Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Specifications
T€ s26114- 000ba. - R,co Li o sw -r.a and HYDRAULIC DESIGN INFORMATION SHEET - NAME c-014 yTIZON!}C DATE I /41 ►4. ' LOCATION -1. ' D S — ND _ 'f 0 IQ BUILDING 615P lb SYSTEM NO. CONTRACTOR f CONTRACT NO. 130)(E' CALCULATED BY PE/II.SDIV DRAWING NO. CONSTRUCTION: JJ� COMBUSTIBLE E3 NON-COMBUSTIBLE CEILING HEIGHT �4 FT. OCCUPANCY SA(.�5 p w 0SE ❑ NFPA 13: p LT. HAZ. ORD. HAZ. GP. 1 ❑ 2 p 3 EX. HAZ. ❑ NFPA 231 NFPA 231C: FIGURE !r•2•()•Z d ; CURVE E E3 O ❑ OTHER (Specify) — w ❑ SPECIFIC RULING MADE BY DATE 0 L AREA OF SPRINKLER OPERATION Z SYSTEM TYPE I- DENSITY •Sd ® WET ❑ DRY ❑ DELUGE ❑ PRE-ACTION co,- AREA PER SPRINKLER I 01 SPRINKLER OR NOZZLE L� HOSE ALLOWANCE GPM: INSIDE MAKE TYGb _ MODEL HOSE ALLOWANCE GPM: OUTSIDE SOD SIZE— 3/4 K-FACTOR II•7, RACK SPRINKLER ALLOWANCE TEMPERATURE RATING 254' CALCULATION GPM REQUIRED f D23 PSI REQUIRED 9.12'3 AT BASE OF RISER . SUMMARY "C" FACTOR USED: OVERHEAD MC> UNDERGROUND I4•v s PIT:ER Fl OW TEST PUf.1P_DAIA TA.NK_Oi3PESERVOIfl y. DATE & TIME b T•ZbIb RATED CAPACITY CAPACITY J d STATIC PSI 103 AT PSI ELEVATION a RESIDUAL PSI ELEVATION D c" GPM FLOWING - I�6 WELL, W ELEVATION PROOF FLOW GPM i- < • LOCATION l(.Z/d Sv)- 72". SOURCE OF INFORMATION - COMMODITY- CLASS 4 LOCATION w STORAGE HEIGHT __20: AREA __ AISLE WIDTH IIt Q• STORAGE METHOD: SOLID PILED % PALLETIZED % RACK % Cr O ❑ SINGLE ROW• ❑ CONVENTIONAL PALLET ❑ AUTOMATIC STORAGE ❑ ENCAPSULATED >- gii: DOUBLE ROW ❑ SLAVE PALLET j] SOLID SHELVING ❑ NON- I- ' ❑ MULTIPLE ROW (] OPEN ENCAPSULATED Y - — -- ------ - - — —— — O z a FLUE SPACING IN INCHES CLEARANCE FROM TOP OF S1ORAGE TO CEILING O LONGITUDINAL TRANSVERSE _ 4 FT. O IN, HORIZONTAL BARRIERS PROVIDED ______ 'ISO Form SPRS-9 • HYDRAULIC CALCULATIONS for Job Information Project Name:COPYTRONIX Contract No.: City: PORTLAND, OR 97225 Project Location: 16640 SW 72ND AVE Date:1/3/2014 Contractor Information Name of Contractor: Address: City: Phone Number: E-mail: Name of Designer: Authority Having Jurisdiction: CITY OF TIGARD Design Remote Area Name Remote Area Remote Area Location Occupancy Classification Density(gpm/ft2) 0.5 Area of Application(ft2) 2000 Coverage per Sprinkler(ft') 100 Number of Calculated Sprinklers 20 In-Rack Demand(gpm) 0 Special Heads Hose Streams(gpm) 500 Total Water Required(incl. Hose Streams)(gpm) 1523.3 Required Pressure at Source(psi) 52.3 Type of System Wet Volume-Entire System (gal) 1181.8 gal Water Supply Information Date Location Source Public Supply Notes A File:C:\Users\Ashley\Documents\Projects\COPYTRONIX.tyc3 Date 1/3/2014 Copyright©2002-2012 Tyco Fire Protection Products Page 1 • Job:COPYTRONIX • Node Labels: Off • Pipe Labels: Off Diagram for Design Area : Remote Area 1.40011■141144411'. File:C:1Users\Ashley\Documents\Projects\COPYTRONIX.tyc3 Date 1/3/2014 Copyright®2002-2012 Tyco Fire Protection Products Page 2 Job:COPYTRONIX Hydraulic Analysis for : Remote Area Calculation Info Calculation Mode Demand Hydraulic Model Hazen-Williams Fluid Name Water @ 60F (15.6C) Fluid Weight, (Ib/ft3) N/A for Hazen-Williams calculation. Fluid Dynamic