Permit 11111 CITY OF TIGARD FIRE PROTECTION SYSTEM PERMIT
- COMMUNITY DEVELOPMENT Permit#: FPS2015-00079
T IGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 06/08/2015
Parcel: 2S112CB00900
Jurisdiction: Tigard
Site address: 15000 SW HALL BLVD
Project: Bonaventure of Tigard Subdivision: WILSON ACRES Lot: 8
Project Description: Fire sprinkler system for new 3-story senior living facility.
Contractor: BLACKSTONE FIRE PROTECTION LLC Owner: SCHMIDT FARM LLC
612 NE SQUIRE RD 25717 SW LABROUSSE RD
WASHOUGAL,WA 98671 SHERWOOD,OR 97140
PHONE: 503-708-7437 PHONE:
FAX: 360-838-0162
FEES
Description Date Amount
Specifics: Permit Fee-COM 06/08/2015 $1,438.02
12%State Surcharge-Building 06/08/2015 $172.56
Type of Use: COM Plan Review-Fire Life Safety-COM 06/08/2015 $575.21
Class of Work: NEW Type of Const: VA Info Process/Archiving-Lg$2.00(over 06/08/2015 $38.00
Occupancy Grp: I-1 Height: ft 11x17)
Stories: 3 Info Process/Archiving-Sm$0.50(up to 06/08/2015 $75.00
11x17)
Commercial Sprinkler System:
Sprinkler Required: Yes Sprinkler Type: Wet
Standpipe Required: No Hazard: LT
Density: .10 Design Area: 1500
K Factor: 5.6
Commercial Fire Alarm System:
Fire Alarm Required: Alarm Type:
Pull Station Required: Smoke Detectors Req:
Battery Calcs Provided: Cut Sheets Required:
Total $2,298.79
Valuations: Required Items and Reports(Conditions)
Sprinkler Valuation: $240,000.00
Residential Square Footage: 0
Fire Alarm Valuation: $0.00
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other
applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of
issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the les adopted by the Oregon
Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. •- obtain a copy of the rules
or direct questions to OUNC by calling 503.232.1987 or •• .2344.
Issued By: Permittee Signature:
Call 0 .•39.4175 by 7:00 a.m.for the next available insp•cf.n date.
This permit card shall be kept in a conspicuous place on the job site un • completion of the project.
Approved plans are required on the job site at the time of each inspection.
- " BIildina Permit Application
Fire Protection System 101z of i i( I t ‘;i (,.1 )
City of Tigard RECEIVED Received ..---110
Date/By: J�a0
Permit No.: //T�nn� /5—i
77
13125 SW Hall Blvd.,Tigard,OR 97223 Plan Revie•
Phone: 503.718.2439 Fax: 503.598.1M 5 2015 �� Other Permit: 40,08€411-try r
DateB ,
I 1 G n K I) Inspection Line: 503.639.4175 Date Ready : /// 41I.F. Juris ® See Page 2 for
Internet: www.tigard-or.gov Notified/Met=odd /� �j f/ Supplemental Information
ppyyC''''ILTY OF TIGARD V/,✓[` /A-y"/
TYPEZ)UWORKG DWISiON y
QUIRED DATA:1-AND 2-FAMILY DWELLING
Aew construction ❑Demolition Permit fees*are based on the value of the work performed.
�� Indicate the value(rounded to the nearest dollar)of all
❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
El 1-and 2-family dwelling ❑_C"""ommercial/industrial Valuation: $
❑Accessory building —Multi-family Number of bedrooms:
❑Master builder /❑Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: ' SD o b ..)) j 1 pt v "'-&\/)' . New dwelling area: square feet
City/State/ZIP: 1-1C.04" ') J 0 Garage/carport area: square feet
Suite/bldg./apt.no.: Project name: ...b ic4,_lG J 2_,e Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE-CHECKLIST
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
Ov-
DESCRIPTION OF WORK work indicated on this application.
