Loading...
PFI2015-00061 CITY OF TIGARD RIGHT OF WAY PERMIT • COMMUNITY DEVELOPMENT Permit#: PF12015-00061 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 05/14/2015 Parcel: SEG1696 Jurisdiction: Tigard Site address: Gv t Subdivision: Lot: Project: PGE Project Description: Adjacent to 14030 SW 97th Avenue. Boring under 97th and trenching in the right of way. Owner: FEES Description Date Amount PFI Permit Fee 05/13/2015 $300.00 PHONE: Contractor: PHONE' FAX: Applicant: TIMOTHY BELL 10800 SW AVERY ST TUALATIN, OR 97062 PHONE: 503-672-5483 Total $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Not Present Signature: Issued By: — —` Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12015-00061 Ty pe: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be reinstalled or replaced, with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways". U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses. residents and area wide Emergency Services 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13- UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work (pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector, Kenny Fisher 503.816.6146(cell), 503.718.2602(office), or kenny@tigard-or.gov, twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 18- PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance,and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general, will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice CITY OF TIGARD RIGHT OF WAY PERMIT COMMUNITY DEVELOPMENT Permit#: PF12015-00061 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 05/14/2015 Parcel: SEG1696 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: Adjacent to 14030 SW 97th Avenue. Single Family Line Extension. Install 200 AMP 120/240V overhead service. Owner: FEES Description Date Amount PFI Permit Fee 05/13/2015 $30000 PHONE. Contractor: PHONE FAX Applicant: TIMOTHY BELL 10800 SW AVERY ST TUALATIN, OR 97062 PHONE 503-672-5483 Total $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: Not Present Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12015-00061 Type: Condition Name: Status: Sever : PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code,and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices,flag persons,etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector, Kenny Fisher 503.816.6146(cell), 503.718.2602(office),or kenny@tigard-or.gov,twenty-four(24)hours prior to commencing work, prior to any staged inspection,and after completing work covered by the permit. PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance,and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice City of Tigard PUBLIC WORKS —ENGINEERING PGE WORK ORDER# M1578268 Public Facility Improvement (PFI) Permit DESCRIPTION OF WORK(in the right-of-way) REQUIRED SUBMITTAL Check one: ig Utilities ❑ Sidewalk/driveway approach Li Street improvements ELEMENTS Detailed description: Single Family Line Extension B Minor work in right-of-way INSTALL 200 AMP 120/240V OVERHEAD SERVICE opening,ewalk repair,curb cut,street opening,etc.)requires: •Application form,completed and signed •Submit one(1)copy of scaled sketch Property address/location(s): 14030 SW 97TH AVENUE of the proposed work to be done TIGARD,OREGON 97224 P •Submit one(1)copy of traffic control plan -OR- Applicant's name: TIMOTHY BELL FOR LEE MARTINEZ ❑ Substantial project work requires above items and professional Address: 10800 SW AVERY STREET engineered plans for: TUALATIN, OREGON 97062 •Street widening Ci /state: Zip: •Subdivision infrastructure Phone: 503-672-5483 Ems: T&DSUPPORTAVERY@PGN.COM •Main utility line extension: - Storm Drain,Sanitary-Tigard - Water-Tigard Water Service Contractor's name: N/A Area Cmcludes Durham,King City CCB#: Expiration: and a portion of unincorporated Washington County) Address: City/state: Zip: DELIVER APPLICATION TO: City of Tigard Phone: Email: Planning/Engineering 13125 SW Hall Blvd. Engineer's name: N/A Tigard,OR 97223 Applications for"minor work in right-of-way" Address: only may be emailed to: City/state: Zip: rQwpermitalktigard-or.