Specifications (6) 7t;50> 1,"3- --32r COMcheck Software Version 3.9.2
a Envelo p Compliance liance Certificate
2010 Oregon Energy Efficiency Specialty Code
Section 1: Project Information
Project Type: New Construction
Envelope Compliance Method:Simplified Trade-Off
Project Title : Bonita Pump Station
Construction Site: Owner/Agent: Designer/Contractor:
14322 SW Milton Court Joel Komarek Jeff Erwin
Tigard,OR 97224 Lake Oswego-Tigard Water MWA Architects
Partnership 70 NW Couch St,Suite 401
PO Box 369 Portland,OR 97209
Lake Oswego,OR 97034 503-973-5151
503-697-6588 jerwin @mwaarchitects.com
Section 2: General Information
Building Location(for weather data): Tigard,Oregon
Climate Zone: 4c
Building Space Conditioning Type(s): Nonresidential
Vertical Glazing/Wall Area Pct.: 12%
Skylight Glazing/Roof Area Pct.: 5%
Bulldina Type Floor Area
Manufacturing Facility 3066
Section 3: Requirements Checklist
Envelope PASSES Design 6%better than code.
Climate-Speclflc Requirements:
Component Name/Description Gross Cavity Cont. Proposed Budget
Area or R-Value R-Value U-Factor U-Factorta)
Perimeter
Roof 1: Insulation Entirely Above Deck 2588 -- 20.0 0.048 0.048
Skylight 1:Other:Plastic,Tinted,SHGC 0.35 182 — — 0.230 0.600
Roof 2:Insulation Entirely Above Deck 868 -- 20.0 0.048 0.048
Exterior Wall 1:Concrete Block:8",Solid Grouted,Normal Density, 4092 -- 11.4 0.075 0.150
Furring:None
Window 1:Other Window,Tinted,SHGC 0.35 481 -- — 0.230 0.350
Door 1: Insulated Metal,Swinging 189 -- — 0.600 0.700
Floor 1:Slab-On-Grade:Unheated 245 -- — -- —
(a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements.
In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks
identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in
the plans/specs the requirement can be verified as being satisfied.
Fenestration Product Rating:
1. U-factors of fenestration products(windows,doors and skylights)are determined in accordance with NFRC 100 by an accredited,
independent laboratory,and labeled and certified by the manufacturer or are determined using the commercial size category values
listed in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.4 and shall include the effects of the window frame.
The temporary label afixed to the fenestration products must not be removed prior to inspection.
Project Title: Bonita Pump Station Report date: 01/22/14
Data filename:P:\201142.00 Lake Oswego Bonita Pump Station\C-design\C-04 codes®ulations\Energy Code\Com Check-
J
See Specifications
Plans reference page/section:
v 2. Solar heat gain coefficient(SHGC)of glazed fenestration products(windows,glazed doors and skylights)shall be determined in
accordance with NFRC 200 by an accredited,independent laboratory,and labeled and certified by the manufacturer or be determined
using the Solar Heat Gain Coefficients(SHGC)in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.10.The
overall values must consider type of frame material and operator for the SHGC at normal incidence.
Plans reference page/section: See Specifications
Air Leakage, Insulation, and Component Certification:
i✓ 3. Sealing of the building envelope.Openings and penetrations in the building envelope are sealed with caulking materials or closed with
gasketing systems compatible with the construction materials and location.Joints and seams are sealed in the same manner or taped
or covered with a moisture vapor-permeable wrapping material.Sealing materials spanning joints between construction materials allow
for expansion and contraction of the construction materials.
Plans reference page/section: See Specifications
✓ 4. Window and door assemblies.The air leakage of window and sliding or swinging door assemblies that are part of the building envelope
are determined in accordance with AAMANVDMA/CSA 101/I.S.2/A440,or NFRC 400 by an accredited,independent laboratory,and
labeled and certified by the manufacturer.
Plans reference page/section: See Specifications
✓ 5. Curtain wall,storefront glazing and commercial entrance doors.Curtain wall,storefront glazing and commercial-glazed swinging
entrance doors and revolving doors are tested for air leakage in accordance with ASTM E 283.For curtain walls and storefront glazing,
the maximum air leakage rate is 0.3 cubic foot per minute per square foot of fenestration area.For commercial glazed swinging
entrance doors and revolving doors,the maximum air leakage rate is 1.00 cfm/ft2 of door area.
Plans reference page/section: See Specifications
v 6. Building thermal envelope insulation.An R-value identification mark is applied(by manufacturer)to each piece of insulation 12
inches or greater in width.Alternately,the insulation installers have provided a signed,dated and posted certification listing the type,
manufacturer and R-value of insulation installed.Refer to code section for blown or sprayed insulation installation/settling depths and
marker requirements.
7. Insulation mark installation.Insulating materials are installed such that the manufacturer's R-value mark is readily observable upon
inspection.
✓ 8. Insulation product rating.The thermal resistance(R-value)of insulation has been determined in accordance with the U.S.FTC R-value
rule.
✓ 9. Installation.All material,systems and equipment are installed in accordance with the manufacturer's installation instructions and the
International Building Code.
t✓ 10.Outdoor air intakes and exhaust openings.Stair and elevator shaft vents and other outdoor air intakes and exhaust openings integral
to the building envelope shall be equipped with not less than a Class I motorized,leakage-rated damper with a maximum leakage rate
of 4 cfm per square foot at 1.0 inch water gauge when tested in accordance with AMCA 500D.Stair and shaft vent dampers shall be
capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection
systems.
Requirement is not applicable.
Plans reference page/section: See Specifications
11.Loading dock weatherseals.Cargo doors and loading dock doors are equipped with weather seals to restrict infiltration when vehicles
are parked in the doorway.
Requirement is not applicable.
Plans reference page/section: N/A
✓ 12.Recessed lighting.Recessed luminaires installed in the building thermal envelope are sealed to limit air leakage between conditioned
and unconditioned spaces.All recessed luminaires are IC-rated and labeled as meeting ASTM E 283.All recessed luminaires are
sealed with a gasket or caulk between the housing and interior wall or ceiling covering.
Plans reference page/section: See Specifications
✓ 13.Vestibules.Doors that separate conditioned space from the exterior are protected with an enclosed vestibule,with all doors of the
vestibule equipped with self-closing devices.Vestibules are designed so interior and exterior doors to not operate simultaneously.
Requirement is not applicable.
Plans reference page/section: N/A
14'Other components have supporting documentation for proposed U-Factors.
Requirement is not applicable.
Plans reference page/section: N/A
Project Title: Bonita Pump Station Report date: 01/22/14
Data filename:P:1201142.00 Lake Oswego Bonita Pump Station\C-design\C-04 codes®ulations\Energy Code\Com Check-
Section 4: Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and
other calculations submitted with this permit application.The proposed envelope system has been designed to meet the 2010 Oregon Energy
Efficiency Specialty Code requirements in COMcheck Version 3.9.2 and to comply with the mandatory requirements in the Requirements
Checklist.
Jeff Erwin, Architect, MWA Architects 1-22-14
Name-Title Signature Date
Project Title: Bonita Pump Station Report date: 01/22/14