Report a,
Certification Report NATIONAL
BALANCING
COUNCIL'"
DATE:
AMERICAN 5/27/15
l' -'
�� HEATING, INC
'' PROJECT:
'•
BUILT ON TRUST Women's Healthcare
Assoc.
PROJECT 2nd Floor
Women's Healthcare Assoc. 2nd Floor
7650 SW Beveland St.
Tigard, Or. 97223 SYSTEM:
1//b7-(//01 - Ord l l
READINGS BY:
The data presented in this report is an exact record of system R. Mayo
performance and was obtained in accordance with the NBC
Standard procedures. Any variances from design quantities which JOB NUMBER:
exceed NBC tolerances are noted throughout this report. 115113
The air distribution systems have been tested and balance and V
final adjustments have been made in accordance with NBC z
"Procedureal Standards for Testing, Adjusting, Balancing of — o
Environmental Systems" and the project specifications. (' m
Z N
NBC TAB FIRM: American Heating, Inc. D N o
TAB SUPERVISOR: Bill Wingate Q
wrn
REG NUMBER: 0185 LL Q o L
CERTIFICATION EXPIRES: October 30, 2015 = n o
Z ay
w
CERTIFIED V ooM
Bill Wingate
American Heating,Inc. 2 O
00185 .Expires 10130/2015
NATIONAL BALANCING COUNCIL
.01t 14414
PAGE 1
._ N ,
4
IMINESSMINNUF- 1- 1-p-i4k
NATIONAL
BALANCING
CFM Cubic Feet per Minute ——— Return Duct C O U N CI L'
DATE:
0 5/27/15
Diameter Supply Duct
PROJECT:
Supply OSA Outside Air Women's Healthcare
Assoc.
2nd Floor
Return e Equipment Designation
SYSTEM:
V A Exhaust SP Static Pressure
READINGS BY:
Direction of Airflow SWS Sidewall Supply R.Mayo
JOB NUMBER:
T Thermostat/control SWR Sidewall Return 115113
D Damper CS Ceiling Supply z
w c
TVolume Damper HP Horsepower Z
rn
N M
N 'c".3'OBD Opposed Blade Damper V Volts
< z z
I ¢W LI
BD Backdraft Damper FLA Full Load Amps Q N o Sc
V Ili zr;
g N
Unit Location SF Service Factor I ° s
Fl,
E a
w
a 0
F Furnace BHP Brake Horsepower a
CU Condensing Unit DNA Data Not Available
CC Cooling Coil DNL Data Not Listed
AH Air Handler NA Not Accessible
L Louver NT Not Taken-no valid PAGE 2
CF Correction Factor ADD Address
AMERICAN
...441 HEATING, INC.
B U I L T O N T R U S T
A
TEST INSTRUMENTS
Instrument Manufacturer Model Calibrated Description
Balancing Flow Hood (FH) Shortridge 850L 09/16/13
Anemometer (AN) Pacer DA-410 10/16/13 Velocity/Pressure/Temperature/Humidity i.
Velgrid (VG) Shortridge 860C 09/13/13 All hoods, Accessories and Velgrid
Infrared Thermometer 02/26/10 Infrared Thermometer with laser
Volt Meter Fluke Model 322 10/15/13 AmpNolt/Tem peratu re/Ohms
Photo Tach Extech 461995 02/26/10
Thermometer UEI DT3B 10/15/13
Hydronic Meter HDM Model 250 08/25/13 Hydronic Differential Gauge
Sling Psychrometer RIT 69008 12/10/09
Capture Hood Shortridge CFM-88 05/26/11
Manometer Shortridge CFM-88 05/26/11
Anemometer(AN) Pacer DA-40V 10/14/11 Velocity/Pressure/Temperature/Humidity
Hygrometer Yellow Jacket 69008 10/27/11
Tachometer Extech 461995 09/30/11
`Thermometer Raytek MT4 09/30/11
Electrical Meter Remote Clamp Fluke 5500A 09/30/11 AmpNolt/Temperature/Ohms
PAGE 3
t
VAV Terminal Box Report
NATIONAL
BALANCING
COUNCIL"
PROJECT: Womens's Healthcare Assoc. CONTROL TYPE: DATE:
ADDRESS: 7650 SW Beveland St. 5/27115
_
Tigard,Or. 97223
PROJECT:
Box Instrument OUTLETS DESIGN TESTS FINAL Max Women's Healthcare
Assoc.