Viscosity, (Ib•s/ft2) N/A for Hazen-Williams calculation. Water Supply Parameters Supply 1 : srcl Flow(gpm) Pressure(psi) 0 103 1964 92 Hoses Inside Hose Flow/Standpipe Demand(gpm) Outside Hose Flow(gpm) Additional Outside Hose Flow(gpm) 500 Other(custom defined) Hose Flow(gpm) Total Hose Flow(gpm) 500 Sprinklers Ovehead Sprinkler Flow(gpm) 1023.3 InRack Sprinkler Flow(gpm) 0 Other(custom defined)Sprinkler Flow(gpm) 0 Total Sprinkler Flow(gpm) 1023.3 Other Required Margin of Safety(psi) 0 Base of Riser -Pressure(psi) 52.3 Base of Riser -Flow(gpm) 1023.3 Demand w/o System Pump(s) N/A File:C:\Users\Ashley1Documents\Projects\COPYTRONIX.tyc3 Date 1/3/2014 Copyright©2002-2012 Tyco Fire Protection Products Page 3 • Job: COPYTRONIX ' Hydraulic Analysis for : Remote Area f Supply Supply; Add. Out. Hose f System Demand 150 ,rw M1i: _! F MEN _ 130 - _ EM 120 --:-_' ------ -- wwr=w.�r _. . 11 -'i,1111------- -- ---- wi. ---•._. 100 =Ils<1 �----- 32 9055 CL 90_ — i 80-r 1 - wa 1E ---- NI... Cl) 70: w�wry ww•..w�wr.�=�.w t/1 - ` w UNIN �� i iww■trawwtiwr . 60 _ .'NJ '.:'r D2 rw w� wry 50_ . . r.�w 11======= 30 .-_. --l= ---- � ,�...rm. 2 D1 _ - - -� ---. w�ww� —. - w 0 ii iii...... .MIMIw IMIM=Mwwwww∎∎∎∎�11111•1111111Mw■w■w■w■w.w.r 0 60000300)001 00010012001300140015001600 1700 1800 1900 2000 2101 Flow, gpm File:C:\Users\.Ashley\Documents\Projects\COPYTRONIX.tyc3 Date 1/3/2014 Copyright©2002-2012 Tyco Fire Protection Products Page 4 Job:COPYTRONIX Hydraulic Analysis for : Remote Area Graph Labels Values Label Description Flow (gpm) Pressure (psi) S1 Supply point#1 -Static 0 103 S2 Supply point#2-Residual 1964 92 D1 Elevation Pressure 0 11.5 D2 System Demand 1023.3 52.3 Curve Intersections & Safety Margins Curve Name Intersection Safety Margin ___ `Pressure (psi) Flow (gpm) Pressure (psi) @ Flow (gpm) Supply 96.2 1517.9 47.4 1023.3 Supply;Add.Out.Hose 91.9 1475.8 43.8 1523.3 Open Heads Required Calculated Head Ref. Head Type Coverage K-Factor Density Flow Pressure Density Flow Pressure (ft2) (gpm/psl1/2) (gpm/ft2) (gpm) (psi) (gpm/ft2) (gpm) (psi) h9 Sprinkler Overhead ■ 100 11.2 0.5 30 19.9 0.527 52.7 22.2 h10 Overhead 100 11.2 0.5 30 19.9 0.508 50.8 20.6 • Sprinkler h11 Overhead 100 11.2 0.5 30 19.9 0.506 50.6 20.4 Sprinkler h12 Overhead 100 11.2 0.5 30 19.9 0.508 50.8 20.5 Sprinkler h13 Overhead 100 11.2 0.5 30 19.9 0.525 52.5 22 Sprinkler h16 Overhead 100 11.2 0.5 30 19.9 0.521 52.1 21.6 Sprinkler h17 Overhead 100 11.2 0.5 30 19.9 0.502 50.2 20.1 Sprinkler h18 Overhead 100 11.2 0.5 30 19.9 0.5 50 19.9 Sprinkler h19 Overhead 100 11.2 0.5 30 19.9 0.502 50.2 20.1 Sprinkler h20 Overhead 100 11.2 0.5 30 19.9 0.519 51.9 21.4 Sprinkler h23 Overhead 100 11.2 0.5 30 19.9 0.523 52.3 21.8 Sprinkler h24 Overhead 100 11.2 0.5 30 19.9 0.504 50.4 20.2 Sprinkler h25 Overhead 100 11.2 0.5 30 19.9 0.501 50.1 20 Sprinkler File:C:\Users\Ashley\Documents 1Projects\COPYTRONIX.tyc3 Date 1/3/2014 Copyright©2002-2012 Tyco Fire Protection Products Page 5 h26 Overhead 100 11.2 0.5 30 19.9 0.503 50.3 20.2 Sprinkler h27 Overhead 100 11.2 0.5 30 19.9 0.52 52 21.6 • Sprinkler h30 Overhead 100 11.2 0.5 30 19.9 0.526 52.6 22 Sprinkler h31 Overhead 