Loading...
Permit CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2015-00208 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/27/2015 Parcel: 2S102AD03000 Jurisdiction: Tigard Site address: 12800 SW ASH AVE Project: City of Tigard Subdivision: BURNHAM TRACT Lot: 5 Project Description: Demolition of(4)buildings:3,120,3,090, 1,824,and 780 sq.ft. UPON FINAL INSPECTION,DEMO CREDITS FOR SDC FEES MAY APPLY. Contractor: LAKE OSWEGO INSULATION CO Owner: TIGARD, CITY OF 5930 JEAN ROAD 13125 SW HALL LAKE OSWEGO, OR 97035 TIGARD, OR 97223 PHONE: 503-245-6460 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: DEM Type of Const: Permit Fee-Additions,Alterations, 07/27/2015 $744.51 Demolition Occupancy Grp: Occupancy Load: Erosion Control w/Development-Eng 07/27/2015 $161.40 Dwelling Units: 0 DC Provision Review,COM TI-Ping 07/27/2015 $88.00 Stories: 0 Height: 0 ft Info Process/Archiving-Sm$0.50(up to 07/27/2015 $1.50 Bedrooms: 0 Bathrooms: 0 11x17) Value: $51,543 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $995.41 Required: Required Items and Reports(Conditions) 1 Ersn Cntrl 503-639-4175 Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a coov of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Permittee Signature: , Call -1175 by 7:00 a.m.for the next available inspection d.1 e. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. PIPF Building Permit Application Commercial r FOR OFFICE: USE ONLY City of Tigard REC EIVED Received Permit No.: /.. Date/B : K I 7 47` =L,44Z0 iil,aJi II 11 13125 SW Hall Blvd.,Tigard,OR 97223 O Plan Review s Phone: 503.718.2439 Fax: 503.598.19 /C L 14 2 1 J DaleB Other Permit: Date/13 T I G A R D Inspection Line: 503.639.4175 Date Ready/By: ® 7/47 y7 See Page 2 for Internet: www.tigard-or.gov CITY OF TIGARD Notified/Method: � , ?— Supplemental Information fpU LD:NG �;;'J!�!®N TYPE F WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ®Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $51,543 ❑Accessory building ❑Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:12800 SW Ash Avenue New dwelling area: square feet City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.: Project name:Ash-Public Wrks Yard Demo Covered porch area: square feet Cross street/directions to job site:South of Burnham St/Ash Ave Int. Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.:2S102AD03000 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF \\'ORK work indicated on this application. Demolish 4 buildings onsite Valuation: $ get-e,--r : e Ae.! -1Cle- I E DLI Existing building area: square feet New building area: square feet 0 PROPERTY OWNER I 0 TENANT Number of stories: Name:City of Tigard Type of construction: Address: 13125 SW Hall Blvd Occupancy groups: City/State/ZIP:Tigard OR 97223 Existing: Phone:(503)718-2466 Fax:( ) New: ❑ APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES* Business name:City of Tigard (Please rejertojee schedule) Structural plan review fee(or deposit): Contact name:Jeff Peck FLS plan review fee(if applicable): — Address: 13125 SW Hall Blvd City/State/ZIP:Tigard OR 97223 Total fees due upon application: S Phone:(503)718-2466 I Fax: :( ) Amount received: E-mail:jeffpCtigard-or.gov PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name: 101 Environmental&Demolition Services Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:5930 SW Jean Rd Solar Installation Specialty Code checklist. City/State/ZIP:Lake Oswego,OR 97035 Permit fee(includes plan review $180.00 and administrative fees): Phone:(503)245-6460 Fax:(503)245-4201 State surcharge(12%of permit fee): $21.60 CCB lie.:38052 /}-/ /I) �� Total fee due upon application: $201.60 Authorized signature: ! \'j( y This permit application expires if a permit is not obtained v+_ C-1 -7 within 180 days after it has been accepted as complete. Print name:Jeff Peck Date:7-14-15 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-COM PennitApp.doc 02/24/2011 4404613T(I I/02/COM/W EB) 111111 _ 11 Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ 1:\Building\Pemtits\BUP-COM PermitApp.doc 03/03/2011 74 ■ City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT . T I G A R D Building Permit Review — Commercial - With Land Use Building Permit #: 0,40,201 5---00o20 Site Address: /d8'60 gis) 4S1 /4e Suite/Bldg#: Project Name: C, of 7, r( (Name o ommercial bus6iss occupying the space. If vacant,enter Spec Space.) Planning Re ew Proposal: .3 1. 11 ( ;fd/ yld Verify site address/suite# exists and active in permit syste . ,' fiver Terrace Neighborh d: ❑ Yes VNo VillAnd Use Case#: 43beaeas— p2 Plan Match Approved Land Use: V Site Plan ❑ Landscape Plan [ Other .bgipic h_it_ ❑ Urban Forestry Plan ❑ Elevation Plan / uilding Height: Maximum Height Actual Height ❑ C ditions Met: 0 Prior to Submittal 0 Prior to Permit Issuance Business License- Exists: es ❑ No,applicant notified to obtain business license /Iil [tblic Facilities Improvement(PFI)Permit: Required: ❑ Yes,applicant was noti do Applied For: ❑ Yes ❑ stop take Notes: ALIT .7 0 �. , / s ^'' I7�' ht� - ,'- _id-$_ � o&m.e) / / -h.1 Approved b t'lanning: 611/11C 0 - Cr44.0y.