Number Used Area Served *CF ADD. NO. SIZE TYPE CFM 1 2 CFM Design 2nd Floor
FPB 2-14 FH .99 105 i 1 8 4 Way 225 286 230 102% SYSTEM:
FH 2 8 Slot 225 197 223 99% Summit
450 483 453 101%
FPB 2-3 FH .83 87 3 8 Slots 240 214 248 103% READINGS BY:
FH 4 8 Slots 240 204 239 100% R. Mayo
FH I 5 8 Slots 240 190 219 91% y
FH 6 8 Slots 240 197 239 100% JOB NUMBER:
960 805 945 98% 115113
FPB 2-4 FH 0.82 90 7 10 Slots 300 223 292 97%
FH 8 10 Slots 300 299 307 102% Z o
FH 9 8 Slots 200 242 194 97% N
en
FH 10 8 Slots 200 164 188 94% cn
1000 928 981 98% 0 N
z 11.1 0 0
CsJ FPB 2-5 FH .90 91 11 8 Slots 250 199 249 100% 2
ill co
FH 12 8 Slots 190 248 194 102% <
FH 13 8 Slots 250 189 246 98% U.1 L 0 LL
690 636 689 100% I N z co°D
w ;or FPB 2-15 FH .75 117 14 10 4 Way 310 258 310 100% Q N
FH 15 10 4 Way 310 218 306 993/4 '�
0 0 ^
620 476 616 99% 0 "' ° 0
Ce
L1.1 w
z
E 0
a ,
Remarks:CF=Correction Factor,ADD=Address
PAGE:4
V2009 National Balancing Council
•
i
t
•
VAV Terminal Box Reportl -
NATIONAL
BALANCING
COUNCIL'"
PROJECT: Womens's Healthcare Assoc. CONTROL TYPE:
— DATE:
ADDRESS: 7650 SW Beveland St. _ 5/27/15
Tigard, Or, 97223
PROJECT:
Box Instrument OUTLETS DESIGN TESTS FINAL Max Women's Healthcare
Assoc.
Number Used Area Served *CF ADD. NO. SIZE TYPE CFM 1 2 CFM % 2nd Floor
Design
FPB 2-6 FH .93 93 16 8 4 Way 220 147 216 98% SYSTEM:
FH 17 10 4 Way 240 257 247 103% Summit
460 404 463 101% 1
FPB 2-7 FH .78 94 18 8 Slots 240 202 226 94% READINGS BY:
FH 19 8 Slots 240 217 231 96% R.Mayo
FH 20 8 Slots 240 211 231 96%
FH 21 8 Slots 240 216 243 101% JOB NUMBER:
FH 22 8 Slots 240 234 241 100% 115113
1200 1080 1172 98%
VAV 2-4 FH 0.82 98 23 8 4 Way 195 139 192 98% V o co
FH 24 8 4 Way 195 110 192 98% z r-
FH 25 8 4 Way 185 128 179 97% M
FH 26 8 4 Way 140 151 140 100% {' -
N f ,
FH 27 10 4 Way 100 150 91 91% Z D o in
815 678 794 97% w
Q L.
0 U
<
VAV2-9 FH .96 118 28 6 4 Way 40 105 37 93% W -.F..
FH 29 6 4 Way 40 96 39 98% I N °z 8
FH 30 8 4 Way 175 246 187 107% w g
FH 31 10 4 Way 175 182 176 101% Z I- co l
-H 32 8 4 Way 175 171 ' 170 97% Q M o `„
FH 33 8 4 Way 175 199 ' 188 107% V d o t
780 999 797 102% C
Lo
W w
z
g 0
a
I
a
Remarks:CF=Correction Factor,ADD=Address
J 20U9 National Balancing Council
PAGE: 5 •
r
L
VAV Terminal Box Report
1-11-111'1.7-4-k
NATIONAL
BALANCING
COUNCIL—
PROJECT: Womens's Healthcare Assoc. CONTROL TYPE: DATE: e
ADDRESS: 7650 SW Beveland St. 5/27/15 j
Tigard, Or. 97223
PROJECT:
Box Instrument OUTLETS DESIGN TESTS FINAL Max Women's Healthcare
Assoc.
Number Used Area Served *CF ADD. NO. SIZE TYPE CFM 1 2 CFM Design 2nd Floor
FPB 2-6 FH .67 97 34 6 4 Way 40 41 43 108% SYSTEM:
FH 6 4 Way Summit
FH 36 6 4 Way 125 33 122 98%
FH 37 6 4 Way 50 30 47 94%
FH 38 6 4 Way 50 78 46 92% READINGS BY:
39 8 4 Way 105 85 110 105% R. Mayo
370 267 368 99% y
JOB NUMBER:
VAV 2-2 FH 0.71 92 39A 8 4 Way 175 75 169 97% 115113
FH 40 6 4 Way 115 69 119 103% '
FH 41 6 4 Way 50 177 54 108%
FH 42 6 4 Way 40 96 40 100% z o
FH 43 6 4 Way 125 119 120 96% _ ^
505 536 502 99% A I r°i
N
VAV 2-10 FH 1.07 119 44 8 4 Way 140 143 138 99% Z j o a
N
FH 45 10 4 Way 140 287 147 105% z
FH 46 10 4 Way 300 221 312 104% < Q LI-
580 651 597 103% LU s O
O
O
CNI
VAV 2-7 FH .90 106 47 10 4 Way 310 298 314 101% w g
FH 48 10 4 Way 310 262 298 96% Q H N
620 560 612 99% U o Od -
cp
VAV 2-11 FH 1.05 122 49 8 4 Way 225 243 236 105% rt w
FH 50 8 4 Way 225 227 216 96% III z
450 470 452 100% E =O '
Q n.
Remarks:CF=Correction Factor,ADD=Address Grill 35 Deleted
l20U9 National Balancing Council PAGE: 5
s