HOOD 18x12 j RTU-6A DfOP HOOD 1 8 VD 124 -- - - - - - T - - 5 �# ''' _ - - - - -- - r - - - - - - - � DwING � i 20x18 1 �-6B 30X24;, E 100 16�d DROPS160I VOLS 16Sb 1$� PRiV OFFICE L`1 EXIST 1? - EXIST i 375 115 IST EXIST 8 1045 `_DR U- N I 104 200 >g EXIST 100 1045 80 N N 150 �? �\� 375 34x34 E OOD — 150 D OPS x O wO E F-8 w0 �I s #7 QC 12 � 1445 -� OH - I co 00 500 E OOD 3 { I j PRIV OFFICE EXIST O C ! 10 3 22X22 I Q XIST` 105 J 200 11 550 925 1250 i o s! ;25 !j XIST 12 EXIST E F-6 i EXIST S #6 {T`l'P 2 L100 C TRANS XI E 10sb 1645 `O 645 400 w R 00 - E F (TYP 2) 15 100 o #2 I Q120 E OOD o QH rn t 0E 1446 X 22X - 01468 XI T I ��'EXIST j j WASTE j ZR ECIR 200 �1---- - --- - - - - - --- - - - --- to M 2_000 - ---- =�S-TA�- �5 - 1 50 PROCSSING �-,�- - HOOD EXIS EXTRACTICS 22X22 I I � 0 �10I 75 600 0100 mi 1300 ,TSTAT _ _ �� M t ---� - --- �—�- J --_ O `n ----- �a� I �-- - 24x - -- - ---22 - BREAK RM _ C 00 1 1646 #�' e 3 - - — 107 — 1068- - - - 'I - 10 —�E 1-00- -�- I J w # 1 X18-3 d 14� O QE 120 Q EXIST 22X22 �11 825 �T( 1,1, MATz TT 200 QEF-4 .. — 0 1250 I' Tu-66 I .�,��� E s 1445 itEl TH j - T 18X18-2 a `° 300 EXISTINGEXIS108 { EXIST' 350T ( 875 O 10X10 --y 16o RTU-9 1 300 1 8X8 E 100 DROPS j � STORAGE ( EXIST 0104' el 045 Q120 VD 225 0140 014 � � 010 Q 0100 EXIST 116 350 - IQ EXIST E 1045 E 1045 250 C Q24� EXIST {TYP 3) #14 EXIST O EXIST - - - -- (Di 80 036 1, Q C 225 - - - - - --- 150 250 a 0120 1045 T, I C 4 MUA-1 R ECIRC. vPC'S (TYP 3) j EXI T E F 01045 DROPSam 14 475 825 #l0i 875 11 HOOD 110 � EXTRACTION 1 X1 - QR HOOD ---~� ILII' ; ANNEX 350 E OOD / METAL L 118 MET214P�EP Z NSTR'U2ENTS uj a j J 5 wa O W N GENERAL NOTE ~ ti RELOCATE / PROVIDE NEW EXHAUST FANS, DUCTWORK AND ROOF PENTRATIONS AS uiQ LL REQUIRED FOR RELOCATED EXHAUST HOODS. MAINTAIN MINIMUM 10-FEET FROM EXHAUST m O O N FAN TERMINATIONS TO RTU OUTSIDE AIR INTAKES (MINIMUM 30-FEET FROM EXHAUST FAN J TERMINATIONS THAT ARE IN THE DIRECTION OF THE RTU OUTSIDE AIR INTAKES) W co Q HVAC FLOOR PLAN a. N 0 SCALE. 118"= V-0• SHEET NOTES ¢ r 1= 01 PROVIDE DROPS FROM RTU INTAKE AND DISCHARGE OPENINGS — MAKE HORIZONTAL TRANSITIONS WITH 90—DEGREE ELBOWS WITH TURNING VANES CLEAN / UNPLUG DUCT TO BALANCE REVISIONS 03 PROVIDE MANUFACTURER'S RECOMMENDED STRAIGHT DUCT RUNS AT THE DUCT FURNACE INTAKE AND DISCHARGE ® PROVIDE EXTENSION OF EXISTING 34X34 RA DUCT AND CONNECT TO EXISTING 36-DIA. DUCT FLOOR PLAN - HVAC ISSUE DATE: JULY 24,2012 PROJECT NO.: 2012-02 W SHEET co M103 ' w a SYSTEM STE>iltl DRAWN BY: GCB DESIGN CHECKED BY: GCS (D APX1201 CONSULTANTS Nc. 1515 SE WATER AVE„ SUITE 400 PORTLAND OREGON 97214 5 6 7 8 9 10 503-248-0227 FAX 248-0240 SHEET NOTES _ — CONTACT. GARY BARNES (DCONNECT GAS TO EQUIPMENT WITH SHUTOFF VALVE, TEST FITTING, GAS REGULATOR AND DRIP LEG. SEE GAS CONFECTION DETAIL 3, SHEET M1. CONNECT AT GAS METER SERVING APEX (METR NUMBER 948852 - VERIFY). COORDINATE I CONNECTION WITH NORTHWEST NATURAL AT SITE PRIOR TO START OF CONSTRUCTION. VERIRY METER CONNECTIONS TO TENANT UNITS. _ INFINITE ARCHITECTURE I I I I I I I P.O.Box 664 y Donald,OR 97020 i ! (b) 503.989.2992 G G G G— E 1-1/4"G (f) 503.976.9013 I I TO OTHER S, infinitearchitecture@wbcable.net ---OF 3/4-G E 0 PROF E �GINEf�ss/o RTU-6A 1250 I I j i I i � ; � ���" / 1050 LBS i GIN'' 13 MUA-2 i k 1400 LBS 80 MBH 1 3 "G E ( EXISTING ' qRy C. $p�Ri�tiG' RTU- - 8 PIRES 12/31/13 250 MBH 1 3/4"G 1 GE I 80 MBH " 80 MBH 1 3/4-G E 1-1/4"G i ,\ ` E ir RTU-6B " EXISTINGRTU-6C 1050 LBS .l 3/4-G I RTU-7 ( ol 1050 LBS 360 MBH 1»G I 'I I 3/4-G 1 80 MBH G G GOOSNECK DISCHARGE,8,�� j G 1-1,{�4 G�E !' j DIRECTION � - - - --- - - - G TSG- CD I' 0 3/4"G E I - 1-1 j4"G� I - MUA-1 . II i 975 LBS ® EXISTING c� RTU-9 G I I I E 1-1/2"G 80 MBH 1- /4"G v i om \- EQGAS METERS f ( j ui � U w CL fl Q N x W hQ ix mo ROOF PLAN X co Lu co Q SCALE: 1/8"= 1=0" 114 1 d N Q .- 1- REVISIONS ROOF PLAN - HVAC ISSUE DATE: JULY 24,2012 PROJECT NO.: 2012-02 �. Lu SHEET M104 ' - w a.