Loading...
Report (19) R)P 0//-oco17 /. 0d,3 s w 70-11 AV C, lik 6775 SW 111th,Suite 200 Nord ling Structural Beaverton OR,97008 Engineers, LLC Fax (503)924-5903 August 23,2011 RECEIVED 1 0150 AUG 31 2011 Anderson Dabrowski Architects CITY OF TIGARD 1430 SE 3rd Ave, Suite 200 BUILDING DIVISION Portland,OR 97214 Attn: Margaret Wilson RE Concrete Mix Design Submittal Red Rock Center SW 72°d Avenue/Dartmouth Street Tigard,OR 97223 Enclosed you will find a copy of the concrete mix design,as provided to Nordling Structural Engineers,LLC (NSE). We have reviewed the mix design and find that it conforms with the intent of the design documents as to the specified concrete strength, slump,and air entrainment requirements. NSE cannot respond to the remainder of the concrete mix design(i.e. amounts of cement,water, crushed rock,sand equivalent,etc.). It is the responsibility of the concrete supplier to proportion these items so as to meet the requirements of the design documents. Margaret,if you should have any questions,please do not hesitate to contact our office. rarIVAusRS SUBMITTAL REVIEW Jonathan H Walters • EXCEPTIONS AS NOTED • AE.iECtED,AESUBMt T ®NO EXCEPTIONS TAKEN ❑ SEE ATTACHED COMMENTS Corrections to comments made to the shop drawings during this review do not relieve contractor from compliance with requirements of the drawings and specifications This check is only tor review ol general conformance with the design concept of the project and general oompiiance with the information given in the contract documents. The contractor is responsible for confirming and correlation all quantities and dimensions: sewing fabrication processes and techniques of construction:coordinating his work with that of ail other trades; and performing rrs work ,n a sate and satis'actory manner. NCRDLI"^STRUCTURAL ENGINEERS,LLC BY JHW DATE 8/23/11 Cover yol, 1 !;--1 2 -' 2). 13R 141V Qi. C.r AtANA GZA C°IVS UCTION 4N1) .0EVI_oPitfENT 100) s,e IVATI;i AVENUE *121 PO t), OR 9 CELL. SO3-740-4940 17)411: bskeicher7214 corneast.net PAX: 503-S9S-014S irti 4 6775 SW 111th,Suite 200 Nordling Structural Beaverton OR,97008 Ph:(503)924-5901 Engineers, LLC Fax:(503)924-5903 August 23,2011 10-150 Anderson Dabrowski Architects 1430 SE 3rd Ave, Suite 200 Portland,OR 97214 Attn: Margaret Wilson RE Site Observation August 23,2011 Red Rock Center 1:00 p.m. SW 72nd Avenue/Dartmouth Street Tigard, OR 97223 Conducted site observation to review foundation/stem wall reinforcement. At this time, all foundation reinforcement and stem wall dowels are in place and the contractor will be ready to pour concrete by 6:00 a.m.tomorrow morning. To the best of our knowledge, all work observed appears to be in conformance with the design documents. See enclosed photographs of the buildings foundation work. Please do not hesitate to contact our office with any questions, es Jonathan H Walters Cover At/r'C'EMEX CONCRETE MIX DESIGN Tod:VsDale: August 23,2O+: um DESIGN CODE: 1308183 of Conet 3:500 psi Sales DesCeCeiDn: 3500psIREG Nn Mott-ten Air 1 pump o pour A tr-uionor Use Nbx 1yc+e:Sts-.1-1RJ-Y Pa:9W Nine Co-rt-ro]atCnpdootar Sut Cortrador; Wits toncrst4 DESIGN CALCULATIONS FOR ONE CUBIC YARD SPQR MATLIUAL SPECIFICATION.TYPE SOIIRCE (SSD) % Y/L'GHTJSSD) VOLUME F r.:1cc X 1: em Perltand AS 1 M C:1 S0 1 5pc I N 3.1.'5 4t1' 2.3150 �- - P.J.der M 2 laiarsle C A ±ASTM C61 a CeMraia 2.01 93 tb.. 0.571 1: - . 1.,; .- >v 1:Canby 1--318' ASTI►1 C33 ro.5i 266 2109E 1240 IRS 7.620 Cu.*. rt-'Aivrrr•E�-n 27 Can 31V-#$ASTM C33 no 8 1'3103-1 2.63 360% 61 ►Rs- 4.144 va.R. Co.—se Acrregaez to 3: lisle e.pgregnte#1: Can PCC Sand ASTM C33 034004 255 4 50% 1284 Ms 5072 cult Fhe}rontgatn#2: MIXING WATER POte81e•ASrM C94 28.8 v13. 240 bs. 2..816 CL.R AIR Ct'3NTFNTt ENTRAINr (E ranpped tt tirs trri 2 9%) 1.2% 0 374 cull AC XTt!RES:(Soo r.:h'r 1 Aow) C 4 gels. 459 Ms. DIVA cu.R- TC?TAI S• 4027 lbs. 27.00 Cu R. ADMIXTURES SPECIFICATION-TYPE _ DOSAGE Atlmneunt N 1: Admixture p 2 WADA 04 ASTM 0494 Type A 8 D :;ncts 1.71 3:46 na.'aat 1>dr`lti7ttuiu#3. Deraceto 55 ASTM 0494 Type A 8 F G e 1.:3 3 to 9 odcwt Admixture#4. Acteneduen i.''5 TARGET wATERICEMENTMOUS RAMC:0.437 TARGET SLUMP b (+.t° tARCIET UNIT WEIGHT:149.15 mss. TARGET'AIR 1.2% 41-.6% REMARKS: ('a.arJrr►�*x.+rnsw!fa a-eantran aaM.4f 1211.1 rrrotr7d rrc-»rrc tkh inf rain v n Ctm'F1 hr'M 7141.an rnmwrr perrnrwel srararnl of rMi war'uc'6n carrier to wcdw, n( CEbtEt an Mr dot.i.Wevoqist/i,aY ra,crcH 0555 rrrdR. (f.NE4'kai rv.au.rfrrny"V"'"**7.rRr.-r..vocli*,cyfrAran••if ate mix I krrr,.rre.a kr rhr M,'"..,,Art.rr.rf r kr fn?An a arrAwr{rwru.rrr,anlbr car-ra cm,to ii,,n dna Mr ahurr ire parcwrrerr ant rrprw,rcrav for Mr as—..waled ry and eaqrnarneatal rend!-!+n,fcr a r ursrrtrd pr'ars•rvr of.A.r nix The r.r wi i a*rrr rhr ucud rt.00 rh,.•krw Arse speciwces are a4.frl nteafrE rrrar7u••r d.ewe,rianiel4 fins%),and Mrrd 6,••rust co...HA...cc with c.••rr rl(STM Sts.fa•.h,an.r ervancrra far accop.unce per AC/>xrnh►lc and prorritvs D+riariaweJiva AST/d nrnlard.wctwo,aaGa sximrsr r grunkr i-,.ol an r*S w4r MTn. arr."'dw ra ere net CAME 'yarrows Or Mika ra c.idledstsardpa.:r*Willy b!an rcrrndMvJWrpredrwv ta6vrsrr ay. 1Areyra ale r v.arwt Mi i cearrnt s r-s44 a.auaewaa cur(EMFX rsarrws the rrrin ,Awcxwrr crrrnri.,m coa}rri Gnomical adwrvl5reer are aided in arcardanrr.r=•6 Mr .aewfrrnenes rr cawsndaawrr,and may be itOwnrd u.rriafa■r air ranprrtvs Algerern,wig'ha may be akarint ea waiau in Aril and c4.-.n,rra!,ti.n; PREPARED BY: John Paler Sale9 RewesenlaTive 4GTFS-. CEMEX 5.735 NEC 17ttx AVE. Vance:weer WA 98662 360 2544770 fax 354-P54-A404 o F < ji 1 s .! r S } V.M r .a ] # 8 T T .. £Ρ* ., , .1"A ,f r 4 ` *I. 11 CO a,•,! ^ sx 4x ' t •'t.. w, ' + lit)4, ' . ` ''Ai%t i w M • y. i .1� .'e • •:�. 1't 0.1{: 1...j ' ..� +.r1_. y ,.i'1,,, ''''%.4k LI•a ,, �ti 4 CND 4 . - 4 ~� v ..,....,... . +`3'.`' a .• 1v ... ,,„„.4 4 441 , ; R t .. z to 1 [41 y .w 'f� lw [.... CI i - .......4 r I.,:-- - . _ ,..„Aw ."./6:1A- A4111 - bow • s',s ._.'` , , .. a.. - 1 t o-;r `,��. ,� ' �,+' 'ti :..`li, y i4111 i R_ 4 i _ k .0 . usk_:::rimi 1:-4"--1- .:itti, -.. ,i.§.--4...; ._i. ' --. -' L ' ---=!-...577.