Loading...
Report (24) EMIConsulting Engineers November 17, 2014 Mr. Brian Mares Scott Edwards Architecture LLP 2525 East Burnside Street Portland, Oregon 97214 RE: The Adrienne—Mixed Use—Building/Site Work 7148 SW Gonzaga St. —Tigard, OR Permit#BUP2013-00225 Permit#SIT2013-00024 Dear Brian: We are in receipt of the final summary report by Carlson Testing, Inc., dated November 14, 2014. Based on the reports submitted to us, to date, including the final summary report, as well as our own observations, we believe that the Adrienne Mixed Use Building project was constructed in general compliance with the Structural Drawings S0.1 through S7.3 and the project specifications. If you have any questions or need further information, please call me. Sincerely, fi'dAj Qom' r ?aC Michael Arellano, PE 3 ' , bar 1577 MA:kw 4 213043IConformance.doc V OREGON V 1 2 L' \ 'DLO L. �,4J 111 SW Fifth Avenue, Sults 2500 Portland, Oregon 97204-3628 (503) 227-3251 Fax (503)227-7980 Seattle Everett Tacoma Lacey Portland Eugene Sacramento Grass Valley San Francisco Walnut Creek Los Angeles Lang Beach Pasadena Items San Ciego Boise Phoenix St. Louis Chicago New York