¢ov Phone: Email: Case No.: Estimated value of work (within the public right-of-way) �JQX�PPhcation submittal fee: 300 .� � •- Is work related to a LAND-USE DECISION? ❑ Yes p No Application accepted: If so,please specify(MLP,SDR,SUB,etc.) case #: By:—/y9 Date: Is work related to a BUILDING PERMIT? ❑ Yes 8 No Application reviewed: If so,PleasesP � PERMIT)specify(BUILDING case#: By:_� Date: 5 � Applicant otified: By: S Date: S /J 1:\[UfflWAMas[ers\1ind use Appkadons Rev.07/16Pw4 Cityof Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.*ard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work. -_- *When the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the rnvner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. BY SIGNING BELOW,THE APPLICANTS) SHALL CERTIFY THAT: • The above request does not violate any eed restrictions that may be attached to or imposed upon the subject prop. • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in the plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. SIGNATURES of each owner of the subject property required. L��- I Ti M O I-Wr SELL 12-ols- cp-� t/Autho�d Agent's signature Print name 'Fp R 4.EE M A9 —zDate Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard • 13125 SAX/Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 • Page 2 of 4 i N$ y j Single Flagger Operation ,�.. i q m 3 y I for LowT�olumes • a• i (optional(ADo BE ONELANE Q o I PREPARED ROAD m a I H H H !• I TO STOP AHEAD 4— 1-- — _ 4- 0 WORK _ I K'B "«A •...• i AHEAD p �+ tD 0000tNJ18`��Y I I \, 'l--poo------ ----------� • � � � � � 1 Moe _I T' max. it • • • T• • —' F1 R Buffer Protection Vehlcla ROAD w/TMA See Chapter 4 Optional) WORK � AHEAD 4PREPARED °Roo TO Two Flagger Operation AHEAD W (Optional) CD 01494 A 50 5940 1-142 RIGHT-OF-WAY PERMIT NOTICE: NEW PGE FACILITIES TO BE INSTALLED 2001-45 F40T A PERMIT FROM THE LOCAL JURISDICTION IS REQUIRED BEFORE ANY O AC-4 CD 2001-45 03097 PL'03097 WORK IN THE RIGHT-OF WAY MAY BE PERFORMED. ONLY PGE APPROVED (UNLESS OTHERWISE SPECIFIED)B-2 ACSR CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHER SPECIAL AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER PGE'S PERMIT PF VI SECONDARY PEDESTAL O D PROVIDED BY PGE B INSTALLED BY CUSTOMER THE CONTRACTOR MUST NOTIFY THE LOCAL JURISDICTION 48 HOURS BEFORE WORK IS TO BEGIN. A COPY OF THE PERMIT MUST BE ON SITE -------- INSTALL 1-350 AL-TX SECONDARY IN 1-3"PVC CONDUIT PROVIDED &INSTALLED BY CUSTOMER 08730 m 1 982-35 O -------' INSTALL AL-TX SECONDARY IN 1-3"PVC CONDUIT JW MC DONALD ST J FRONDEDD B INSTALLED BY CUSTOMER Oa PO 09098 Tm.R BLw rw l..I 925 72836 06369 O I LEGENII AN-2 ACS OA Lu 192-35 B•. Q PGE P—A, PF300 SECONDARY SPLICE PEDESTAL01769 Q 2001-45 E WR CHECKLIST r Tesco PAT ITEM YES COMMENT ®°•r"n" 120240V A 15 39220 HOfED(GGER PL-1789s<I..I a.wm °1 �1 1 200AMP BOOM 3' Ea Y` 170'1 HP/A C: BACKHOE �n r CONDUIT U) 2.2M6FLKR PGF TRENCH 1..LM U»rn•.n W I.G ^^-• '� 8 T02A AFC CONSTRUCTION NOTES: sFExr CUSTOMPROVI RUIT. ER TO DE ALL iNE--AND BACKFILLING TRENCH TO BE M a IOe.EIRI •RNRR ----- Q-1 30' LOCATES T 36 INCHES DEEP,MEASURED fROM FINN GRADE 8 STAKING 2 CONDUIT IIIf NECESSAR DULL BE GRAY,SCHEDULE 10.ELECTRICAL GRADE. _e �•ATT NC CONf%Nf WITH NYLON NLL STRNGS IMN 500 LBS TEST) .. PD 00041 PUGGING K ID MAINFGE