-- • - tt ov� ..A*NJ war +.r Ny y -,�'.40 • C15) NORDLING Proj. No.: 10-150 r ----t/_ STRUCTURAL RED ROCK T NTER \./ N ARD ENGINEERS, LLC ANDERSON/DABROWSKI ARCHITECTS i . .4'4 14 ` w . Y OIMIP i t 'a 1 lip-�. •. ! .mot 4 _ A.• r }rt x +r« _ ate •.. r - 116- ._ ... 4,. . . ''•,..., . -.A _. • •• . L , .s- M te` - - • t$ , ��'�, _ { r a.. A NORDLING Proj. No.: 10-150 tz,------ STRUCTURAL RED ROCK T CENTER GARD ENGINEERS, LLC ANDERSON/DABROWSKI ARCHITECTS 3uPzoil-00017 RECEIVED GEOCON AUG 31 2011 N O R T H W ES T GEOTECHNICAL CONSULTANTS FIELD REPORTCITYOFTIGARD AGE I OF I 8283 SW CIRRUS DRIVE BEAVERTON,OREGON 97008 UILDING DIVISI01 r PHONE:(503)626-9889 FAX:(503)626-8611 AY OF WEEK Wednesday DATE 06/29/11 OGRADING OTRENCH BACKFILL 0 OTHER REPORT NO. 5 PROJECT NAME PROJECT NO. OCOM Renovation P1644-05-02 O CLIENT PHONE PROJECT MANAGER FIELD TECHNICIAN/AUTHOR u Beam Development Sean Dixon John Hobbs N C CONTRACTOR PHONE PROJECT BRIEFING 0 YES DATE H LCG Pence BY 0 PREVIOUSLY BRIEFED A N G CONTRACTORS SUPERINTENDENT/FOREMAN PLANS AND SPECIFICATIONS 0 UNCHANGED- E Jim Hammons TITLE EQUIPMENT WORKING AND TYPE OF COMPACTOR BY Mining Loader,Mini-Track Hoes,Track Cats APPROVAL DATE REV.DATE WEATHER Overcast SOURCE OF FILL FOLLOW-UP INVENTORY DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT? OYES ONO LIST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT: LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP: WHAT IN PARTICULAR SHOULD BE OBSERVED,CHECKED,OR TESTED DURING NEXT VISIT? WAS A MEMO ISSUED TODAY?0 YES 0 NO MEMO NO. CONTRACTOR/FIELD TECHNICIAN ACTIVITIES—INDICATE ACTIVITIES YOU DID AND DID NOT OBSERVE. DOCUMENT CONVERSATIONS,OBSERVATIONS,OR OCCURRENCES,DEEMED SIGNIFICANT TO THE PROGRESS OF WORK,BE SPECIFIC AS TO WHO,WHAT,WHEN,AND WHERE. Arrived on site at the request of the contractor to observe the removal of the loose debris in the uncovered areas, and to observe the backfill of the voids. The exposed void at grid point E, 1.25 had loose material that was removed with a mini-track hoe. During the removal, a void directly north was exposed (along gridline E). The void extends a minimum of 5 feet outside the building footprint. Loose fill (spoils)was 18 inches to 2 feet below the footing subgrade and slopes down into the void as far as visible. There is a 5 to 6 foot span of unsupported footing visible. It may be possible to install helical anchors on either side of the unsupported span to support the increased footing loads in this area. This solution would need to be re-engineered and approved by the project structural engineer. Filling the void with CDF is also a possible solution. It is important that the CDF/concrete used make contact with the entire exposed subgrade surface of the footing. A '/2 inch diameter steel rod was used to probe the footing subgrades at A, 5 to A,7 to B,7 and B,4 to B,7. The spread footing subgrades at B, 5;B,6; C, 5; and C,6 were also checked. All footing subgrades were found to be firm and unyielding and seem to be competent material and is suitable for further construction. The material that was being removed during excavation remains unsuitable for use as backfill due to the high debris content. A Geocon Northwest representative will return to the site tomorrow,as requested. FIELD TECHNICIAN(PRINT) DATE HOURS O T. LIST ON-SITE VISITORS John Hobbs 06/29/11 NUMBER OF DENSITY TESTS TAKEN CLIENT REPRESENTATIVE SIGNATURE GEOCON N O R T H W EST FIELD REPORT GEOTECHNICAL CONSULTANTS PAGE ] OF ] 8283 SW CIRRUS DRIVE BEAVERTON,OREGON 97008 PHONE:(503)626-9889 FAX:(503)626-8611 DAY OF WEEK Thursday DATE 06/30/11 °GRADING OTRENCH BACKFILL 0 OTHER REPORT NO. 6 PROJECT NAME PROJECT NO OCOM Renovation P1644-05-02 O CLIENT PHONE PROJECT MANAGER FIELD TECHNICIAN/AUTHOR u Beam Development Sean Dixon John Hobbs N C CONTRACTOR PHONE PROJECT BRIEFING 0 YES DATE A LCG Pence BY 0 PREVIOUSLY BRIEFED N G CONTRACTOR'S SUPERINTENDENT/FOREMAN PLANS AND SPECIFICATIONS 0 UNCHANGED Jim Hammons TITLE EQUIPMENT WORKING AND TYPE OF COMPACTOR BY Mining Loader,Mini-Track Hoes,Track Cats APPROVAL DATE REV.DATE WEATHER Overcast SOURCE OF FILL FOLLOW-UP INVENTORY DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT? 0 YES 0 NO LIST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT. LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP: WHAT IN PARTICULAR SHOULD BE OBSERVED,CHECKED,OR TESTED DURING NEXT VISIT? WAS A MEMO ISSUED TODAY?0 YES 0 NO MEMO NO. CONTRACTOR/FIELD TECHNICIAN ACTIVITIES—INDICATE ACTIVITIES YOU DID AND O NOT OBSERVE, DOCUMENT CONVERSATIONS,OBSERVATIONS,OR OCCURRENCES,DEEMED SIGNIFICANT TO THE PROGRESS OF WORK,BE SPECIFIC AS TO WHO,WHAT,WHEN,AND WHERE. Arrived on site at the request of the contractor to observe footing excavations and void clean-up. The void at E, 1.25 was filled with 4 inch minus rock to approximately 2 feet below the subgrade of the existing footing. The rock was then sloped so that CDF would flow beneath the footing and into the void behind the footing. The CDF was poured into the void and above the subgrade of the footing until a static position was reached. A rock"dam" was pushed towards the footing so head pressure could be built and CDF was then added.The rock was then compacted and CDF was added to the entire void to 32 inches below the existing grade. The void at C.8, 3.5 was filled with 4 inch minus rock to approximately 6 inches above the subgrade of the existing footing and compacted.The void subgrade was approximately 10 feet below the existing grade. A '/2 inch diameter steel rod was used to check the grade beam footing subgrades at C, 7 to F, 7 to F, 6; and the spread footing subgrades at D,6 and E,6.All footing subgrades were found to be firm and unyielding with exception of the spread footing at D, 6 which required a 3'x9'x10" over-excavation to reach competent material that was suitable for further construction. An over- excavation of 4'x8'x2' was required at approximately E,6.5 to reach competent material. A Geocon Northwest representative will return to the site tomorrow,as requested. FIELD TECHNICIAN(PRINT) DATE HOURS 0 T. LIST ON-SITE VISITORS John Hobbs 06/30/11 NUMBER OF DENSITY TESTS TAKEN CUENT REPRESENTATIVE SIGNATURE GEOCON N O R T H W ES T FIELD REPORT GEOTECHNICAL CONSULTANTS PAGE 1 OF 1 8283 SW CIRRUS DRIVE BEAVERTON,OREGON 97008 PHONE:(503)626-9889 