100 11.2 0.5 30 19.9 0.507 50.7 20.5 Sprinkler h32 Overhead 100 11.2 0.5 30 19.9 0.504 50.4 20.2 Sprinkler h33 Overhead 100 11.2 0.5 30 19.9 0.506 50.6 20.4 Sprinkler h34 Overhead 100 11.2 0.5 30 19.9 0.523 52.3 21.8 Sprinkler File:C:\Users\Ashley\Documents\Projects\COPYTRONIX.tyc3 Date 1/3/2014 Copyright C 2002-2012 Tyco Fire Protection Products Page 6 Job:COPYTRONIX Hydraulic Calculations/Fluid Delivery Time Analysis Node Data Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres. Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge gpm/psis/z gpm ft2 psi psi • ft gpm gpm/ft2 psi gpm srcl Supply 1023.3 52.3 -3 SUPPLY 0 n1 Node 52 -3 NODE 0 n2 Node 51.7 -3 NODE 0 n3 Node 49.8 1 NODE -1.7 n4 Node 48.9 3 NODE -2.6 n5 Node 40.2 22 NODE -10.8 n6 Node 39.4 22 NODE -10.8 n7 Node 39.3 22 NODE -10.8 n8 Node 38.8 22 NODE -10.8 n9 Node 38.4 • 22 NODE -10.8 n10 Node 36.9 22 NODE -10.8 n11 Node 36.3 22 NODE -10.8 n12 Node 34.4 22 NODE -10.8 n15 Node 32.1 22 NODE -10.8 n16 Node 31.6 22 NODE -10.8 n17 Node 30.9 22 NODE -10.8 n18 Node 30.6 22 NODE -10.8 n19 Node 30.4 22 NODE -10.8 n20 Node 30.4 22 NODE -10.8 n23 Node 31.5 23.5 NODE -11.5 n24 Node 30.9 23.5 NODE -11.5 n25 Node 28.6 23.5 NODE -11.5 n26 Node 28.2 23.5 NODE -11.5 • n27 Node 28.1 23.5 NODE -11.5 n28 Node 28.8 23.5 NODE -11.5 File:C:\Users\Ashley\Documents\Projects\COPYTRONIX.tyc3 Date 1/3/2014 Copyright©2002-2012 Tyco Fire Protection Products Page 7 • Job:COPYTRONIX Hydraulic Calculations/Fluid Delivery Time Analysis Node Data Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres. Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge • gpm/psi1/2 gpm ft2 psi psi ft gpm gpm/ft2 psi gpm h9 Overhead Sprinkler 11.2 52.7 100 22.2 19.9 23.5 HEAD Open 22.7 0.527 -11.5 30 h10 Overhead Sprinkler 11.2 50.8 100 20.6 19.9 23.5 HEAD Open 20.8 0.508 -11.5 30 hll Overhead Sprinkler 11.2 50.6 100 20.4 19.9 23.5 HEAD Open 20.6 0.506 -11.5 30 h12 Overhead Sprinkler 11.2 50.8 100 20.5 19.9 23.5 HEAD Open 20.8 0.508 -11.5 30 h13 Overhead Sprinkler 11.2 52.5 100 22 19.9 23.5 HEAD Open 22.5 0.525 -11.5 30 h16 Overhead Sprinkler 11.2 52.1 100 21.6 19.9 23.5 HEAD Open 22.1 0.521 -11.5 30 h17 Overhead Sprinkler 11.2 50.2 100 20.1 19.9 23.5 HEAD Open 20.2 0.502 -11.5 30 h18 Overhead Sprinkler 11.2 50 100 19.9 19.9 23.5 HEAD Open 20 0.5 -11.5 30 h19 Overhead Sprinkler 11.2 50.2 100 20.1 19.9 23.5 HEAD Open 20.2 0.502 -11.5 30 h20 Overhead Sprinkler 11.2 51.9 100 21.4 19.9 • 23.5 HEAD Open 21.9 0.519 -11.5 30 h23 Overhead Sprinkler 11.2 52.3 100 21.8 19.9 23.5 HEAD Open 22.3 0.523 -11.5 30 • h24 Overhead Sprinkler 11.2 50.4 100 20.2 19.9 23.5 HEAD Open 20.4 0.504 -11.5 30 h25 Overhead Sprinkler 11.2 50.1 100 20 19.9 23.5 HEAD Open 20.1 0.501 -11.5 30 h26 Overhead Sprinkler 11.2 50.3 100 20.2 19.9 23.5 HEAD Open 20.3 0.503 -11.5 30 h27 Overhead Sprinkler 11.2 52 100 21.6 19.9 23.5 HEAD Open 22 0.52 -11.5 30 h30 Overhead Sprinkler 11.2 52.6 100 22 19.9 23.5 HEAD Open 22.6 0.526 -11.5 30 h31 Overhead Sprinkler 11.2 50.7 100 20.5 19.9 23.5 HEAD Open 20.7 0.507 -11.5 30 h32 Overhead Sprinkler 11.2 50.4 100 20.2 19.9 23.5 HEAD Open 20.4 0.504 -11.5 30 h33 Overhead Sprinkler 