Report (45) Bend Office
(541)330-9155
Geotechnical Office (503)601-8250
Carlson Testing, Inc. Eugene Office (541)345-0289
Salem Office (503)589-1252
Tigard Office (503)684-3460
Special Inspection
`REVISED' FINAL SUMMARY LETTER
Date: December 20, 2013
Job#: T1308829
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223-8199
Attn: Building Division
Re: Project Name: Westside Christian High School
Address: 8200 SW Pfaffle Street—Tigard, OR
Permit#: BUP2012-00259/BUP2013-00004/BUP2013-00053
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Reinforced Concrete
Cast-In-Place Anchors, Adhesive Anchors, Expansion Anchors, & Screw Anchors
Structural Masonry
Structural Steel
High Strength Bolts
Shotcrete
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested/inspected only.
P:1 Projects\General120131T1308529111-19-13 Final Letter REVISED.doc Updated 11/30/11
Date: December 20, 2013
Job*: T1308829
Page 2 of 2
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
Steven W. L ch
Project Manager
SWL/jk
cc: Westside Christian High School—Andy Sears sears@wchsonline.org
City of Tigard Building Division—Walter'Chip' Barnett walter@tigard-or.gov
KPFF—Adam Roth Adam.roth@kpff.com
KPFF— Michael Arellano michael.arellano@kpff.com
Todd Hess Building Co—Todd Hess thess @toddhessbldg.com
Dan Quatier dan @quatier.com
Carlson Testing, Inc.
Incompleted Items List (NCL)
Dec 20,2013
T1308829.
Project Name: WESTSIDE CHRISTIAN HIGH SCHOOL
Project Address: 8200 SW PFAFFLE ST TIGARD OR
Permit No: BUP2012-00259 (INTERIOR DEMO) / BUP2O13-00004 (SITEWORK) / BUP2013-00053 (END)
P.O.No: Project Manager: STEVEN W. LEACH
Item# Insp. Date Item Description Compliance CTI Sign-Off Date
Corrected
1 RC 07/08/2013 WELDS ARE UNDERSIZED. SHOULD BE 5/16" PER WELDS ARE 5/16" L. BEADLE 07/10/2013
11/S7.10.
2 RC 07/08/2013 NO WELDER CERTIFICATIONS ON FILE AT SITE. GOT WELDER CERTIFICATIONS L. BEADLE 07/10/2013
CERTIFICATION NUMBER FROIi PREVIOUS REPORT AND ARE NOW ON SITE.
TALKED TO WELDER OVER THE PHONE.
3 RC 07/08/2013 NO WPS ON SITE. WPS NOW ON SITE. L. BEADLE 07/10/2013
4 KP 08/05/2013 GROUT MIX #KPB3511 NOT APPROVED BY ENGINEER OF GROUT MIX #KPB3511 HAS H. TIMZEN 08/21/2013
RECORD. MIX KPB3011 IS THE APPROVED MIX. BEEN APPROVED BY RFI
#81.
5 LB 09/05/2013 PER 13/56.02, REJECTABLE POROSITY IN WELD ROOF POROSITY CORRECTED. JANE£ F. HIETPAS 09/17/2.013
LEVEL 10.2/E.2.
6 LB 09/05/2013 PER 10/56.02, SHORT VERTICAL WELD SHEAR PLATE TO WELD ADDED PER 10 ON JAMES F. HIETPAS 09/17/2013
BEAM ROOF LEVEL 10/E. 56.02.
7 LB 09/05/2013 ROOF 6/S7.02 UNDER CUT VERTICAL WELD SHEAR PLATE UNDER CUT CORRECTED. JAMES F. HIETPAS 09/17/2013
TO EMBED ROOF LEVEL 11/E.
8 LB 09/05/2013 PER 8/S7.01, UNDERSIZED WELD DUE TO GAP ROOF UNDERSIZED WELD JAMES F. HIETPAS 09/17/2013
LEVEL B/D.5. CORRECTED.
CC:WESTSIDE CHRISTIAN HIGH SCHOOL
CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT
KPFF - ADAM ROTH
KPFF - MICHAEL ARELLANO
TODD HESS BUILDING CO - TODD HESS
DAN QUATIER Page: 1
Carlson Testing, Inc.
Incompleted Items List (NCL)
Dec 20,2013
T1308829.
Project Name: WESTSIDE CHRISTIAN HIGH SCHOOL
Project Address: 8200 SW PFAFFLE ST TIGARD OR
Permit No: BUP2012-00259 (INTERIOR DEMO) / BUP2013-00004 (SITEWORK) / BUP2013-00053 (END)
P.O. No: Project Manager: STEVEN W. LEACH
Item# Insp. Date Item Description Date
P Compliance CTI Sign-Off Corrected
9 LB 09/05/2013 PER 2/S7.02 ANGLE WELDED TO BEAM FLANGE EDGE VS WELD ADDED TO EXCEED JAMES F. HIETPAS 09/17/2013
TOP OF BEAM - C. 6 / 3-5.1, G/7.9-9; DOES NOT DETAIL.
MATCH DETAIL.
10 LB 09/05/2013 PER 2/S7.02 ANGLE WELDED TO BOTTOM OF TOP FLANGE WELD ADDED TO EXCEED JAMES F. HIETPAS 09/17/2013
VS TOP OF FLANGE E/4.1-5.1; DOES NOT MATCH DETAIL.
DETAIL.
11 KRT 09/30/2013 THREE LOCATIONS HOLES BLEW OUT OPPOSITE SIDE WHEN REINSPECTED ON 10/01/13. R. TAYLOR 10/01/2013
DRILLED; NOT EPDXIED AT 9 AND F-E.
12 RB 12/03/2013 (3) 3/4" DIA X 5 1/2" STRONG BOLT 2 (ESR 3037) BOLT SHEAR TESTING STEVEN W. LEACH 12/18/2013
HAD PREVIOUSLY BEEN INSTALLED AT CANOPIES ON GRID COMPLETE AND THIS ITEM
B. (1) AT FAR WEST END AND (2) ANCHORS AT FAR IS NOW IN COMPLIANCE.
EAST END. THESE NEED TO BE APPROVED BY ENGINEER
OF RECORD. ALSO TORQUE (FT/LB) FOR THE GROUT
FILLED CPIU; REFERENCE DETAIL 5/S6.14.
CC:WESTSIDE CHRISTIAN HIGH SCHOOL
CITY OF TIGARD BUILDING DI'.VISION - WALTER `CHIP' BARNETT
KPFF - ADAM ROTH
KPFF - MICHAEL ARELLANO
TODD HESS BUILDING CO - TODD HESS
Page:
DAN QUATIER