FAX:(503)626-8611 DAY OF WEEK Friday DATE 07/01/11 OGRADING OTRENCH BACKFILL 0 OTHER REPORT NO. 7 PROJECT NAME PROJECT NO. OCOM Renovation P1644-05-02 O CLIENT PHONE PROJECT MANAGER FIELD TECHNICIAN/AUTHOR u Beam Development Sean Dixon John Hobbs N C CONTRACTOR PHONE PROJECT BRIEFING 0 YES DATE H LCG Pence BY U PREVIOUSLY BRIEFED A N G CONTRACTORS SUPERINTENDENT/FOREMAN PLANS AND SPECIFICATIONS 0 UNCHANGED Jim Hammons TITLE EQUIPMENT WORKING AND TYPE OF COMPACTOR BY Mining Loader,Mini-Track Hoes,Track Cats APPROVAL DATE REV.DATE WEATHER Sunny _ SOURCE OF FILL FOLLOW-UP INVENTORY DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT? 0 YES 0 NO LIST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT: LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP: WHAT IN PARTICULAR SHOULD BE OBSERVED,CHECKED,OR TESTED DURING NE)I VISIT? WAS A MEMO ISSUED TODAY?O YES ONO MEMO NO CONTRACTOR/FIELD TECHNICIAN ACTIVITIES—INDICATE ACTIVITIES YOU DID AND DID NOT OBSERVE DOCUMENT CONVERSATIONS,OBSERVATIONS,OR OCCURRENCES,DEEMED SIGNIFICANT TO THE PROGRESS OF WORK,BE SPECIFIC AS TO WHO,WHAT,WHEN,AND WHERE. Arrived on site at the request of the contractor to evaluate the elevator pit and footings. The voids at E, 1.25 and C.8,3.5 were backfilled with compacted 4 inch minus rock to approximately subgrade. A 1/2 inch diameter steel rod was used to check the spread footings at D, 5 and D.4, 3; and the elevator pit between gridlines D and D.5. All subgrades were found to be firm and unyielding. The material appears to be competent and suitable for further construction. A Geocon Northwest representative will return to the site on Tuesday,as requested. FIELD TECHNICIAN(PRINT) DATE HOURS 0 T. LIST ON-SITE VISITORS John Hobbs 07/01/11 - NUMBER OF DENSITY TESTS TAKEN CLIENT REPRESENTATIVE SIGNATURE GEOCON N O R T )' W E S T FIELD REPORT GEOTECHNICAL CONSULTANTS PAGE 1 OF 1 8283 SW CIRRUS DRIVE BEAVERTON,OREGON 97008 PHONE:(503)626-9889 FAX:(503)626-8611 DAY OF WEEK Friday DATE 07/08/11 ()GRADING ()TRENCH BACKFILL 0 OTHER REPORT NO. 1 PROJECT NAME PROJECT NO. Red Rock Center P1475-05-02 CLIENT PHONE PROJECT MANAGER FIELD TECHNICIAN/AUTHOR Red Rock Business Associates Wes Spang Robert Pendell N C -CONTRACTOR PHONE PROJECT BRIEFING 0 YES DATE BY 0 PREVIOUSLY BRIEFED A Bones Construction G CONTRACTORS SUPERINTENDENT/FOREMAN PLANS AND SPECIFICATIONS 0 UNCHANGED Darren TITLE EQUIPMENT WORKING AND TYPE OF COMPACTOR BY APPROVAL DATE REV.DATE WEATHER SOURCE OF FILL FOLLOW-UP INVENTORY DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT? 0 YES 0 NO LIST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP WHAT IN PARTICULAR SHOULD BE OBSERVED,CHECKED,OR TESTED DURING NEXT VISIT? WAS A MEMO ISSUED TODAY,0 YES 0 NO MEMO NO. CONTRACTOR/FIELD TECHNICIAN ACTIVITIES—INDICATE ACTIVITIES YOU DID AND DID NOT OBSERVE. DOCUMENT CONVERSATIONS.OBSERVATIONS,OR OCCURRENCES,DEEMED SIGNIFICANT TO THE PROGRESS OF WORK BE SPECIFIC AS TO WHO,WHAT,WHEN,AND WHERE. Arrived on site at the request of the contractor to evaluate the subgrade after the site was stripped of vegetation. Upon arrival,the contractor was still stripping the site and the stripping material was stockpiled in the middle of the site.Geocon met with Bones Construction and stated that in order to properly evaluate the subgrade, the large stripping pile will need to be removed. Darren (Bones Construction) stated that the material for fill placement is out behind Coffee Creek Correction at the North Wilsonville exit. Darren requested that Geocon evaluate the material today. Brian Compton Trucking was supposed to be at the site with excavation equipment. Geocon visited the source site;however, nobody was on site. Geocon called Darren and stated that the material was not available to look at. Darren called back and stated that Brian would be on the site over the 2°d and 3`d of July to clear the stockpiles of tall grass and steel debris setting in the borrow area. A site visit was conducted on 7/2/11 at the source location,however,nobody was on site and the area still had grass and debris in stockpiles. A Geocon Northwest representative will return to the site upon request. FIELD TECHNICIAN(PRINT) DATE HOURS 0 T LIST ON-SITE VISITORS Robert Pendell 07/08/11 NUMBER OF DENSITY TESTS TAKEN CLIENT REPRESENTATIVE SIGNATURE ) GFJOcoN r FIELD REPORT PAGE ! OF 47---- DAY OF WEEK (me. t 0 GRADING 0 TRENCH BACKFILL 0 OTHER REPORT O.. ZG� •� REPORT NO. ( L PROJECT NAME PROJECT NO. CCGt- q 1 VCaC.i4 'C? • OZ— CLIENT PHONE PROJECT MANAGER FIELD TECHNICIAN/AUTHOR ' - -/t'� C• C,71*At.- 1 t Vi 1--437 --J,1-1-164,-x--, CONTRACTOR PHONE PROJECT BRIEFING 0 YES DATE BY L F'I :'•-" c--A-lc,--.7- `C l C� ® EVIOUSLY BRIEFED CONTRACTORS SUPERINTENDE /FOREMAN PLANS AND SPECIFI IONS Q-HINCHANGED VLF-'V/ \-C(Z `-( TITLE EQUIPMENT WORKING AND TYPE OF COMPACTOR BY (x►-Aug-._t( TVA-K i4x tii ()c t✓(In.(I cT 4rC(Gc:b,� APPROVAL DATE REy,DAB WEATHER Cs-%--fig :43(1c4 SOURCE OF FILL 1 - FOLLOW-UP INVENTORY DID YOU REVIEW PREVIOUS FOLLOW-UP !REPORT? 0 NO _ , LIST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT: LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP: WHAT IN PARTICULAR SHOULD BE OBSERVED,CHECKED,OR TESTED DURING NE1 VISIT WAS A MEMO ISSUED TODAY? 'C3 NO 0 YES MEMO NQG CONTRACTOR/FIELD TECHNICIAN ACTIVITIES—INDICATE ACTIVITIES YOU DID AND ID NOT OBSERVE. DOCUMENT CONVERSATIONS,OBSERVATIONS,OR OCCURRENCES,DEEMED SIGNIFICANT TO THE PROGRESS OF WORK,BE SPECIFIC AS TO WHO,WHAT,WHEN,AND WHERE. 4-S-•./.�- - � ` ._C G-Z-LP1.-A:C Z ..._ _ _ 1a__.._1�-.S 4 ..C1'7JC- 'S,(Pr1�C3,,!I _'_4!` 1>- -- - .-- - L�(4-tc.2h CL- c''F .C=cr,Tuk,-(( Lz tcc 4(l�4, . A.- C-iL�-4? " 1-1 .--qc k1,--.. Az a,--4:_-I.3._..-. 1)...Z _ n'f.t4smtk_, -(4`=4?ci--Q'4s:-- 'Ts.=?=-7:" ._ \.Q ;_ .L: 4?.4' C� j_._ '-.i45, r,itr`ki_ . t21460l . - _ce71. 7. &,ct-tk4cz-. A11-`_ .4'i5.(-- c-? .l- .L-A"LZ...-_. _-_----_ t V(. t -- .._.._C 5 7.c z.cl--( ..od../.__ .t,)-tC ..-v P a z-._c %c -j r_ -------- -- . -l..i(k T _L. .__Z s...I$r,..t _ -..11._ .._ter-. n_.._ -.__vim-_.M -nom. d .ccsz _ _ l .a rNI,- 1> -C= _._ __ a U .' c?._!l_' _r;_.. L\/ - 411.-dLSt.1 G,P--4'�. .- _ . _. 'c -' -i . ---4.\\L.... l�Cr/c'-c 1.U-it 1- S_ .rc,�?!ic \u1. - _4l ...S.,Z_t-_L'Si-? 7 ._ ._._ ---- M9 -c4�.. .ii._t . 