11.2 50.6 100 20.4 19.9 23.5 HEAD Open 20.6 0.506 -11.5 30 h34 Overhead Sprinkler 11.2 52.3 100 21.8 19.9 23.5 HEAD Open 22.3 0.523 -11.5 30 n29 Node 29.3 23.5 NODE -11.5 n30 Node 28.6 23.5 NODE -11.5 n31 Node 28.8 23.5 NODE -11.5 ' n32 Node 29.1 23.5 NODE -11.5 n33 Node 31.3 • 23.5 NODE -11.5 File:C:\Users\Ashley\Documents\Projects\COPYTRONIX.tyc3 Date 1/3/2014 Copyright©2002-2012 Tyco Fire Protection Products Page 8 Job:COPYTRONIX Hydraulic Calculations/Fluid Delivery Time Analysis Node Data ' Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres. Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge m ft2 psi psi ft 9Pm/Psis/z gpm gpm/ft2 psi gpm n34 Node 31.8 23.5 NODE -11.5 n37 Node 30.8 22 NODE -10.8 n38 Node 30.9 22 NODE -10.8 n39 Node 31 22 NODE -10.8 n40 Node 31.4 22 NODE -10.8 n43 Node 32.5 22 NODE -10.8 n44 Node 31.9 22 NODE -10.8 • File:C:\Users\Ashley\Documents\Projects\COPYTRONIX.tyc3 Date 1/3/2014 Copyright©2002-2012 Tyco Fire Protection Products Page 9 • Job name:COPYTRONIX Sheet number: PIPE INFORMATION Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt) Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES T frict (Pf) (ft) (gpm/Psll/2) (gpm) (in) (ft) (ft) (Psi) (psi) h18 23.5 11.2 50 1.5 9.58 120 19.9 h17 23.5 11.2 26.9 1.68 0 0.0227 0 9.58 0.2 h17 23.5 11.2 50.2 1.5 9.58 120 20.1 h16 23.5 11.2 77.2 1.68 0 0.1595 0 9.58 1.5 h16 23.5 11.2 52.1 1.5 lx(us.90)=4.92 10.58 120 21.6 n27 23.5 129.3 1.68 4.92 0.4147 0 15.5 6.4 n27 23.5 0 2 lx(us.Tee-Br)=12.31 1.5 120 28.1 n19 22 129.3 2.157 12.31 0.1228 0.6 13.81 1.7 n19 22 131 4 10.33 120 30.4 n18 22 260.2 4.26 0 0.0163 0 10.33 0.2 n18 22 129.7 4 10.33 120 30.6 n17 22 389.9 4.26 0 0.0345 0 10.33 0.4 n17 22 130.5 4 10.33 120 30.9 n16 22 520.4 4.26 0 0.0589 0 10.33 0.6 _ • n16 22 -12.3 4 10.33 120 31.6 n15 22 508.1 4.26 0 0.0563 0 10.33 0.6 n15 22 -12.5 4 lx(us.90)=13.17 29.49 120 32.1 n12 22 495.6 4.26 13.17 0.0538 0 42.66 2.3 n12 22 0 4 lx(us.90)=13.17 32 120 34.4 n10 22 495.6 4.26 13.17 0.0538 0 45.17 2.4 n10 22 0 5 1x(coupling)=1 63.5 120 36.9 n9 22 495.6 5.047 1 0.0236 0 64.5 1.5 n9 22 0 6 lx(us.90)=14 96.5 120 38.4 n6 22 495.6 6.065 14 0.0096 0 110.5 1.1 n6 22 0 6 lx(us.Tee-Br)=30 44 120 39.4 n5 22 495.6 6.065 30 0.0096 0 74 0.7 n5 22 527.7 8 19 0 40.2 Check 590 n4 3 1023.3 0 0 0.027 8.2 19 0.5 n4 3 0 8 2 0 48.9 Gate A2360 n3 1 1023.3 0 0 0.0057 0.9 2 0.0 n3 1 0 8 lx(us.90)=18.43 4 120 49.8 n2 -3 1023.3 8.11 18.43 0.009 1.7 22.43 0.2 • n2 -3 0 8 lx(us.90)=18.43 14 120 51.7 n1 -3 1023.3 8.11 18.43 0.009 0 32.43 0.3 nl -3 0 10 103 120 52 srcl -3 1023.3 10.1 0 0.0031 0 103 0.3 ©2006 National Fire Protection Association Page 10 • Job name:COPYTRONIX Sheet number: PIPE INFORMATION • Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt) Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES T frict (Pf) (ft) (gpm/psis/x) (gpm) (in) (ft) (ft) (psi) (psi) h18 23.5 11.2 50 1.5 9.58 120 19.9 h19 23.5 11.2 23 1.68 0 0.017 0 9.58 0.2 h19 23.5 11.2 50.2 1.5 9.58 120 20.1 h20 23.5 11.2 73.2 1.68 0 0.1447 0 9.58 1.4 h20 23.5 11.2 51.9 1.5 lx(us.Tee-Br)=9.84 8.58 120 21.4 n30 23.5 125.1 1.68 9.84 0.3901 0 18.42 7.2 n30 23.5 0 2 