-- Date: 7 " ,9 -lS Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 7/1//5 Site Plans: # 3 Building Plans: # Building Permit#: er building permit#above. Workflow Routing. ar fanning gineering ermit Coordinator ❑ Building Workflow Sign-off: G]-#51 off for Planning(include notes from planning review) Route Application Documents: 121�uilding: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: _ Date: 7/6 45— I:\Building\Forms\BldgPermitRvw_COM_WithLandUse 070915.docx Engineering Review lope at building pad: 7 TO ❑ PFI Permit#: ❑ Conditions "Met"prior to issuance of building permit ❑ Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes No Assess Water Quantity Fee in-lieu: ❑ Yes e o LIDA Facility on lot: ❑ Yes TJ No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: ,r41,(L Date: 7 1'5.... Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions"Met"prior to issuance of building permit El Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A Tigard Trans SDC: El Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A ....117q)K to Issue Permit ■ / Approved by Permit Coordinator: dili i/j� Date: 4/2 4-/S- I:\Building\Forms\BldgPermitRvw_COM_WithLandUse_070915.docx Jeff Peck From: Gary Pagenstecher Sent: Monday, July 27, 2015 2:31 PM To: 'Andrea Saven'; Branden Taggart; Debbie Adamski;Jeff Peck Cc: Sean Farrelly;Josh Cabot Subject: RE:Ash Avenue Apartments tree protection Tree protection in place. May issue demo permit. Gary From: Andrea Saven [mailto:Andrea(alangohansen.com] Sent: Monday, July 27, 2015 2:05 PM To: Gary Pagenstecher Cc: Sean Farrelly; Josh Cabot Subject: FW: Ash Avenue Apartments tree protection Gary, This should have been addressed to you-does this give you the information you need? Thanks Andrea Andrea Saven lango hansen landscape architects p 503.295.2437 www.Ianaohansen.com From: Kay Kinyon [mailto:kaykinyon @gmail.com] Sent: Monday,July 27, 2015 1:49 PM To:Andrea Saven<Andrea @langohansen.com>;ieffp @tgard-or.gov Cc:Todd Prager<todd @teragan.com> Subject: Re: Ash Avenue Apartments tree protection Let me know if you have any changes or corrections for the attached inspection report. DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." <SKMBT_C45215072312160.pdf5 1 Teragan & Associates, Inc. Kay Kinyon Arboricultural Consultants July 27, 2015 Jeff Peck Project Cooridinator City of Tigard 13215 SW Hall Blvd.,Tigard, OR 97223 Re: Burnham & Ash Apartments Tree Protection Inspection This is the first Tree Protection Inspection for the Burnham & Ash Apartments demolition work. These inspections will be performed two times per month through the completion of this phase of the construction work. The inspections will take on or about the 10th day and the 20th day of each month. The tree protection fence as required for this site by the Burnham& Ash Appartments Tree Protection Plan has been installed as specified with two exceptions. Orange plastic snow type fencing with a height of 4 feet has been used in place of minimum height chain link fencing with a height of 5 feet. Large concrete cylinders about 42 inched tall have been used in place of steel posts. The fence appears to be acceptable given the location of the tree and the surfaces surrounding it. The concrete cylinders appear to also be acceptable because they provide more than adequate support for the fence fabric. They are also heavy enough that it is not likely they will be moved easily in the event of impact by heavy equipment. I discussed the variations in the fence with Jeff Wagner, General Superintendent, for the contractor,Environmental &Demolition Services. He stated his work plan did not intend to have traffic near the fence as there is a large distance between the building he is removing and the tree protection fence. The protected Oregon White Oak located on the southeasterly edge of the site appears to be in good condition at this time. All other tree protection measures are being maintained at this time. The following photograph shows detail of the fence installation. 3145 Westview Circle•Lake Oswego,OR 97034 •(503)697-1975•Fax(503)697-1976• Burnham&Ash Apartments Jeff Peck Page 2 of 2 ,, v• a,: .. v , !mot Sincerely, .....4";(4644t) Kay Kinyon ISA Certified Arborist, PN-0409A PNW/ISA Board Certified Tree Risk Assessor 3145 Westview Circle•Lake Oswego,OR 97034•(503)697-1975•Fax(503)697-1976 E-mail:Terry@Teragan.com ISA Board Certified Master Arborist,#PN-0120 BMT PNW/ISA Board Certified Tree Risk Assessor,#PN-0152 Member,American Society of Consulting Arborists Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 12800 SW ASH AVE, TIGARD, OR, 97223 Commercial - Building 299 Final inspection PASS - No C of O BUP2015-00208 George Heimos NOTE: There are two abandoned manholes that were connected to the public sewer that need to be filled in with approved material or removed. OPSC 2014 722.5 Violation Summary: Inspector Contractor