Permit CITY OF TIGARD BUILDING PERMIT
s COMMUNITY DEVELOPMENT Permit#: BUP2015-00149
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 05/28/2015
Parcel: 2S102DA00600
Jurisdiction: Tigard
Site address: 13500 SW HALL BLVD
Project: Tigard Public Library Subdivision: BARNUM PARK Lot: 9
Project Description: Installation of new automated material handling system(book drop).
Contractor: FIVE STAR BUILDERS INC Owner: TIGARD,CITY OF
PO BOX 555 13125 SW HALL BLVD
BANKS,OR 97106 TIGARD, OR 97223
PHONE: 503-324-5220 PHONE: 503-639-4171
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: VB DC Provision Review,COM TI-Ping 05/28/2015 $75.00
Occupancy Grp: A-3 Occupancy Load: DC Provision Review,COM TI-LRP 05/28/2015 $11.00
Permit Fee-Additions,Alterations, 05/28/2015 $509.05
Dwelling Units: 0 Demolition
Stories: 0 Height: 0 ft 12%State Surcharge-Building 05/28/2015 $61.09
Bedrooms: 0 Bathrooms: 0 Plan Review 05/28/2015 $330.88
Value: $30,000 Plan Review-Fire Life Safety 05/28/2015 $203.62
info Process/Archiving-Lg$2.00(over 05/28/2015 $16.00
11x17)
Floor Areas: Info Process/Archiving-Sm$0.50(up to 05/28/2015 $10.00
11x17)
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $1,216.64
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-• • roug :•- 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 5033..22332.1987 or 1.800.332.2344.
Is ued By: //er ��. i / Permittee Signature: �/ "
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
'Building Permit ApplicatioRECEli'EI)
Commercial FOR OFFICE USE ONLY /�� �y�
City of Tigard MAY 2.; �a15
Date/By. n Iiu'�iS c�i ,
OF r� T r 'j y �rC[ S Permit No.:
Eril
• 13125 SW Hall Blvd.,Tigard,OR VF 1 IGARI) Plan Review tit, (/� I/ �� Other Permit:
Phone: 503.718.2439 Fax: 503.5 Date/By. {�1•b X
Inspection Line: 503.639.4175 Date Ready/sy: ]uris: ® See Page 2 for
TIGARD Internet: www.tigard-or.gov BUILDING DIVISIr Notified/Method: ;J���Q.rf supplemental Information
TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $
❑Accessory building ❑Multi-family Number of bedrooms:
❑ Master builder ❑Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address:13500 SW Hall New dwelling area: square feet
City/State/ZIP:97223 Garage/carport area: square feet
Suite/bldg./apt.no.: Project name:Library AMH Covered porch area: square feet
Cross street/directions to job site:Wall St. Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
-
Tax map/parcel no.:2S102DA00600 Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Modify bulding for the install of an automated material handler system. Valuation: $530,000.00
Exterior wall penetration,new sidewalk,exterior awning Existing building area: 48000 square feet
New building area: 48000 square feet
® PROPERTY OWNER ❑ TENANT Number of stories: 2
Name:City of Tigard Type of construction: steel framed
Address: 13125 SW Hall Occupancy groups:
City/State/ZIP:Tigard OR 97223 Existing:
Phone:(503)718-2588 Fax:( ) New:
❑ APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES*
Business name:City of Tigard (please•ejer to fee schedule)
Structural plan review fee(or deposit):
Contact name:Kevin M.Cole
FLS plan review fee(if applicable):
Address: 13125 SW Hall
Total fees due upon application:
City/State/ZIP:Tigard OR 97223
Amount received: --e3----'
Phone:(503)718-2588 Fax::(503)684-4191
E-mail:kevinc @tigard-or.us
PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
CONTRACTOR Commercial and residential prescriptive installation of
roof-top mounted Photo Voltaic Solar Panel System.
Business name: �'�us. �/4� ``-0�Q.-S Submit two(2)sets of roof plan with connecti•• •-tails
Address: and fire dep t access,along with •- 110 Oregon
p o �vc S�S Solar Installation C, • -cklist.
City/State/ZIP: ermit fee(inc • .•• review
�k1•+KS 0 1Z Cr)q 1 D . :•ministrative - • $180.00
Phone:(sal -3•z4 , S22.0 Fax:(jai) 3 2_4 . p Sg 3 S • urcharge(12%of permit fee): 21.60
CCB lic.: °►3 ZQ g `d(8 l i lP Total fee due upon application: $201.60
Authorized signature's .> �■ C This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: k ,QE' / 6 IG44Qt, Date: 57241l4.- * Fee methodology set by Tri-County Building Industry
Service Board.
I:1Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-46131(11/02/COM/WEB)
a •
7111 • Building Division
Accessibility: Barrier Removal Improvement Plan
TIGARD
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per-cent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $ 30,000.00
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 7500.00
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $ 7500.00
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains: and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $ 7500.00
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
City of Tigard
71 / COMMUNITY DEVELOPMENT DEPARTMENT
`;�� Building Permit Review — Commercial - With Land Use
Building Permit #: 6.t)-4909.005- 00 /4/
Site Address: /3 cai „Stu ki, 1/ ,6/vei , Suite/Bldg#:
Project Name: / . , - �u�jl L[h
(N. 0 f commercial business occupying the space. If ant,enter Spec Space.)
Planning Review
Proposal: 4P) cQditA /7/ 4--‘7. ,) ( C &r ,_. - 'le_44.■,_
I(Q i Verify site address/suite#exists and active in permit syst .
M -ver Terrace Plan District: ❑ Yes ICJ No
And Use Case#:
44 hi.b01-o/3 Q(')Q()
pr PPlan atch Approved Land Use:
Site Plan Landscape Plan ❑ Other:
fglrban Forestry Plan //ievation Plan
Vuilding Height: Maximum Height Ac71 Height
nditions Met: ❑ Prior to Submittal Prior to Permit Issuance
Business Lice e:
xists: Yes ❑ No,applicant notified to obtain business license
Public Facilities Improvement(PFI) Permit:
Required: ❑ Yes,applicant was notified No Applied For: ❑ Yes ❑ No,stop intake
Notes:
Approved by Planning: 411. � Date: /
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal _
Original Submittal Date: 5-616//
Site Plans: #
Building Plans: #
Building Permit#: 1=1""IGnter building permit#above.
Workflow Routing: J2--Planning Engineering -hermit Coordinator 'Building
Workflow Sign-off: Sign-off for Planning(include notes from planning review)
Route Application Documents: ding: original permit application,site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: ._ _. _ ' '_z– _A_ Date: /5—
I:\Building\Forms\BldgPermitRvw_COM_W ithLandUse_040115.docx
Engineering Review
❑CSlope at building pad:
❑ PFT Permit#:
❑ Conditions "Met"prior to issuance of building perm*/
❑ Easements (encroach cents)per engineering cpndittions of approval and plat (not typical on SDR/CUP)
❑ Water Quality/Quantity Facility. %
Assess Water Quality Fee in-lieu ❑ Yes ❑ No
Assess Water Quantity-Vee in-lieu: ❑ Yes ❑ No
LIDA Facility,of t: ❑ Yes ❑ No
❑ T Approved by Engineering: Date
Notes:
Approved by Engineering: j7 Date:
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
�OK to Issue Permit
/Approved by Permit Coordinator: I Date: '5 7 j
I:\Building\Forms\BldgPermitRvw COM_WithLandUse 040115.docx