4c `' - .> $ crn-" .. �i�-,1-t, f:tt- c IL-k4-1 . ._AV!r'- . .4 .tom i-4-4,4 "S-_ 'CL-cX-- - 7?_ . C� . . 7x-�:4!--!\_. c*-. _: 2'_ 6j,-x'44._.Y -t�b7.-___...._ "r/A .---k _C-ef-409‹.-7)4...(r� _ 1'b 4L_ "C_K.. c:DF :Sr __"i> `n t._.( . 717,-,.4z-.--, �.. c 'n� -mac_cc.( :k►..t,1-!L�.?1-.. ._. 1._ ct(,.:rr t--- _�.. '=t.?_Rcc r?.t-- --_5s.V-c-( ' _ `T+t ?- -1-&4ctL-CDL c 71 4- -r:, S —F. . s V iC),._t . 5+ '2 ' .._. t ._ . . -.. . _ . - - . - . z) A %._4__ - (t,i.. -u�__. - K --'-c(? _ -kyx.! . �. S.C, .. . - Y -- ---. t -& ("-> r.)1,__�- ."t T 1--fti5. L . xc.x._-- �t---(h• -t ' .Lkr.. t A_ , �--/ Vi ..._ _. ._.. "c,/ 3 N1--1•t�-_ z7--_-=,73.- 41-jb_ (r 2.- . ...Al-ti T C.:- _.6 rf 4 .`-'K..z.kt"4. - cl7 -'._.. ._ .- _.--- /NT- ..E,_I .._it _..7), t- .Y._. At,__ -45.`>?<?tL-L _ FtrZ .\_.. fit--- ._L. .F-Ic-I<tL:"� r(-r - `-Hl'5.7t--i. _ C_W--=.,'"1-.!\ ` - . cr`1 .Gc--71 ----_(1--_h!C'ry� .+j✓_lk71-7c _LA l—,. A,r-T,7. _.5,+�1--?(-..- ...__.... g) 'viL.• t isC?(7-A-P sr /' c Q— I>, t. 1`l.4,;S (2:23-4-ovc.i� 1C' f� ■ FIELD TECHNICIAN(PRINT) DATE HOURS �0.T. LIST ON-SITE VISITORS - Ott-( �wis 4. ,i t t\/• <-743a-((r( .wit ytx.(. NUMBER OF DENSITY TESTS TAKEN CLIENT REPRESENTATIVE SIGNATURE X NOTICE: The professional engineer is represented on site solely to observe operations of the contractor Identified,form opinions about the adequacy of those operations,and report those opinions to the client. The presence and activities of the engineer's field representative do not relieve the contractor's obligation to meet contractual requirements. The contractor retains sole responsibility for site safety and the methods and sequences of construction. FIELD REPORT PAGE 2 OF .Z- , DAY OF WEEK'1`g.-I DATE,c CJ O GRADING 0 TRENCH BACKFILL 0 OTHER REPORT NO. t PROJECT NAME PROJECT NO c C 4 _ t�cact- CONTRACTOR/FIELD TECHNICIAN ACTIVITIES INDICATE ACTMTIES YOU DID AND r'n NT OBSERVE. DOCUMENT CONVERSATIONS,OBSERVATIONS,OR OCCURRENCES,DEEMED SIGNIFICANT TO THE PROGRESS OF WORK,BE SPECIFIC AS TO WHO,WHAT,WHEN,AND WHERE. l SO. \\,/ m"4� rte, L-r►--( �crc-rY1 1(,-) <�?i?�r-_� ��: A Z� '�3L. !ate�3� kti/ L c c1471,-.trAc_'7-c a) A g rr 17-c c c '1 Z_ -�l lit f-C ?I Z c 7 F t+r CtiA(- 1-• `-l'$, S.et-X7-7E) ?'i7 r-t(r_u_n )t<( Ct_ L��W.„CG-i •w!L tr- A '`Dt4-. �} A C.-KT/Z-7 t t---t•\\/ _ mac. � .t LAr' --i eT 1\--, • • NOTICE: The professional engineer is represented on site solely to observe operations of the contractor Identified,form opinions about the adequacy of those operations and report those opinions to the client. The presence and activities of the engineer's field representative do not relieve the contractor's obligation to meet contractual requirements. The contractor retains sole responsibility for site safety and the methods and sequences of construction. FAW PJOBIGEOCONO FFlCE\TYP\FIELD1T110FLDRPT.rN(rev.01/01) GEOCON N O R T H W EST FIELD REPORT GEOTECHNICAL CONSULTANTS PAGE 1 OF 1 8283 SW CIRRUS DRIVE BEAVERTON,OREGON 97008 PHONE:(503)626-9889 PAX:(503)620-8611 DAY OF WEEK Wednesday DATE 07/13/11 OGRADING OTRENCH BACKFILL 0 OTHER REPORT NO. _2 PROJECT NAME PROJECT NO. Red Rock Center P1475-05-02 CLIENT PHONE PROJECT MANAGER FIELD TECHNICIAN/AUTHOR Red Rock Business Associates Wes Spang Robert Pendell N C CONTRACTOR PHONE PROJECT BRIEFING 0 YES DATE " Bones Construction BY 0 PREVIOUSLY BRIEFED A N G CONTRACTOR'S SUPERINTENDENT/FOREMAN PLANS AND SPECIFICATIONS 0 UNCHANGED Dan-en TITLE EQUIPMENT WORKING AND TYPE OF COMPACTOR BY APPROVAL DATE REV.DATE . WEATHER SOURCE OF FILL FOLLOW-UP INVENTORY DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT? 0 YES 0 NO LIST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT: LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP WHAT IN PARTICULAR SHOULD BE OBSERVED,CHECKED,OR TESTED DURING NEXT VISIT? WAS A MEMO ISSUED TODAY?0 YES 0 NO MEMO NO. CONTRACTOR/FIELD TECHNICIAN ACTIVITIES—INDICATE ACTIVITIES YOU DID AND DID NOT OBSERVE. DOCUMENT CONVERSATIONS,OBSERVATIONS,OR OCCURRENCES,DEEMED SIGNIFICANT TO THE PROGRESS OF WORK,BE SPECIFIC AS TO WHO,WHAT,WHEN,AND WHERE. Arrived on site at the request of the contractor to evaluate an inflow water issue at the roadway expansion on 72nd Avenue and the corner of 72nd Avenue and Dartmouth Street. At the 72'Avenue expansion, a considerable inflow of water on the excavated subgrade for the roadway was observed.At the corner of 72nd Avenue and Dartmouth Street there was water inflow from an existing trench line that runs to a manhole on the property. The inflow off of Dartmouth Street is in a structural area of the Dartmouth roadway expansion and sidewalk. It is Geocon's opinion that some type of drain system be installed at both locations prior to any base rock placement. The contractor had approximately 12 to 15 cubic yards of material that was excavated on site and wanted to use it as fill material. Geocon stated that the material is unsuitable for any structural fill on site. The stripping stockpile was still on site;Geocon will not be able to evaluate the stripped subgrade until it is removed. A Geocon Northwest representative will return to the site upon request. FIELD TECHNICIAN(PRINT) DATE HOURS O.T. LIST ON-SITE VISITORS Robert Pendell 07/13/11 NUMBER OF DENSITY TESTS TAKEN CLIENT REPRESENTATIVE SIGNATURE pqcprr E H W ES T GEOTECHNICAL CONSULTANTS FIELD REPORT PAGE 1 OF 1 8283 SW CIRRUS DRIVE BEAVERTON,OREGON 97008 PHONE:(503)628-9885 FAX:(503)626-8611 DAY OF WEEK Thursday DATE 07/14/11 ()GRADING ()TRENCH BACKFILL ()OTHER REPORT NO. 3 PROJECT NAME PROJECT NO. Red Rock Center P1475-05-02 O CUENT PHONE PROJECT MANAGER FIELD TECHNICIAN/AUTHOR u Red Rock Business Associates Wes Spang Robert Pendell N CONTRACTOR PHONE PROJECT BRIEFING O YES DATE BY 0 PREVIOUSLY I3RIEFED A Bones Construction G CONTRACTORS SUPERINTENDENT/FOREMAN PLANS AND SPECIFICATIONS 0 UNCHANGED Darren TITLE D - EQUIPMENT WORKING AND TYPE OF COMPACTOR BY APPROVAL DATE REV.DATE WEATHER SOURCE OF FILL FOLLOW-UP INVENTORY DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT? 0 YES 0 NO UST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT: UST REPORT NUMBERS STILL REQUIRING FOLLOW-UP: WHAT IN PARTICULAR SHOULD BE OBSERVED,CHECKED,OR TESTED DURING NE&VISrr? WAS A MEMO ISSUED TODAY?O