Report (4) 1
MaConsulting Engineers
November 20, 2013
Revised December 20, 2013
Ms. Karina Ruiz
DOWA-IBI Group Architects, Inc.
907 SW Stark Street
Portland, OR 97205
RE: Westside Christian High School Addition-Remodel
8200 SW Pfaffle Street—Tigard, OR
Permit No.: BUP2012-00259/BUP2013-00041 BUP2013-00053
Dear Karina,
We are in receipt of the revised final summary report by Carlson Testing, Inc., dated December 20, 2013.
Based on the reports submitted to us, to date, including the final summary report, as well as our own
observations, we believe that the West Side Christian High School Addition-Remodel project, except for the
future gymnasium addition project, was constructed in general compliance with the structural drawings S0.01
through S7.02 and the project specifications.
If you have any questions or need further information, please call me.
Sincerely,
AVIA { (
owserrtilittt
Michael Arellano, PE '10 PRaiz,
, oix
5 #ly, Q_
209512/Conformance Rev.doe . Z//
V OREGON
c' l''v. 21,'AV
;
41.E L. 1kej
r S. 1241- 13 J
111 SW Fifth Avenue, Suite 2500 Portland, Oregon 97204-3628 (503) 227-3251 Fax (503) 227-7980
Seattle Everett Tacoma Lacey Portland Eugene Sacramento Grass Valley San Francisco Walnut Creek Los Angeles Long Beach Pasadena
Irvine San Diego Boise Phoenie St. Louis Chicago New York
Bend Office (541) 330-9155
Geotechnical Office (503)601-8250
C�p r1so Testing, Inc. ugene Office (541)345-0289
>� 9 AA Salem Office (503)589-1252
Tigard Office (503)684-3460
Special Inspection
'REVISED' FINAL SUMMARY LETTER
Date: December 20, 2013
Job #: T1308829
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223-8199
Attn: Building Division
Re: Project Name: Westside Christian High School
Address: 8200 SW Pfaffle Street—Tigard, OR
Permit#: BUP2012-00259/BUP2013-00004/BUP2013-00053
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Reinforced Concrete
Cast-In-Place Anchors, Adhesive Anchors, Expansion Anchors, & Screw Anchors
Structural Masonry
Structural Steel
High Strength Bolts
Shotcrete
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested/inspected only.
P:\Projects\Genera1120131T1308829 111-19-13 Final Letter REVISED.doc Updated 11/30/11
Date: December 20, 2013
Job#: T1308829
Page 2 of 2
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
/1
Steven W. Leach
Project Manager
SWL/jk
CC' VVestside Christian High School —Andy Sears sears @wchsonline.org
City of Tigard Building Division —Walter'Chip' Barnett walter @tigard-or.gov
KPFF—Adam Roth ndam.roth @kpff.com
KPFF — Michael Arellano michael.arellano @kpff.com
Todd Hess Building Co —Todd Hess thess@toddhessbldg.com