St. Anthony Catholic Church
Final Summary Report for Structural Observations
February 26, 2014
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223-8199
PROJECT: St. Anthony Catholic Church
Parish 9905 McKenzie St.
Tigard, OR
PERMIT NUMBERS: BUP2013-00065
SUBJECT: Final Summary Report for Structural Observations
Attn: Building Division
VLMK Consulting Engineers has performed Structural Observations on the above noted project, as
required by the 2010 Oregon Structural Specialty Code (OSSC), Section 1710, and as noted in
the approved permit documents.
In addition, reports submitted by the special inspector (Carlson Testing, Inc.) were received and
reviewed by VLMK as outlined in Section 1704.
To the best of our knowledge, the work on this project was performed in conformance with the
approved plans and specifications.
0 3,Q__C I Uq,4
Please contact me with any questions. -cvQ a PROIrFOS
Coco • GI► •.- /02
9
S'n -rely, cz. r .-
V of •,, .ulting Engineers f i
/4 / r ON >,
Ke . Kaplan, P.E., S.E. �'//t,1 Pii,v Q (
Pri ..I 2o`( ('
VL Insulting Engineers H =S: 6-30-2015
cc: Fr. Leslie Sieg / St. Anthony Church Isieg @stanthonytigard.org
Tom Barr/ St. Anthony Church tbarr @stanthonytigard.org
Steve Miller/ St. Anthony Church stevefm60 @gmail.com
Drew Rocker/ Ankrom Moisan Architects drewr @amma.com
Craig 0-Connor/ R & H Construction koconnor@rhconst.com
Mitchell Nicholson / R & H Construction MNicholson@rhconst.com
Doug Steele / RF Stearns doug @rfstearns.com
Steve Leach / Carlson Testing sleach @carlsontesting.com
Kevin Kaplan / VLMK Engineers Kevink @vlmk.com
'Structural Engineering•Civil Engineering•Industrial Engineering•Planning•Studies/Evaluations•Entitlement
File: G\Acad2012\20120263\Construction\Structural Observation Reports\Final Summary of Structural Observation(02-26-14)docx Page 1 of 1
Printed: February 26,2014