lx(us.Tee-Br)=12.31 1.5 120 28.6 n38 22 125.1 2.157 12.31 0.1155 0.6 13.81 1.6 n38 22 126.4 4 10.33 120 30.9 n39 22 251.5 4.26 0 0.0153 0 10.33 0.2 n39 22 125.4 4 10.33 120 31 n40 22 376.9 4.26 0 0.0324 0 _ 10.33 0.3 n40 22 126 4 10.33 120 31.4 n44 22 502.9 4.26 0 0.0553 0 10.33 0.6 ' n44 22 12.3 4 10.33 120 31.9 n43 22 515.2 4.26 0 0.0578 0 10.33 0.6 n43 22 12.5 4 1x(coupling)=1.32 60.49 120 32.5 n11 22 527.7 4.26 1.32 0.0604 0 61.81 3.7 n11 22 0 5 lx(coupling)=1 95 120 36.3 n8 22 527.7 5.047 1 0.0265 0 96 2.5 n8 22 0 6 lx(us.90)=14 34 120 38.8 n7 22 527.7 6.065 14 0.0108 0 48 0.5 n7 22 0 6 lx(us.Tee-Br)=30 45.48 120 39.3 n5 22 527.7 6.065 30 0.0108 0 75.48 0.8 h25 23.5 11.2 50.1 1.5 9.58 120 20 h24 23.5 11.2 27 1.68 0 0.0229 0 9.58 0.2 h24 23.5 11.2 50.4 1.5 9.58 120 20.2 h23 23.5 11.2 77.4 1.68 , 0 0.1604 0 9.58 1.5 h23 23.5 11.2 52.3 1.5 lx(us.90)=4.92 10.58 120 21.8 n26 23.5 129.7 1.68 4.92 0.417 0 15.5 6.5 n26 23.5 0 2 lx(us.Tee-Br)=12.31 1.5 120 28.2 n18 22 129.7 2.157 12.31 0.1235 0.6 13.81 1.7 • h25 23.5 11.2 50.1 1.5 9.58 120 20 h26 23.5 11.2 23.1 1.68 0 0.017 0 9.58 0.2 • h26 23.5 11.2 50.3 1.5 9.58 120 20.2 h27 23.5 11.2 73.4 1.68 0 0.1453 0 9.58 1.4 ©2006 National Fire Protection Association Page 11 Job name:COPYTRONIX Sheet number: PIPE INFORMATION ' Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt) Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES T frict (Pf) (ft) (gpm/Psis/x) (gpm) (in) (ft) (ft) (Psi) (psi) h27 23.5 11.2 52 1.5 lx(us.Tee-Br)=9.84 8.58 120 21.6 n31 23.5 125.4 1.68 9.84 0.3919 0 18.42 7.2 n31 23.5 0 2 lx(us.Tee-Br)=12.31 1.5 120 28.8 n39 22 125.4 2.157 12.31 0.116 0.6 13.81 1.6 h32 23.5 11.2 50.4 1.5 9.58 120 20.2 h31 23.5 11.2 27.3 1.68 0 0.0232 0 9.58 0.2 h31 23.5 11.2 50.7 1.5 9.58 120 20.5 h30 23.5 11.2 77.9 1.68 0 0.1625 0 9.58 1.6 h30 23.5 11.2 52.6 1.5 lx(us.90)=4.92 10.58 120 22 n25 23.5 130.5 1.68 4.92 0.422 0 15.5 6.5 n25 23.5 0 2 lx(us.Tee-Br)=12.31 1.5 120 28.6 n17 22 130.5 2.157 12.31 0.125 0.6 13.81 1.7 h32 23.5 11.2 50.4 1.5 9.58 120 20.2 h33 23.5 11.2 23.1 1.68 0 0.0171 0 9.58 0.2 h33 23.5 11.2 50.6 1.5 9.58 120 20.4 h34 23.5 11.2 73.7 1.68 0 0.1466 0 9.58 1.4 h34 23.5 11.2 52.3 1.5 lx(us.Tee-Br)=9.84 8.58 120 21.8 n32 23.5 126 1.68 9.84 0.3957 0 18.42 7.3 _ n32 23.5 0 2 lx(us.Tee-Br)=12.31 1.5 120 29.1 n40 22 126 2.157 12.31 0.1172 0.6 13.81 1.6- h l l 23.5 11.2 50.6 1.5 9.58 120 20.4 h10 23.5 11.2 27.4 1.68 0 0.0234 0 9.58 0.2 h10 23.5 11.2 50.8 1.5 9.58 120 20.6 h9 23.5 11.2 78.2 1.68 0 0.1636 0 9.58 1.6 h9 23.5 11.2 52.7 1.5 lx(us.90)=4.92 10.58 120 22.2 n28 23.5 131 1.68 4.92 0.4249 0 15.5 6.6 n28 23.5 0 2 lx(us.90)=6.15 1.5 120 28.8 n20 22 131 2.157 6.15 0.1258 0.6 _ 7.65 1 n20 22 0 4 10.33 120 30.4 n19 22 131 4.26 0 0.0046 0 10.33 0.0 hll 23.5 11.2 50.6 1.5 9.58 120 20.4 h12 23.5 11.2 23.2 1.68 0 0.0172 0 9.58 0.2 . h12 23.5 11.2 50.8 1.5 9.58 120 20.5 h13 23.5 11.2 73.9 1.68 0 0.1473 0 9.58 1.4 h13 23.5 11.2 52.5 1.5 1x(us.Tee-Br)=9.84 8.58 120 22 n29 23.5 126.4 1.68 9.84 0.3979 0 18.42 7.3 ©2006 National Fire Protection Association Page 12 Job name:COPYTRONIX Sheet number: PIPE INFORMATION ' Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt) Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES T frict (Pf) (ft) (gpm/psi'/z) (gpm) (in) (ft) (ft) (psi) (psi) n29 23.5 0 2 lx(us.90)=6.15 1.5 120 29.3 n37 22 126.4 2.157 6.15 0.1178 0.6 7.65 0.9 n37 22 0 4 10.33 120 30.8 n38 22 126.4 4.26 0 0.0043 0 10.33 0.0 n16 22 0 2 1x(us.Tee-Br)=12.31 1.5 120 31.6 n24 23.5 12.3 2.157 12.31 0.0016 -0.6 13.81 0.0 n24 23.5 0 1.5 lx(us.90)=4.92 57.48 120 30.9 n33 23.5 12.3 1.68 4.92 0.0053 0 62.4 0.3 n33 23.5 0 2 2x(us.Tee-Br)=24.61 1.5 120 31.3 n44 22 12.3 2.157 24.61 0.0016 0.6 26.11 0.0 n15 22 0 2 lx(us.Tee-Br)=12.31 1.5 120 32.1 n23 23.5 12.5 2.157 12.31 0.0016 -0.6 13.81 0.0 n23 23.5 0 1.5 lx(us.90)=4.92 57.48 120 31.5 n34 23.5 12.5 1.68 4.92 0.0055 0 62.4 0.3 n34 23.5 0 2 2x(us.Tee-Br)=24.61 1.5 120 31.8 n43 22 12.5 2.157 24.61 0.0016 0.6 26.11 0.0 * Discharge shown for flowing nodes only • ©2006 National Fire Protection Association Page 13 . G.P.M. MULTIPLY SCALE BY 15o an 0 1 2 3 7 8 9 10 11 12 /11111../.Ra■■■■w�•IRI1• iam..:.�••r���_�•11_�������_ 13 14 15 111 ■..RR■■■w•1•i•1__•1•riRiBa_a.rmi==�•••■_�r••r� NM aI1r11=...•R•■■■w•1 ��•1�_•0•R�•••w _` —��_ ••_a I IHI/...■R••■Ma.MI�_om________=aa•■`i"�H��� � 1 11111111/I■a■■M-w-ral••••�__a■__�_a■_�_w-_�_ � 111111.s ■■a■a■aw.ta__■1_____wI_••••_•••wiR_� I■a M ��� . 111..f:.•••■a•Iw•ri_ MI_r_ ___ •♦ � i=ii# :i:: �wiiil'1i1= II-ir=e=== ____ ��� - °'1 111#ililiCiC///■��!•••�•....i•�1 ■���°� wii ........__ , rilmiiIICC1////mmi_!!mminu��_ ■ ■!iI1111111IIIIUhIIIIIItU1IIIuRIIiI1 I..C..•1...w1.___1_=■`•...� _ 144 4p� Flol�l/��t IIrr1IIII.•■aa erm••I_MI_ ___a■rrn.raraa Mar -' p rIriverrr�mrSA , 4 i e 92 Pst I SID°'UM • w _� _aa wwawaw Ill. ■.•1■awMM ww. ___ _ Ma•M 111 /!.••••■a•1 ■ . 1 1911:■.■.•••■■■.:: ___-__1 �.� �� _ i I�1�1 eiliiiririiiiiiia_'�i�EE�_�ii=l lES=Harr r_ s ��"�1 III IE llIIIIiI!iiIii ! i-- _ 1=====-- _ '�— �.._ Ali# 1111r.°.■. .. -ti-OS- I®3= _ - - - : __:- �s"s Mil `300 GPI" E — - —. ....... �� 1 Bill IIIII juiiojjgiiii _ - _ E :■ . _ I: ! _ _ Malt �Nrt—��.� MI . MEE MIN It solNKGeie vM, r►D 49Mn 5�.8 PS l _1 - - - _. .- -- - .. .- . - -_ - •-- - - - . _. .. . -.-_ -- -_.._._. . _ ._- - ----I _ _ ill Irl in 11ii a lil 1! 1..::1�•1-I=■�r~immrrl•-i•i—_= ��l=r. ■�__ ■ _Haw ww �_� 111,1111 wIN=;r'ISw�� .' .' _ - - -- =� M iiiiPIHiffIiIuuIijqq ...._....IMEIN a. ....._ _ . .... ..____EmE 1 i JiJdiilhiiIiiIiIIiHIIIIIh■ -_ NEE i. vi ���® � _.....: . - �..._.. ... 0: to i II ■•w ■■■ w ��-----7" I 111. ■..a•a ■■wla rA till II MN _____ .- 1.11a1 1 =■aiiI . 1■= ilmileimillitillillENE T. =Mal• a---- iihm•••••minu 11111 LAME 111M1 . • e'o,yrIorn SioP /ME/10 Ot3P ' lc. t111111 Worldwide Fire Protection Contacts www.tyco-fire.com Products Model LD — 11.2 K-factor Large Drop Upright Sprinkler, Standard Response Control Mode Specific Application General Sprinkler .,-4 = Description Identification A The TYCO Model LD, 11.2 K-factor Number i Large Drop Upright Sprinkler,Standard ' Response Control Mode Specific AP- TY5153-Upright, 11.2 K ' -44 ., plication is a glass bulb type automat- TY5153 is a redesignation of 05153 is sprinkler. It is intended for use with the National Fire Protection