YES 0 NO MEMO NO. CONTRACTOR/FIELD TECHNICIAN ACTIVITIES—INDICATE ACTMTIES YOU DID AND DID NOT OBSERVE. DOCUMENT CONVERSATIONS,OBSERVATIONS,OR OCCURRENCES,DEEMED SIGNIFICANT TO THE PROGRESS OF WORK,BE SPECIFIC AS TO WHO,WHAT,WHEN,AND WHERE. Arrived on site at the request of the contractor to evaluate the stripped subgrade at selected areas of the site. A fully loaded 10 to 12 cubic yard dump truck was used to proof-roll the stripped subgrade on a portion of the north 1/3 of the site,the south 1/3 of the site,and the roadway extension footprint.The subgrade was observed to be firm and ready for continued construction with the exception of an area that was 30 feet by 30 feet in the western end of the north 1/3 of the site. This area requires an over-excavation of one foot to remove soft material that has some organic material. The stripping stockpile remains on site;therefore,Geocon was not able to evaluate the stripped subgrade.Additionally, Geocon was not able to observe a proof-roll of an area in the north 1/3 of the site due to the stockpile of unsuitable material that was mentioned in the previous field report. The contractor has not yet determined the fill source material. A Geocon Northwest representative will return to the site upon request. FIELD TECHNICIAN(PRINT) DATE HOURS O.T. LIST ON-SITE VISITORS Robert Pendell 07/14/11 NUMBER OF DENSITY TESTS TAKEN CUENT REPRESENTATIVE SIGNATURE GEOCON W E s T CEOTECHNICALCONSULTANTS FIELD REPORT PAGE 1 OF 1 SW SW CIRRUS DRIVE BEAVERTON,OREGON 97006 PHONE:(S03)626-9669 FAX:(S03)626-6611 DAY OF WEEK Monday DATE 07/25/11 OGRADING OTRENCH BACKFILL 0 OTHER REPORT NO. 4 PROJECT NAME PROJECT NO. Red Rock Center P1475-05-02 O CLIENT PHONE PROJECT MANAGER FIELD TECHNICIAN/AUTHOR u Red Rock Business Associates Wes Spang Robert Pendell N I C CONTRACTOR PHONE PROJECT BRIEFING 0 YES DATE Bones Construction BY 0 PREVIOUSLY BRIEFED A O CONTRACTOR'S SUPERINTENDENT/FOREMAN PLANS AND SPECIFICATIONS 0 UNCHANGED Darren TITLE D � EQUIPMENT WORKING AND TYPE OF COMPACTOR BY APPROVAL DATE REV.DATE........... I WEATHER SOURCE OF FILL FOLLOW-UP INVENTORY DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT? 0 YES 0 NO LIST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT: LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP: - WHAT IN PARTICULAR SHOULD BE OBSERVED,CHECKED,OR TESTED DURING NEXT VISIT? WAS A MEMO ISSUED TODAY?0 YES 0 NO MEMO NO. CONTRACTOR/FIELD TECHNICIAN ACTIVITIES—INDICATE ACTIVITIES YOU MO AND WQNQTOBSERVE DOCUMENT CONVERSATIONS,OBSERVATIONS,OR OCCURRENCES,DEEMED SIGNIFICANT TO THE PROGRESS OF WORK,BE SPECIFIC AS TO WHO.WHAT,WHEN,AND WHERE. Arrived on site at the request of the contractor to evaluate the stockpiled material in the building pad footprint for use as fill material. Approximately 100 cubic yards of material was observed to be satisfactory for fill placements. The contractor has not over- excavated the west 1/3 of the building footprint or the area in the new roadway alignment. Geocon conducted a site visit at Bones Construction site in Tualatin,Oregon to obtain a soil sample of the proposed fill material to be used at Red Rock Center,Two,5 gallon buckets and three sealed bag samples were collected for testing purposes. Geocon will obtain the in-place moisture range from the sealed bag samples. It appears that the material has a high moisture content in-field.The material was observed to be satisfactory for use as fill placement with optimum moisture testing to follow. The results of the soil moisture tests ranged from 23.8%to 30.0%. A Geocon Northwest representative will return to the site upon request. FIELD TECHNICIAN(PRINT) DATE HOURS O.T. LIST ON-SITE VISITORS Robert Pendell 07/25/11 NUMBER OF DENSITY TESTS TAKEN CLIENT REPRESENTATIVE SIGNATURE �jI piqcp ,v E s T (4 GEQTECHNICALCONSULTANTS FIELD REPORT PAGE 1 OF 1 8283 SW CIRRUS DRIVE BEAVERTON,OREGON 97008 PRONE:(503)626.9889 PAX:(503)626.8611 DAY OF WEEK Tuesday DATE 07/26/11 OGRADING OTRENCH BACKFILL 0 OTHER REPORT NO. 5 PROJECT NAME PROJECT NO. Red Rock Center P1475-05-02 CLIENT PHONE PROJECT MANAGER FIELD TECHNICIAN/AUTHOR uu Red Rock Business Associates Wes Spang Robert Pendell N C CONTRACTOR PHONE ' PROJECI BRIEFING 0 YES DATE BY .0 PREVIOUSLY BRIEFED A Bones Construction G• CONTRACTOR'S SUPERINTENDENT/FOREMAN PLANS AND SPECIFICATIONS 0 UNCHANGED Darren TITLE EQUIPMENT WORKING AND TYPE OF COMPACTOR BY APPROVAL DATE REV.DATE_.___.... WEATHER SOURCE OF FILL FOLLOW-UP INVENTORY DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT? 0 YES 0 NO LIST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT: LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP: WHAT IN PARTICULAR SHOULD BE OBSERVED.CHECKED,OR TESTED DURING. .1 VISIT? WAS A MEMO ISSUED TODAY?O YES ONO MEMO NO. CONTRACTOR/FIELD TECHNICIAN ACTIVITIES—INDICATE ACTIVITIES YOU DID AND DID NOT OBSERVE. DOCUMENT CONVERSATIONS,OBSERVATIONS.OR OCCURRENCES,DEEMED SIGNIFICANT TO THE PROGRESS Of WORK,SE SPECIFIC AS TO WHO,WHAT,WHEN,AND WHERE. Arrived on site at the request of the contractor to evaluate the over-excavated subgrades at the west 1/3 of the building footprint and an area in the proposed roadway alignment. The excavated subgrades were observed to be satisfactory for continued construction. The two areas of over-excavation are as follows: Building footprint: 48'x42'x l' Roadway alignment: 30'x 15'x l' A Geocon Northwest representative will return to the site upon request. • FIELD TECHNICIAN(PRINT) DATE T HOURS 0.T. LIST ON-SITE VISITORS Robert Pendell 07/26/11 NUMBER OF DENSITY TESTS TAKEN CLIENT REPRESENTATIVE SIGNATURE f � GEOCON N D R T Ir W F S T CCOTECIINIC.ALCONSULTANTS FIELD REPORT 8283 SW CIRRUS DRIVE BEAVERTON,OREGON 97001 PAGE 1 OF I PRONE:(503)626-9889 FAX:(503)076-1611 DAY OF WEEK Wednesday OGRADING OTRENCH BACKFILL 0 OTHER DATE 07/27/11 REPORT NO. 6 PROJECT NAME PROJECT NO. Red Rock Center P 1475-05-02 0 CLIENT PHONE PROJECT MANAGER FIELD TECHNICIAWALRHOR Red Rock Business Associates Wes Spang p $ Robert Pendell C CONTRACTOR PHONE PROJECT BRIEFING 0 YES DATE A Bones Construction BY 0 PREVIOUSLY BRIEFED H O CONTRACTOR'S SUPERINTENDENT/FOREMAN PLANS AND SPECIFICATIONS 0 UNCHANGED Darren TITLE EQUIPMENT WORKING AND TYPE OF COMPACTOR BY APPROVAL