Loading...
Report (43) VLMK E N G I N E T E R S P 503.Ecorn 453 F 503. 263 E 3933 SW Kelly Avenue • Portland • OR • 97239-4393 W www.vlmk.com St. Anthony Catholic Church Final Summary Report for Structural Observations February 26, 2014 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223-8199 PROJECT: St. Anthony Catholic Church Parish 9905 McKenzie St. Tigard, OR PERMIT NUMBERS: BUP2013-00065 SUBJECT: Final Summary Report for Structural Observations Attn: Building Division VLMK Consulting Engineers has performed Structural Observations on the above noted project, as required by the 2010 Oregon Structural Specialty Code (OSSC), Section 1710, and as noted in the approved permit documents. In addition, reports submitted by the special inspector (Carlson Testing, Inc.) were received and reviewed by VLMK as outlined in Section 1704. To the best of our knowledge, the work on this project was performed in conformance with the approved plans and specifications. 0 3,Q__C I Uq,4 Please contact me with any questions. -cvQ a PROIrFOS Coco • GI► •.- /02 9 S'n -rely, cz. r .- V of •,, .ulting Engineers f i /4 / r ON >, Ke . Kaplan, P.E., S.E. �'//t,1 Pii,v Q ( Pri ..I 2o`( (' VL Insulting Engineers H =S: 6-30-2015 cc: Fr. Leslie Sieg / St. Anthony Church Isieg @stanthonytigard.org Tom Barr/ St. Anthony Church tbarr @stanthonytigard.org Steve Miller/ St. Anthony Church stevefm60 @gmail.com Drew Rocker/ Ankrom Moisan Architects drewr @amma.com Craig 0-Connor/ R & H Construction koconnor@rhconst.com Mitchell Nicholson / R & H Construction MNicholson@rhconst.com Doug Steele / RF Stearns doug @rfstearns.com Steve Leach / Carlson Testing sleach @carlsontesting.com Kevin Kaplan / VLMK Engineers Kevink @vlmk.com 'Structural Engineering•Civil Engineering•Industrial Engineering•Planning•Studies/Evaluations•Entitlement File: G\Acad2012\20120263\Construction\Structural Observation Reports\Final Summary of Structural Observation(02-26-14)docx Page 1 of 1 Printed: February 26,2014