Associa- 'Technical tion "large drop sprinkler" installation ` .. criteria for the protection of high piled storage. The LD Sprinkler can provide Data a higher level of protection than stan- Operation dard spray sprinklers and, in some cas- Approvals es,can provide an economic advantage UL and C-UL Listed. NYC Approved The glass bulb contains a fluid that ex- by eliminating in-rack sprinklers. under MEA 289-04-E pands when exposed to heat.When the rated temperature is reached,the fluid NOTICE Maximum Working Pressure expands sufficiently to shatter the glass 175 psi(12,1 bar) bulb, allowing the sprinkler to activate The TYCO Model LD 11.2 K-factor, and flow water. Large Drop Upright Sprinkler described Pipe Thread Connection herein must be installed and maintained 3/4 inch NPT or ISO 7-R3/4 • in compliance with this document, as installation well as with the applicable standards Discharge Coefficients of the National Fire Protection Asso K= 11.2 GPM/psili2 The Model LD Sprinklers must be in- ciation, in addition to the standards of (161,3 LPM/barv2) stalled in accordance with this section. any other authorities having jurisdiction. Temperature Ratings General Instructions Failure to do so may impair the perfor- 155°F(68°C), 200°F(93°C), Do not install any bulb type sprinkler if mance of these devices. and 286°F(142°C) the bulb is cracked or there is a loss The owner is responsible for maintain- of liquid from the bulb.With the sprin- Finish ing their fire protection system and de- Natural Brass kler held horizontal, a small air bubble vices in proper operating condition. should be present.The diameter of the Contact the installing contractor or Physical Characteristics air bubble is approximately 1/16 inch manufacturer with any questions. Frame Bronze (1,6 mm) for the 155°F (68°C) rating Button Bronze and 3/32 inch (2,4 mm)for the 286°F (142°C)rating. Sealing Assembly Beryllium Nickel with TEFLON A leak tight 3/4 inch NPT sprinkler joint Bulb Glass(5mm dia.) should be obtained with a torque of 7 to 20 ft.-lbs. (13,4 to 26,8 Nm). Higher Compression Screw Brass levels of torque can distort the sprin- Deflector Bronze kler Inlet with consequent leakage or impairment of the sprinkler. Design Step 1. With pipe thread sealant ap- IMPORTANT plied to the pipe threads, hand tighten Always refer to Technical Data Criteria the Model LD Sprinkler into the sprin- Sheet TFP700 for the "INSTALLER kler fitting. The TYCO Model LD, 11.2 K-factor WARNING"that provides cautions Large Drop Upright Sprinkler,Standard Step 2. Using the W-Type 3 (End B) with respect to handling and instal Response Control Mode Specific Ap Sprinkler Wrench (Figure 2) applied to lation of sprinkler systems and corn- the sprinkler Wrench Flats (Figure 1), plication is only for use with National ponents. Improper handling and in- Fire Protection Association"large drop tighten the Ultra K17 Sprinkler into the stallation can permanently damage sprinkler" installation criteria. sprinkler fitting. a sprinkler system or its compo- nents and cause the sprinkler to fail • to operate in a fire situation or cause it to operate prematurely. Page 1 of 2 .DECEMBER 2013 TFP335 . • TFP335 Page 2 of 2 . 