yr Valuation: $ 2(10 OL7n
kjek1 �t 5 tom- .iZ I 6¢- S�y�ZZ K�
z'.\; �‘,1'..<i2._6 U)U>1 / Existing building area: ij square feet
INew building area: prr.ji. 06,0 square feet
FA ROPERTY OWNER
❑ TENANT Number of stories:
3
C:;Name: 14. Type of construction:
Address: Occupancy groups:
'lk . City/State/ZIP: Existing:
At, i Phone:( ) Fax:( ) New:
4
Al..APPLICANT CONTACT PERSON NOTICE
Business name: LA Le bTiu .t "e)P___t,r • L1 �(- All contractors and subcontractors are required to be
Contact name: L� [ licensed with the Oregon Construction Contractors Board
/ -�� under ORS 701 and may be required to be licensed in the
Address: 10 i 2 10e— !�1;.;)/-/1e.'" •✓ jurisdiction in which work is being performed.If the
City/State/ZIP: '� P1�Jy_A '�0- ez q `
applicant is exempt from licensing,the following reasons
Z apply:
Phone:( ) I Fax::( )
E-mail: .ak, p, L,144C es%c]Je r-)2 ,Lib'-L
.,' CONTRACTOR BUILDING PERMIT FEES*
• Business name: L 1',(S%z) it A.:: i Zl' .1zv L.-Li.".. (Pksttx�►�hsidrgbrlctf
:, ` Permit fee:
' • Address: L J 1 not,.. - /�`
-,) f g-3 DJ L, State surcharge(12%of permit fee):
City/State/ZIP:
FLS plan review(40%of permit fee):
Phone:(` ) �(Ib_ (./-7 Fax:¶ c?5,3 15_0) I
9'Z_ (Due upon application submittal.)
CCB lic.: 1 q ells /,✓ j 151 J/ (f l _ Total permit fees:.
Authorized signature: `v+ l Amount receiv
This permit application expires if a permit is 6ot obtained
Print name: /� ,1 L r Date: 4._ Z s--... l b'- within 180 days after it has been accepted as complete.
�s ��' * Fee methodology set by Tri-County Building Industry
Service Board.
I:' lding\Permits\FPS-PermitApp_071514.doc 440-4613T(I1/02/COM/WEB)
1
i
,it r
City of Tigard: Fire Protection Permit Checklist
Page 2- Supplemental Information
Describe work to be done:
1.) Type of Work: 2.) Addition/alteration only to sprinkler heads: 3.) Addition/alteration only to alarm devices:
7❑
ew system Number of sprinkler heads: Z,qZ LJ Number of alarm devices:
Addition or ❑ 1 10 heads: Affidavit required and ❑ 1-5 devices: Affidavit required and
Alteration (3)copies of sketch showing area (3) copies of sketch showing area
to existing of work within building structure of work within building structure
system
❑ 11+ heads: Plan review required and ❑ 6+ devices: Plan review required and
(3) sets of plans. (3) sets of plans.
Additional description of work:
Type of System (Complete A, B, C or D as applicable):
A.) Commercial Sprinkler
siiAiet ❑ Dry
Additional Standpipes 5
Information: Hazard Group 4-1 Cc i-c-
Density c/
Design Area / 13-Do
K. Factor
Sprinkler Project Valuation: $ Zeta tGt)
I
B.) Type I- Hood Fire Suppression System
Hood Project Valuation: $
C.) Fire Alarms
Submittal shall Battery Calculations ❑ Yes
include: Individual Component ❑ Yes
Cut Sheets
Fire Alarm Project Valuation: $
D Residential Sprinkler(Stand Alone System). ._
Square Footage: Permit Fee:
0 to 2,000 $198.75
2,001 to 3,600 $246.45
3,601 to 7,200 $310.05
7,201 and greater $404.39 ,
Sprinkler Project Square Footage: sq. ft.
Fire Protection Permit Fees
Project valuation subtotal(see A,B&C above): $
Permit fee based on project valuation(see fee schedule): $
Permit fee based on square footage (see D above): $
State Surcharge (12%of permit fee): $
FLS Plan Review(40%of permit fee): $ _
TOTAL: $
http://www.tigard-or.gov/document_center/Building/FPS_PemutApp.doc 2
L______ ,
May 20, 2015
RE: FIRE SPRINKLER SYSTEM
Project Information
Building Permit: FPS2015-00079 Construction Type: VA
Tenant Name: Bonaventure Occupancy Type: I-1
Address: 15000 SW Hall Blvd. Occupant Load: 1991
Area: 157,067 Sq. Ft. Stories: 3
The plan review was performed under the State of Oregon Structural Specialty Code
(OSSC) 2014 edition; National Fire Protection Association, Standard 13 (NFPA 13)
2010 edition and the State of Oregon Fire Code (OFC) 2014 edition.
