Permit 1n CITY OF TIGARD BUILDING PERMIT
111 3' COMMUNITY DEVELOPMENT Permit A: BUP2015-00227
TFGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/29/2015
Parcel: 2S 104 B 607900
Jurisdiction: Tigard
Site address: 14350 SW BARROWS RD 3
Project: Growlers Doggy Day Care Subdivision: RUSSELL'S SCHOLLS FERRY Lot: A
Project Description: TI-Create dog day care facility
Contractor: SCOTTCO BUILDING&DESIGN INC Owner: SPIRIT SPE HG 2015-1 LLC
11640 SW 135TH AVE BY HAGGEN OPCO SOUTH LLC
TIGARD, OR 97223 2211 RIMLAND DR, STE 300
BELLINGHAM,WA 98226
PHONE: 503-524-6777 PHONE.
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: Vg DC Provision Review,COM TI-Ping 07/29/2015 $88.00
Occupancy Grp: B Occupancy Load: 32 Permit Fee-Additions,Alterations, 07/29/2015 $509.05
Demolition
Dwelling Units: 0 12%State Surcharge-Building 07/29/2015 $61.09
Stories: 1 Height: 0 ft Plan Review 07/29/2015 $330.88
Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 07/29/2015 $203.62
Value: $30,000 Info Process/Archiving-Sm$0.50(up to 07/29/2015 $0.50
11x17)
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $1,193.14
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Yes Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTE a . • -..n law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-00 •8 10 through OAR 9 r01-'090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.23,.1987 or 1.800.332.2344.
I sued By: ,0 / Permittee Signature: - 411
Call 503.639.4175 by 7:00 a.m.for the next available. spec • date
This permit card shall be kept in a conspicuous place on the job site until completion of th: • • •ct.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Commercial FOR OFFICE USE ONLY
CI of Ti and RECEIVED Received
`J g DateB ` d Permit No.: =_, a•— e,a -�
II q
13125 SW Hall Blvd.,Tigard,OR 9722 3 ►�1'
= Phone: 503-718-2439 Fax: 503-59 � Plan Revie 2 9 2015 Date/B : (I7. ► M7 'elated Permit:
T I G A R D Inspection Line: 503-639-4175 Date Ready • Juris: H See Page 2 for
Internet: www.tigard-or.gov CITY OF i IGARD Notified/Method: Supplemental Information
'k"7 •t !►
U. i ND 2-FAMILY DwELL1NG
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
�.
CATEGORY ONE " r ", ,,.•P, *' work indicated on this application.
❑ 1-and 2-family dwelling )4 Commercial/industrial Valuation: $
El Accessory building ❑Multi-family Number of bedrooms:
❑Master builder El Other: Number of bathrooms:
Total number of floors:
C �` ``
Job site address: I LI'3c,, f.)1),1/4) ` tt.r r'rvos ZA , New dwelling area: square feet
City/State/ZIP: _,Q.„...7.. , LJ 1� 9 Z 3 Garage/carport area: square feet
Suite/bldg./apt.#: sit Project name: e-r S--Alt Covered porch area square feet
Cross street/directions to job site: JUJ ` Deck area: square feet —
IL)ut_n,u_;4-- I)� 1 ;.- _` £ , . r Other structure area: square feet
CI • REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: I Lot#: Permit fees*are based on the value of the work performed.
Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
1e/✓c/lT! 1ltV w� t.- Valuation: $' QI OOO
Existing building area 4 p square feet
New building area: K//I square feet
9,PROPERTY OWNER ❑ TENANT Number of stories: 1 •*'T
Name: A I V s LLL, Type of construction: r j"
t.
1 Address: I4- / a ti'1 t VL 5'�YQ�� Occupancy groups: (y\
City/State/ZIP: V/,., 1 cite-4_ q JJ Existing:
Phone:60-S, 72-`r . 7 i 4 I Fax:( ) New:
❑ APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES*
Business name: IL(.v T NC' b� �1� �� �����,"" review refer to fee schedule)
I 1)D �L "d Structural plan review fee(or deposit):
Contact name: V \fb r /p� . C, FLS plan review fee(if applicable):
Address: (s,�J LQ3/V(,l., d L0,44%.- A"lJ Q- J1.tA�e_,a) 1
City/State/ZIP: Total fees due upon application:
h rt.,, A. LTQ 9-).2 I 0
Phone:( cbjy _f W„G[( I Fax::( ) Amount received:
,j Commercial . . esidential
E-mail: k ! I I [► \EY S ( l U Gf /C rQ CCSYY�
..< � ial prescriptive installation of
CONTRACT
roof-top mounted '•otoVoltaic Solar Panel System.
Business name: S(«-1�(' kti £�k S, 1._, Submit two(2)sets o oof plan with connec•• details
• and fire department acce along wi • . • 2010 Oregon
Address: !l Qe 40 �L� i` ' _ . _.4.-_tj r Solar Installation Specialty .,,• ecklist.
1 -•-� !� e� Permit fee(includes : f eview
City/State/ZIP: 1 L V 1-)2 23 and in tstra1' :•s): $180.00
Phone:(se,- 5.2_ _/ _:3. Fax:( ) State surchar•• 2%of permit fee). $21.60
CCB Lie.: 1.P 1/9670 :)b/7 To . fee due upon application: • $201.60
Authorized signal t �� This r mit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: K Date:' * Fee methodology set by Tri-County Building Industry
b T KJ , 13 1 Service Board
I:\Building\Permits\BIIP COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB)
. 2 ,
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
.74 ■
• Accessibility: Barrier Removal Improvement Plan
Commercial & Multi-Family - Additions or Alterations
T 16 A R t) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014
4 •
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
■
111P1
• Accessibility: Barrier Removal Improvement Plan
Commercial & Multi-Family - Additions or Alterations
T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [21 $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order.