1 - Frame 4 - Sealing * Temperature rating ** Pipe thread connections G 2 - Bulb Assembly is indicated on per ISO 7-1 can be WRENCH 3 - Compression 5 - Button Deflector. provided on special RECESS Screw 6 - Deflector* request. (END"B") 3'■ \6* APPLY '� WRENCH AS 2 3/8" 2 5 SHOWN WRENCH (60,3 mm) " �_� FLAT 0{ 1 ' 4 W--TYPE 3 3/4" SPRINKLER WRENCH NPT** X V 1/2"(12,7 mm) A NOMINAL MAKE-IN CROSS UPRIGHT SECTION FIGURE 1 ULTRA K17, 155°F(68°C)&200°F(93°C), UPRIGHT SPRINKLER(TY7153) Care and The owner is responsible for the in- spection,testing, and maintenance of Maintenance their fire protection system and devices in compliance with this document, as The TYCO Model LD, 11.2 K-factor well as with the applicable standards of • Large Drop Upright Sprinkler,Standard the National Fire Protection Association Response Control Mode Specific Ap- (e.g., NFPA 25), in addition to the stan- plication must be maintained and ser- dards of any other authorities having viced in accordance with this section. jurisdiction. Contact the installing con- tractor or sprinkler manufacturer with Before closing a fire protection system any questions. main control valve for maintenance work on the fire protection system that Automatic sprinkler systems are recom- it controls, permission to shut down the mended to be inspected, tested, and affected fire protection systems must maintained by a qualified Inspection be obtained from the proper authorities Service in accordance with local re- and all personnel who may be affected quirements and/or national codes. by this action must be notified. Sprinklers that are found to be leaking Ordering or exhibiting visible signs of corrosion must be replaced. Procedure Automatic sprinklers must never be Contact your local distributor for avail- painted, plated, coated, or otherwise ability.When placing an order, indicate altered after leaving the factory. Modi- the full product name and Part Num- fied sprinklers must be replaced.Sprin- ber(P/N). klers that have been exposed to corro- sive products of combustion, but have Sprinkler Assemblies with NPT not operated, should be replaced if Thread Connections they cannot be completely cleaned by Specify: Model LD(TY5153), K= 11.2, wiping the sprinkler with a cloth or by Upright Large Drop Sprinkler, (specify) brushing it with a soft bristle brush. temperature rating, (specify)finish, P/N Care must be exercised to avoid dam- (specify) age to the sprinklers—before, during, 155°F(68°Cl P/N 50-400-2-155 and after installation. Sprinklers dam- 200°F(93°C) P/N 50-400-2-200 aged by dropping, striking, wrench 286°F(141°C) P/N 50-400-2-286 twist/slippage,or the like, must be re- Sprinkler Wrench placed.Also, replace any sprinkler that Specify: W-Type 3 Sprinkler Wrench, has a cracked bulb or that has lost liq- P/N 56-895-1-001 • uid from its bulb. (Refer to Installation Section.) GLOBAL HEADQUARTERS 1 1400 Pennbrook Parkway,Lansdale,PA 19446 I Telephone+1-215-362-0700 Copyright©2013 Tyco Fire Products,LP. All rights reserved. tyco TEFLON is trademark of The DuPont Corporation. Fire Protection Products