Permit CITY OF TIGARD BUILDING PERMIT
1 COMMUNITY DEVELOPMENT Permit#: BUP2015-00134
T I G ARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 05/07/2015
Parcel: 2S101AC01900
Jurisdiction: Tigard
Site address: 12615 SW 72ND AVE
Project: Lowe's Hardware Subdivision: BEVELAND NO.2 Lot: 18-19,P
Project Description: Convert automatic door to manual door with panic hardware.
Contractor: NW ENTRANCE INC Owner: WASHINGTON COUNTY SCHOOL
15785 SE HEIDI LN DISTRICT NO. 23
DAMASCUS, OR 97089 6960 SW SANDBURG ST
TIGARD,OR 97223
PHONE: 503-658-5152 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: Permit Fee-Additions,Alterations, 05/07/2015 $119.33
Demolition
Occupancy Grp: Occupancy Load: 12%State Surcharge-Building 05/07/2015 $14.32
Dwelling Units: 0 Plan Review 05/07/2015 $77.56
Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 05/07/2015 $47.73
Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Sm$0.50(up to 05/07/2015 $2.00
Value: $2,950 11x17)
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $260.94
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are s- forth in OAR
952-001-00 • roug a•R 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232. •87 or 1.800.332.2.
Iss ed By: (. / l4# O{ r Permittee Signature:
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Commercial RECEIVED I 11It (11 1 I1 I I \1 ().1 )
City of Tigard Receives Date/By: S / I Permit No.: & /c.901</-4.6 15,1/111111 . • 13125 SW Hall Blvd.,Tigard,OR o. 7 2015 Plan Review
Phone: 503-718-2439 Fax: 503-598:1960 960 Date/By: Related Permit:
1 /( \R I 1 Inspection Line: 503-639 417t1� OF TIGARD Date Ready/By: Jane la See Page 2 for
Internet: www.tigard-or.goy,UILDII�G DIVISION
Notified/Method: Supplemental Information
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rotnded to the nearest dollar)of all
❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
work indicated on this application.
❑ 1-and 2-family dwelling ❑Commercial/industrial Valuation: $
❑Accessory building ❑Multi-family Number of bedrooms:
❑Master builder ❑Other: Number of bathrooms:
Total number of floors:
Job site address: /,.(e i 5 tA) . 7)t? 11.,...r New dwelling area: square feet
City/State/ZIP: f V_ C ., -.? Garage/carport area: square feet
l���W�-{� . C 1 7 3
Suite/bldg./apt.#: r I Project name: L S Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: I Lot 4: Permit fees*are based on the value of the work performed.
Tax map/parcel 4: Indicate the value(rotnded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
work indicated on this application.
Ocw.c{f Ma l / Valuation: $ (.v
W C / p e L'l)c t 1,1 tc..✓�t,j e Existing building area square feet
r New building area: square feet
-- pp� [[ / Number of stories:
Name: // A c( _ /U t!t-U/Zt vl , c ACif b 1 l'r G f Si Type of construction:
Address: MIS M,4 t .D.,3-7 / &c/a-0 . - u1 . d;IllA h ic, T Occupancy groups:
City/State/ZIP:I[e)<z,rSi CV �r 7 3 d 3 Existing:
Phone:( ) Fax:( ) New:
11111M1126. • CONTACT PERSON
Business name:
Structural plan review fee(or deposit):
Contact name:
FLS plan review fee(if applicable):
Address:
City/State/ZIP: Total fees due upon application: t
Phone:( ) I Fax::( )
Amount received: , �[
E-mail:
CONTRACTOR Commercial and residential prescriptive installation of
• _. •.. ... roof-top mount:• Photovoltaic Solar Panel System.
Business name: N f y' c, �� Submit two(2)se •f roof plan with connection s
r7 and fire department ac . .,along with the • • Oregon
Address: j / g-`a' . C.. 1464'(t( i vi Solar Installation Specialty ..,e the . st.
City/State/ZIP: Dlt,m Ah c q S oil ??d'9Q Permit fee(includes pl.. - $150.00
t / and admi • . .five fee
Phone:(5) (F 5 6-4 ,2 . I Fax:( ) State surchar:• %of permit fee): $21.60
CCB Lic.: Cl t f 4,6 /0/617/1 5-
Total fee due upon application: $201.60
Authorized signature: This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name:amt.-f,_, X Date: - - do/ * Fee methodology set by Tri-County Building Industry
Service Board.
I:\Building\Permits\BUP_COM_PermitApp.doc v.04/21/2014 440-4613T(11/02/COM/WEB)
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
III • Accessibility: Barrier Removal Improvement Plan
Commercial & Multi-Family - Additions or Alterations
I ►c ;\I:D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Pemrits\BUP_COM_PemritApp.doc Rev.12/18/2014
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
lig • • Plan Submittal Requirements
Commercial & Multi-Family - New, Additions or Alterations
I ICI;1 RD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with:
A. ❑ map& tax lot# El project name ❑ site address ❑ suite number
❑ zoning ❑ applicant name ❑ phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit- based on valuation of project.
4. ADDITIONAL INFORMATION AS FOLLOWS:
A. Fire Department Building Survey with (1) additional full set of architecture
drawings.
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
1 II Plan Submittal Requirements Matrix
•
Commercial & Multi-Family - New, Additions or Alterations
R, \I.[) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
ype 0 u f # of Plans
(Includes new,additions and alterations.) Required at
Submittal
Demolition Permit 2
(site plan is required showing location and square footage
of all buildings to be demolished,erosion control plan and
tree protection,if applicable)
Sitc Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Solar Photovoltaic 2
(Requires check list for prescriptive installation. If not
prescriptive installation,engineering is required.)
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County, and Tualatin Valley Fire & Rescue),if applicable.
I:\Building\Pemrits\BUP_COM_PermitApp.doc Rev.12/18/2014