DATE REV.DATE WEATHER SOURCE OF FILL FOLLOW-UP INVENTORY DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT? 0 YES 0 NO LIST REPORT NUMBERS WHERE FOLLOW-Up WAS SATISFIED BY THIS REPORT. LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP: WHAT IN PARTICULAR SHOULD BE OBSERVED.CHECKED,OR TESTED DURING NEXT VISIT? WAS A MEMO ISSUED TODAY?O YES ONO MEMO NO. CONTRACTOR/FIELD TECHNICIAN ACTIVITIES—INDICATE ACTMT1ES YOU DID AND pro NOT OBSERVE. DOCUMENT CONVERSATIONS,OBSERVATIONS,OR OCCURRENCES,DEEMED SIGNIFICANT TO THE PROGRESS OF WORK,BE SPECIFIC AS TO WHO,WHAT,WHEN.AND WHERE _ Onsite today to observe general construction process on building pad footprint pa pri»t and roadway alignment footprint. We collected the moisture content bag samples of fill material at Bones site in Tualatin. The in-field moisture content ranged from 23.8% to 30%. The max thy density and optimum moisture results of the proctor test performed at our laboratory were determined to be 107 pcf at 18%. Therefore moisture conditioning will need to be performed prior to any placement of this fill material.This information was communicated to Darren with Bones Construction. We conducted preliminary in-place density testing of the fill material that had been placed and compacted in the existing ditch- line at the north end of the building footprint.The test results revealed the fill placed to be high of optimum moisture at 25.9% and at 89% max dry density. This further indicates that the import fill material will require moisture conditioning prior to placement. We conducted an afternoon site visit at the request of the contractor to evaluate fill placement after mixing the import material with drier onsite soil in an attempt to reduce the moisture content. In-place density testing revealed compaction to range from 88%to 91%with moisture content ranging from 24%to 25%.This does not meet the design specification requirement. Had phone conversation with Matt with Bones and conveyed the results of testing today and was advised that Bones would halt trucking this afternoon until issues with moisture can be resolved, A Geocon Northwest representative will return to the site upon request. IELD TECHNICIAN(PRINT) DATE HOURS O.T. LIST ON-SITE VISITORS Robert Pendell 07/27/11 !UMBER OF DENSITY TESTS TAKEN CLIENT REPRESENTATIVE SIGNATURE A.. • •v GEOCON N O R TB W E S T GEOTECHNICAL CONSULTANTS FIELD REPORT PAGE 1 OF 2 1293 SW CIRRUS DRIVE BEAVERTON,OREGON 97000 PHONE:(503)626-9009 FAX:(503)626-1611 DAY OF WEEK Thursday DATE 07/28/11 OGRADING OTRENCH BACKFILL 0 OTHER REPORT NO. 7 PROJECT NAME PROJECT NO. Red Rock Center P1475-05-02 CLIENT PHONE PROJECT MANAGER FIELD TECHNICIAN/AUTHOR 0u Red Rock Business Associates Wes Spang Robert Pendell N C CONTRACTOR PHONE PROJECT BRIEFING 0 YES DATE Bones Construction BY 0 PREVIOUSLY BRIEFED A G CONTRACTORS SUPERINTENDENT/FOREMAN PLANS AND SPECIFICATIONS 0 UNCHANGED Darren TITLE D - EQUIPMENT WORKING AND TYPE OF COMPACTOR BY APPROVAL DATE REV.DATE WEATHER Sunny 84°F _ SOURCE OF FILL FOLLOW-UP INVENTORY DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT? 0 YES 0 NO UST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT: LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP: WHAT IN PARTICULAR SHOULD BE OBSERVED,CHECKED,OR TESTED DURINGbLIQ VISIT? WAS A MEMO ISSUED TODAY?0 YES 0 NO MEMO NO. CONTRACTOR/FIELD TECHNICIAN ACTIVITIES—INDICATE ACTIVITIES YOU DID AND j ID NOT OBSERVE. DOCUMENT CONVERSATIONS,OBSERVATIONS,OR OCCURRENCES,DEEMED SIGNIFICANT TO THE PROGRESS OF WORK.BE SPECIFIC AS TO WHO,WHAT,WHEN,AND WHERE. Arrived on site at the request of the contractor to evaluate the placement of fill on the building pad footprint and the new roadway alignment. Geocon received a call from Brian Keicher requesting a notification when Geocon would be on site so that he could make a visit at the same time.Geocon received the call after the 8:00 AM visit. Geocon called Brian Keicher at 11:00 AM and left a message that the contractor requested an afternoon visit at 1:00 PM to conduct in-place density testing at the western 1/3 of the building pad footprint. In-place density testing was conducted on the first 1 foot fill placement on the west 1/3 of the building pad footprint. The test revealed moisture of 23.5%which does not meet design specification requirements,requiring additional moisture conditioning. A site visit was conducted at 1:00 PM as requested by the contractor. Geocon observed that the contractor had trucked approximately 15 loads of fill material in on 7/27/11 and spread out to condition the material's moisture. In-place moisture testing was conducted at various locations in the farmed material. This material had been spread in the late afternoon on 7/27/11. The moisture range was observed to be 18.5% to 20%, which is in the range of the specification requirements. During the afternoon visit,Brian Keicher did not visit the site. The contractor requested a site visit on 7/29/11 in the morning, at which time there will be a meeting with Matt (Bones Construction), Brian Keicher, Red Rock business associates, and Robert Pendell(Geocon Northwest). This meeting is about an issue that Matt(Bones)has with the moisture content of the fill material coming on site.Matt believes the moisture to be closer FIELD TECHNICIAN(PRINT) DATE HOURS O.T. UST ON-SITE VISITORS Robert Pendell 07/28/11 NUMBER OF DENSITY TESTS TAKEN CUENT REPRESENTATIVE SIGNATURE p1:qcp N R W F S T GETECHNICAL 8283 SW CIRRUS DRIVE LTA SW OREGON 97008 FIELD REPORT PAGE 2 OF 2 PHONE:(503)626-9889 FAX:(903)626-8611 DAY OF WEEK Thursday DATE 7/28/11 OGRADING OTRENCH BACKFILL 0 OTHER REPORT NO. 7 PROJECT NAME PROJECT NO. Red Rock Center P1475-05-02 CONTRACTOR/FIELD TECHNICIAN ACTIVITIES—INDICATE ACTMTIES YOU DID AND DID NOT OBSERVE DOCUMENT CONVERSATIONS.OBSERVATIONS,OR OCCURRENCES,DEEMED SIGNIFICANT TO THE PROGRESS OF WORK BE SPECIFIC AS TO WHO,WHAT,WHEN,AND WHERE. to 15%from the borrow site rather than the results of Geocon's laboratory testing of the moisture(23.8%to 30%)and in-place density testing conducted on 7/27/11 with a moisture range of 24.5%to 25.9%and compaction range of 88%to 91%. Geocon observed that the loaded dump trucks(10 to 12 cubic yard trucks)and maxi dump trucks(14 to 15 cubic yard trucks) continue to rut the stripped subgrade due to the heavy loads.This was previously brought to Darren's(Bones Construction) attention with a response from Darren that they would repair it at a later date. A Geocon Northwest representative will return to the site tomorrow,as requested. FIELD TECHNICIAN(PRINT) DATE HOURS O.T. LIST ON-SITE VISITORS Robert Pendell 07/28/11 GEOCON N O R T H W ES T GEOTECHNICAL CONSULTANTS FIELD REPORT PAGE 1 OF 2 8283 SW CIRRUS DRIVE BEAVERTON,OREGON 97008 PHONE: (503)626-9889 FAX:(503)626-8611 DAY OF WEEK Friday DATE 07/29/11 OGRADING OTRENCH BACKFILL 0 OTHER REPORT NO. 8 PROJECT NAME PROJECT NO. Red Rock Center P 1475-05-02 O CLIENT PHONE PROJECT MANAGER FIELD TECHNICIAWAUTHOR u Red Rock Business Associates Wes Spang Robert Pendell N C CONTRACTOR PHONE PROJECT BRIEFING 0 YES DATE ", Bones Construction BY 0 PREVIOUSLY BRIEFED N G CONTRACTORS SUPERINTENDENT/FOREMAN PLANS AND SPECIFICATIONS 0 UNCHANGED Darren TITLE EQUIPMENT WORKING AND TYPE OF COMPACTOR BY APPROVAL DATE REV.DATE WEATHER Sunny 83°F SOURCE OF FILL FOLLOW-UP INVENTORY DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT' 0 YES 0 NO LIST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT. LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP. WHAT IN PARTICULAR SHOULD BE OBSERVED,CHECKED,OR TESTED DURING j (T VISIT? WAS A MEMO ISSUED TODAY?0 YES 0 NO MEMO NO CONTRACTOR/FIELD TECHNICIAN ACTIVITIES—INDICATE ACTIVITIES YOU DID AND DID NOT OBSERVE DOCUMENT CONVERSATIONS.OBSERVATIONS.OR OCCURRENCES.DEEMED SIGNIFICANT TO THE PROGRESS OF WORK BE SPECIFIC AS TO WHO,WHAT,WHEN,AND WHERE Arrived on site at the request of the contractor to evaluate fill placements on the building pad footprint and roadway alignment, and to attend a meeting with Matt(Bones Construction),Brian Keicher,Red Rock business associates. Upon arrival, Geocon observed that Carlson Testing was on site to conduct in-place testing of the fill placement at locations where Geocon took tests. Apparently this follow up of Geocon's testing pertains to the moisture contents of Bones Construction's fill material. In-place density testing was conducted on the fill placements at various locations on site.Test results and locations are shown on the attached sheet. Test results revealed that tests 1 through 5 met the design specification requirements and tests 6 through 8 did not meet the design specification requirements,which require additional moisture conditioning. A fully loaded 10 to 12 cubic yard dump truck was used to proof-roll the center 1/3 of the building pad footprint after the stockpiled material was removed.The subgrade was observed to be satisfactory with the exception of a small area that has drawn moisture from the stockpiled material. The contractor plans to leave this area uncovered to dry back with the current high temperature before fill placements. Geocon met with Red Rock business associates, Brian Keicher, and Matt (Bones Construction) explaining Geocon's observations to date in respect to the moisture of the fill material that was imported to the site. Geocon explained that the moisture content of the material that was trucked to the site is high of optimum moisture content. However, after moisture conditioning the material back to 18% to 20%, compaction of the fill placements meet or exceed the required 95% compaction of the maximum dry density obtained in laboratory testing. Matt (Bones Construction) stated in the meeting that they do not have the budget to conduct the moisture conditioning process.This issue is one that only Brian Keicher can address. FIELD TECHNICIAN(PRINT) DATE HOURS O.T. LIST ON-SITE VISITORS Robert Pendell 07/29/11 NUMBER OF DENSITY TESTS TAKEN CLIENT REPRESENTATIVE SIGNATURE GEOCON N OR T H W ES T 8283 SW CIRRUS DRIVE CONSULTANTS BEAVERTON,OREGON 97008 FIELD REPORT PAGE 2 OF 2 PHONE:(503)626-9889 FAX:(503)626-8611 DAY OF WEEK Friday DATE 07/29/11 OGRADwNG OTRENCH BACKFILL 0 OTHER REPORT NO. 8 PROJECT NAME PROJECT NO. Red Rock Center P1475-05-02 CONTRACTOR/FIELD TECHNICIAN ACTIVITIES--INDICATE ACTIVITIES YOU DID AND DID NOT OBSERVE. DOCUMENT CONVERSATIONS.OBSERVATIONS,OR OCCURRENCES,DEEMED SIGNIFICANT TO THE PROGRESS OF WORK,BE SPECIFIC AS TO WHO,WHAT,WHEN,AND WHERE. The contractor called and cancelled the afternoon site visit and requested a site visit on 7/30/11.A Geocon Northwest representative will return at that time. FIELD TECHNICIAN( DATE HOURS O.T. UST ON-SITE VISITORS Robert Pendell 07/29/11 çiiqcp N H W ES T GEOTECHNICAL CONSULTANTS FIELD REPORT PAGE 1 OF 2 8283 SW CIRRUS DRIVE BEAVERTON,OREGON 97008 PHONE: (503)626-9889 FAX:(503)626-8611 DAY OF WEEK Saturday DATE 07/30/11 OGRADING OTRENCH BACKFILL 0 OTHER REPORT NO. 9 PROJECT NAME PROJECT NO. Red Rock Center P1475-05-02 O CLIENT PHONE PROJECT MANAGER FIELD TECHNICIAN/AUTHOR u Red Rock Business Associates Wes Spang Robert Pendell N C CONTRACTOR PHONE PROJECT BRIEFING O YES DATE A Bones Construction BY RIEFED G CONTRACTORS SUPERINTENDENT/FOREMAN PLANS AND SPECIFICATIONS 0 UNCHANGED D Darren TITLE EQUIPMENT WORKING AND TYPE OF COMPACTOR BY APPROVAL DATE REV.DATE WEATHER Sunny 84°F SOURCE OF FILL FOLLOW-UP INVENTORY DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT? 0 YES 0 NO UST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT: LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP: WHAT IN PARTICULAR SHOULD BE OBSERVED.CHECKED,OR TESTED DURING ffUS]VISIT? WAS A MEMO ISSUED TODAY?0 YES 0 NO MEMO NO. CONTRACTOR/FIELD TECHNICIAN ACTIVITIES—INDICATE ACTIVITIES YOU DID AND DID NOT OBSERVE. DOCUMENT CONVERSATIONS,OBSERVATIONS.OR OCCURRENCES,DEEMED SIGNIFICANT TO THE PROGRESS OF WORK BE SPECIFIC AS TO WHO,WHAT,WHEN,AND WHERE. Arrived on site at the request of the contractor to evaluate fill placements at various locations. In-place density testing was conducted on the fill placements at the ditch line, building pad footprint, and roadway alignment. Test results and locations are shown on the attached sheet. Test results revealed that compaction tests 9 through 12 met the design specification requirements and tests 13 through 15 did not meet the design specification requirements and will require moisture conditioning and compaction efforts before