GENERAL
1 . A key box shall be installed in a location approved by the Fire Chief. The key box
shall be of an approved type and shall contain keys to gain necessary access as
required by the fire code official. Section 506.1 OFC. Please contact Tualatin
Valley Fire & Rescue for key box information at 503-612-7010
2. A supply of spare sprinklers (never less than 6) shall be maintained on the
premises so that any sprinklers that have operated or been damaged in any way
can be promptly replaced. These sprinklers shall correspond to the types and
temperature ratings of the sprinklers on the property. Sections 6.2.9.1 & 6.2.9.2
NFPA 13.
3. The spare sprinklers shall be kept in a cabinet located where temperatures will
not exceed 100 degrees "F" at any time. A special sprinkler wrench shall be
provided and kept in the sprinkler cabinet to be used in the removal and
installation of sprinklers. Sections 6.2.9.3 & 6.2.9.6 NFPA 13.
4. The installing contractor shall identify a hydraulically designed sprinkler system
with a permanently marked weatherproof metal or rigid plastic sign. Such signs
shall be placed at the alarm valve, dry pipe valve, pre action valve, or deluge
valve supplying the corresponding hydraulically designed area.
5. The clearance between the deflector and the top of storage shall be 18 inches or
greater. Section 8.6.6.1 NFPA 13. The distance shall be increased to 36 inches
for Large Drop sprinkler heads. Section 8.11 .6 NFPA 13
6. Sprinklers shall be located a minimum of 4 inches from walls and spaced not less
than 6 feet on center. Sections 8.6.3.3 & 8.6.3.4.1 NFPA 13.
7. Clearances shall be provided around all piping extending through platforms,
foundations, walls and floors. The diameter of the hole shall be 2 inches larger
than the penetrating pipe for pipe sizes 1 inch through 3 '/2 inches. The diameter
of the hole shall be 4 inches larger than the penetrating pipe for pipe sizes 4
inches and larger 2 inches is required. Sections 9.3.4.1 & 9.3.4.2 NFPA 13.
8. All valves controlling the water supply for automatic sprinkler systems and all
water flow monitoring devices shall be electrically monitored when the system
serves more than 20 heads. Section 903.4 OFC
9. An approved audible sprinkler flow alarm shall be provided on the exterior of the
building in an approved location. Such sprinkler water-flow devices shall be
activated by water flow equivalent to the flow of a single sprinkler of the smallest
orifice size installed in the system. Section 903.4.2 OFC
10.The system piping shall be braced to resist both lateral and longitudinal
horizontal seismic loads to prevent vertical motion resulting from seismic loads.
The structural components to which bracing is attached shall be determined to be
capable of carrying the added applied seismic loads. Sway braces shall be
designed to withstand forces in tension and compression. Bracing shall be
attached directly to feed and cross mains.
11 .The end sprinkler on a line shall be restrained against excessive vertical and
lateral movement.
12.New sprinkler system piping shall be hydrostatically tested at 200 psi and shall
maintain that pressure without loss for two hours. Where addition or modification
is made to an existing system affecting less than 20 sprinklers this test need not
be done. NFPA13 16.2.1 .1
13.AII concealed spaces enclosed wholly or partly by exposed combustible
construction shall be protected by sprinklers.
14. Dry systems shall be flowed through the remote inspectors test with the smallest
sprinkler orifice used in the system. The time required for water flow to the
inspectors test, the clapper trip time and the time it takes for the compressor to
turn on shall be noted on the NFPA13 Completion Form.
15.Single interlock pre action systems shall be tested for operation of the detection
device and dry pipe valve. Provisions shall be made for the manual operation of
the detection system at locations requiring not more than 200ft. of travel.
16.The installing contractor shall complete and sign the appropriate
contractor's material and test certificate found in NFPA13.
Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp,
shall be maintained on the jobsite. The plans shall be available to the Building Division
inspectors throughout all phases of construction. 106.4.2 OSSC
When submitting revised drawings or additional information, please attach a copy of the
enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City
of Tigard in tracking and processing the documents.
Respectfully,
Dan Nelson,
Senior Plans Examiner
(503) 718-2436
dann @tigard-or.gov