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
liA0-1 `71 /9(*€.---
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014
IP4City of Tigard
a COMMUNITY DEVELOPMENT DEPARTMENT
T 1 G A R D Building Permit Review — Commercial - No Land Use
Building Permit #: 6 c..c_P o j S-c --k9-7
Site Address: 143 60 SW 13 ci rrt wi Suite/Bldg#:
Project Name: GI ro w i ers 0099 y O AticA rt
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: Ten O.A 1' -3.-m lo ro Vr,r'1'.m 't r
Existing Business Activity: 0 l n( h V t-er trIOv L i e:x.(4 J
Proposed Business Activity 0 9 �p ici r t. f trionrAl f e.ry uJ
Verify site address/suite#exists and active in permit system.
-g—River Terrace Ne hborhood: ❑ Yes ,Z No
71 Zoning: .G "
Permitted Use: izr Yes ❑ No ❑ Spec Space
A-Confirm no land use required.
Business License:
Exists: ❑ Yes /No,applicant notified to obtain business license
Notes:
Approved by Planning: M Q Vt , G%(o o J.. j4, .. Date: 7/2.6 / 1,S
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: . 11V9//c
Site Plans: # v
Building Plans: # 3
Building Permit#: Enter building permit#above.
Workflow Routing: aPlanning ator Er gilding
Workflow Sign-off: ❑-S -off for Planning(include notes from planning review)
Route Application Documents: Building. original permit application,site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
e--
Notes: Q
By Permit Technicia Date: 7/
I:\Building\Forms\BldgPermitRvw_COM NoLandUse_070915.docx
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved, NOT Release.: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applic. - :
Revision Notice 2: Date Sent to : .. 'cant:
Revision Notice 3: Date Se. o Applicant:
❑ SDC Fees Entered: .f ash Co Trans Dev Tax: ❑ Yes ❑ N/A
Tigard Trans SDC: ❑ Yes ❑ N/A
Parks SDC: ❑ Yes ❑ N/A
❑ OK to Issue Permit
Approved by Permit Coordinator: Date:
1:\Building\Forms\BldgPermitRvw_COM_NoLandUse_070915.docx
lig ' Building Division
Over-The-Counter (OTC) Building Permit
r l GAR° Check List
Project Description: T
APPLICATION SPECIFIC INFORMATION
GENERAL INFORMATION _
Class of Work*: ALT Occupancy Group: Type of Construction: r-4...
Type of Use**: (1Cy(,1 _ Occupancy Load: 32_,... Oregon Specialty Code:
SPECIFICS
Number of Stories: t Building Height: Mixed Use:
Number of Dw Units: Number of Bathrooms: Number of Bedrooms:
BUILDING SQ FT-SCHOOL CET OTHER SQUARE FOOTAGES
Story Square Footage: Accessory Structure: Covered Porch:
Basement: Garage: Deck:
Total Square Footage: Carport: Mezzanine:
SETBACKS
Sideyard Setback—Left Sideyard Setback—Front
Sideyard Setback—Right Sideyard Setback—Back
CONSTRUCTION
Exterior Walls: Openings Protected: Firewall Separation:
N: S: N: S: Occupancy Separation:
E: W: E: W: Access.Parking Spaces:
REQUIRED ITEMS
Fire Sprinklers: (et<j Fire Alarms: Smoke Detectors:
Sprinkler Type: Alarm Type: Protected Corridors:
Standpipe Required: Pull Stations Required: Parapet:
Hazard Group: Battery Calcs Provided:
Density: Cut Sheets Provided:
Design Area:
K Factor:
Total Project Valuation: $ wi FEES DUE
$ DC Prov Rvw,COM TI—Plug
$ r►"..05 Permit Fee—Add,Alt,Demo
DC Provision Review Fee for COM TI(effective 7/1/2015) $ ,/►" 12%State Surcharge
Project Valuation Planning $ 7i1, Plan Review,Structural
Up to$4,999 $0.00 $ 203,02 Plan Review,Fire Life Safety
$5,000-$74,999 $88.00 $ Info Proc/Arch,Lg(over 11x17$2.00)
$75,000-$149,999 $220.00 $ ,'Db Info Proc/Arch,Sm(up to 11x17$0.50)
$150,000 and over $351.00 $ Metro Construction Excise Tax
$ School Construction Excise Tax
$ Hourly Rate Fee
$ Hourly Rate State Surcharge
$ Misc.Admin Fee
$ Other:
$ I ther:
$ Othe
Building Staff: Other:
�i
Date/Time: $ ((13 A T+s • FEES DUE
*TYPE OF USE: COM=commercial;CMS=commercial manufactured structure. -
**CLASS OF WORK ACS=accessory;ADD=addition;ADU=accessory dwelling unit;ALT=alteration;DEM=demo;NEW=new;
OTR=other(use for fences,decks,retaining walls,signs,awnings or canopies).
I:\Building\Forms\OTC_BUP_070115.docx
Location:
Record Type:
Inspection Type:
Result:
Comments:
Inspection Date:
Record ID:
Inspector:
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
14350 SW BARROWS RD 3, TIGARD, OR,
97223
Commercial - Building
299 Final inspection
PASS - C of O
February 18, 2016 at 10:52:01
AM
BUP2015-00227
Chip Barnett
Violation Summary:
Inspector Contractor