retesting. Geocon understands that the wall is to be constructed at the west side of the roadway alignment. Bones Construction stipulated that the center line of the wall is at the bottom of the slope on the current roadway fill. In Geocon's opinion, the roadway fill placements should be placed and compacted past the center of the wall footprint for wall load support. A Geocon Northwest representative will return to the site upon request. FIELD TECHNICIAN(PRINT) DATE HOURS O.T. LIST ON-SITE VISITORS Robert Pendell 07/30/11 NUMBER OF DENSITY TESTS TARN CUENT REPRESENTATIVE SIGNATURE COMPACTION TEST SUMMARY Project Name: Red Rock Center Project it: P1475-05-02 Tech Test Dab r Tests Location Elevation(ft) Curve S Dry Density %Moisture %Compaction Specification Test Type, Remarks 735 7/29/2011 1 Building Pad-West 1/3(Back Scatter) +2' 1 105.2 20 98 95 NU PASS 735 7/29/2011 2 Building Pad-West l/3(Pinto 8 inches) +2' 1 105.5 20 98 95 NU PASS 735 7/29/2011 3 Ditch Line +1' 1 103.8 21 97 95 NU PASS 735 7/29/2011 4 Ditch Line +2' 1 106.8 19 99 95 NU PASS 735 7/29/2011 5 Roadway East Side-North 1/2 +1' 1 104 20 97 95 NU PASS 735 7/29/2011 6 Roadway East Side-South 1/2 +1' 1 100 22 94 95 NU FAIL 735 7/29/2011 7 Roadway East Side-South 1/2 +1' 1 98.1 25 91 95 NU FAIL, 735 7/29/2011 8 Building Pad-East 1/2 +1' 1 99.5 23 93 95 NU FAIL 735 7/30/2011 9 Building Pad-West 1/3 +3' I 102 24 95 95 NU PASS 735 7/30/2011 10 Building Pad-East 1/3 +1' 1 101.5 21 95 95 NU PASS 735 7/30/2011 I1 Ditch +3' 1 101.8 21 95 95 NU PASS 735 7/30/2011 12 Ditch +3' l 101.5 23 95 95 NU PASS 735 7/30/2011 13 Building Pad-Center 1/3 +1' 1 98.3 24 92 95 NU FAIL 735 7/30/2011 . 14 Roadway _ +3' 1 _ 91.7 25 86 NU FAIL 735 7/30/2011 15 Roadway +3' 1 93.9 26 87 95 NU FAIL Curve Number Maximum Dry Density Optimum Moisture Si Material Description 1 107.5 18 Sandy Silt with Occasional Gravel GEOCON N O R T H W E S T FIELD REPORT GEOTECHNICAL CONSULTANTS PAGE 1 OF 2 8283 SW CIRRUS DRIVE BEAVERTON,OREGON 97008 PHONE:(503)626-9889 FAX:(503)626-8611 DAY OF WEEK Thursday DATE 08/11/11 °GRADING ()TRENCH BACKFILL 0 OTHER REPORT NO. 15 PROJECT NAME PROJECT NO. Red Rock Center P 1475-05-02 O CLIENT PHONE PROJECT MANAGER FIELD TECHNICIAN/AUTHOR u Red Rock Business Associates Wes Spang Robert Pendell N C CONTRACTOR PHONE PROJECT BRIEFING 0 YES DATE H BY 0 PREVIOUSLY BRIEFED A Bones Construction N G CONTRACTOR'S SUPERINTENDENT/FOREMAN PLANS AND SPECIFICATIONS 0 UNCHANGED Darren TITLE EQUIPMENT WORKING AND TYPE OF COMPACTOR BY APPROVAL DATE REV.DATE WEATHER SOURCE OF FILL FOLLOW-UP INVENTORY DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT? 0 YES 0 NO LIST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT: LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP: WHAT IN PARTICULAR SHOULD BE OBSERVED,CHECKED,OR TESTED DURING LIE, I VISIT? WAS A MEMO ISSUED TODAY?0 YES 0 NO MEMO NO. CONTRACTOR/FIELD TECHNICIAN ACTIVITIES—INDICATEACTIVITIESYOUDIDANDpIDNOTOBSERVE. DOCUMENT CONVERSATIONS,OBSERVATIONS,OR OCCURRENCES,DEEMED SIGNIFICANT TO THE PROGRESS OF WORK,BE SPECIFIC AS TO WHO,WHAT,WHEN,AND WHERE. Arrived on site at the request of the contractor to evaluate the excavated footing subgrade at the building pad footprint. A 1/2 inch diameter steel rod was used to probe the excavated footing subgrades at the west 1/3 and center 1/3 of the building pad footprint. The footing subgrade was observed to be firm and satisfactory with the exception of the footing subgrade at the center 1/3 of the building pad footprint. During the probe,the conditions were observed to be very soft at the native subgrade portion of the pad requiring an over-excavation to a firm, suitable condition. The areas of over-excavation are as follows: center 1/3 of building pad: southeast corner-west 33 feet=33'x5.5'x1';northeast corner-south 45 feet=45'x55'x1.3'. The contractor will use 3A inch minus crushed rock to restore the grades in the footing over-excavations. A Geocon Northwest representative will return to the site upon request. FIELD TECHNICIAN(PRINT) DATE HOURS O.T. LIST ON-SITE VISITORS Robert Pendell 08/11/11 NUMBER OF DENSITY TESTS TAKEN CLIENT REPRESENTATIVE SIGNATURE GEOCON N O R T H W ES T FIELD REPORT GEOTECHNICAL CONSULTANTS PAGE 1 OF 1 8283 SW CIRRUS DRIVE BEAVERTON,OREGON 97008 PHONE:(503)626-9889 FAX:(503)626-8611 DAY OF WEEK Friday DATE 08/12/11 OGRADING OTRENCH BACKFILL 0 OTHER REPORT NO. 16 PROJECT NAME PROJECT NO. Red Rock Center P1475-05-02 O CLIENT PHONE PROJECT MANAGER FIELD TECHNICIAN/AUTHOR u Red Rock Business Associates Wes Spang Robert Pendell N C CONTRACTOR PHONE PROJECT BRIEFING 0 YES DATE H BY 0 PREVIOUSLY BRIEFED A Bones Construction N G CONTRACTORS SUPERINTENDENT/FOREMAN PLANS AND SPECIFICATIONS 0 UNCHANGED E Darren TITLE D EQUIPMENT WORKING AND TYPE OF COMPACTOR BY APPROVAL DATE REV.DATE........... WEATHER Sunny SOURCE OF FILL FOLLOW-UP INVENTORY DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT? 0 YES 0 NO LIST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT: LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP: WHAT IN PARTICULAR SHOULD BE OBSERVED,CHECKED,OR TESTED DURING ff,FX VISIT? WAS A MEMO ISSUED TODAY'?0 YES 0 NO MEMO NO. CONTRACTOR/FIELD TECHNICIAN ACTIVITIES—INDICATE ACTIVITIES YOU DID AND DID NOT OBSERVE. DOCUMENT CONVERSATIONS,OBSERVATIONS,OR OCCURRENCES,DEEMED SIGNIFICANT TO THE PROGRESS OF WORK,BE SPECIFIC AS TO WHO,WHAT,WHEN,AND WHERE. Arrived on site at the request of the contractor to evaluate the excavated footing subgrade at the east 1/3 of the building pad footprint. A 1/2 inch diameter steel rod was used to probe the excavated footing subgrade at the southwest corner of the east 1/3 of the building pad. A very firm satisfactory condition was observed. The contractor was in the process of placing base rock on the west 1/3 and center 1/3 of the building pad footprint. The contractor will continue footing excavation today and requested a site visit on 8/15/11 in the morning and a Geocon Northwest representative will return to the site at that time. A Geocon Northwest representative will return to the site upon request. FIELD TECHNICIAN(PRINT) DATE HOURS O.T. LIST ON-SITE VISITORS Robert Pendell 08/12/11 NUMBER OF DENSITY TESTS TAKEN CUENT REPRESENTATIVE SIGNATURE