TAAN�EWR"TICAL INHE CHES AND AND 24 HORIZONTAL OF INCHES CLEARANCE BETWEEN INSTALL 3"POLE CONDUIT UNIT TREETRIM G. AND owt UTILITIES ALL ELBOWS ro BE aB'%'� RAaus ON EXISTING BRACKETS LANDSCAPE �E o°EZNDNiE'ESoix n u°tPUNS'M 0'u��"0"10 A k a BOB�LEN�GFN NLW fIM Yn gytp AM RUN WITH MORE THAN 180 DEGREES N BENDS PVC SCHEDULE 40 BENDS ARE EASEMENT ACCEPTABLE FOR RUNS OF 150 FEET OR LESS THE MAXIMUM TOT.BENDS M ANY CONDOR RUN IS 210 DEGREES. sXcoH rtoesTALs RADE A ro A INsnuED o.. ST. ulrts WTTHR+THE urRm A 25 51 172 PERMBS X 11GARD J. CUSTOMER RESPON$NU FOIL ROAD CROSSINGS USF ONLY GRAY,$CNFWLF Q. FRAAL OMOt.Almwn LourKNs ARrsr eE APHn1+ED er PCE AHD.mN "mT�iesw min TTY aF iHEABounTINDnw�iY puIDERnEwLoreq"nFDE� .Is soi TRAFFIC PLAN KCTR GRADE,RK CaNDtxr WTm NnoN FIRE SrRwgs(Rw.sDD Lss.TEST). AWTNH Wxl BE B.[0 ON PPMI GRME AND lOG1ION CHneu SA or rlrt—ORER DIRECTIONA,BORING REQUIREMENTS,BLACK HDPE((HIGH DEN51'Y FOLYETNYLENEI DUCT A-2 AL-D CUTSHEET 4 OR SCHEDULE 40 PVC WITH A MECHANICAL CONN ECDON(CFRTAlOK OR LIKE MECHANICAL CONNECTION PROOUCn AS AN NTERHATNE i0 HDPE DUCT.HDPE SHALL MEET ME 1-142 UG CIA.VER. REQULREMEMS OF PGE SPEOECATION LC2033 IIAVN Asu ON REQUEST FROM LGE PROJECT TRANSMISSION ExT 01 RD STIUPES REASONS THE DUCT S= BE BUCK WITH THREE EQUALLY SPACE fYnBCFI G A SPECRK:ATION REQUIREMENtI. OREL TEST OF F6T PD 00232 SHUTDOWN HDPE FIRE IS REQUIRED AFTER NS AS"ION WITH PGE INSPECTOR PRESENT PL 01 770 CUSTOMER s.SINGLE FRFMARY►arAwTICIG-coHaRr TO EXTEND A.wxwxA OF n FROM SHUTDOWN TRNNSFow w MD. PD 00231 e.ALL rot TRAPGFOIMIEtl TG BE NBTALItD a rm MN=%ANY ca*L6T11u DOOR HANGER BLIIDNG,wwu 011 aY[EIYNr AIA 4 INT ANI'nit IIYGRIIRIr 28476ROE TR,wsEoa.ns MusT M IRnEN n RET A DrLeABLE ABA 4f O CONTACT ALWAYS AAANIAN ID Pm OfARA1Nal N PRONT OF ALL TRRl4TORA PD 09427 N 2000-20 COMPANY 7 CUSTOMER TRENCH ANO ELBOW CONFIGURATIONS MUST BE INSPECTED BY PGE PRIOR TO THINK -2 AL-DS BACKFIWNG WHEN YOU ARE READY FOR PGE TO INSPECT(AFTER INSTALLATION IS COMPLETE) PNB CR nEASE CALL S.3-7aB-s.N3o oB sa2-�La-4a4Is SALEM ABEN SAFETY SW ELROSE ST a DATE ME B 0015100,,ees1U ON siA"`w°Ro FOR uo BLnaL4No°"TiaUIPMERAT isoNSTANDAAD LRNDMORpRD EOUIPMEFR BUY BE AN OPTION AT AN ADDITIONAL cosi TO THE CUSTOBOR, FIRST! 01770 A-� AL XL p N 1982-45 JACT_O AS—BUILT VERIFICATION & NESC VIOLATIONS CORRECTED Li This document mcurctely represents FIELD Construction. Foreman: Dale: D SW OMA O General Foreman: Die. .� > PD 00227 � (Signature on wired for field construction changes.) P m SDPMfNG REVIEW: JASBUILT BY DESIGNER: la1 �P� $w EDGEw00D ST J CONTACT SERVICE COORDINATOR DATE: 420'5015 SCALE: 1-=60' ACCOUNT- 1070001 AWO W00004594 °No_M1578268 O J FOR BACK AND C—1 N NINS1 ON PRIORTITLE Q ` = TO BACKFIII PGE WILL NOT cll,ALI w;RE NEW C3 L urnit TRENTAL Is IDR- RAcTOR ` NEW CENTURY SERVICE COORDINATOR ORfuli SIZE P- JOB SITE LnT. 503-73 5150 OR 503-45.4 4348(SALEM) / TIGARD -1333711 11x17 L. ATTENTION: 4CALL 811 BEFORE YOU DIG PGE030 SW 97TH AVE / LDurroN SW MC D ALD ST OREGON LAW REQUIRES YOU IC FOLLOW RULES ADOPTED 1 BY THE OREGON UTILITY NOTIFICATION CENTER. DES[RNnOR/ N , A NEW 200A RESIDENTIAL SERVICE THOSE RULES ARE SET FORTH IN OAR 952-001-0070 THROUGH 952-001-0090.YOU MAY OBTAIN COPIES OF COUNTY ISECTTDH(5) wDItX WITH SHEET I THE RULES BY CALLING THE OREGON UTILITY L�AVERioN WASHINGTON C21-118 1 EK I NOTIFICATION CENTER ADMINISTRATION @ (503-232-1987) UNE CREW CENTER TO REQUEST UTILITY LOCATES CALL THE OREGON 2na sw uaro DR LEE MARTINEZ 6Tj By BE SIE I LANE WHITNEY IN UTILITY NOTIFICATION CENTER,817 AT LEAST KEBw MIIGrf�IOYX. 6AVE"GA,LTR P1ooN 2 BUSINESS DAYS PRIOR TO EXCAVATION. Call before you dig., O PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED