Loading...
Report Bend Office (541)330-9155 s�.y� Geotechnical Office (503)601-8250 Coil son Testing, Inc. Eugene Office (541)345-0289 Salem Office (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER RECEIVED Date: July 25, 2014 Job#: T1401170 JUL 3 0 2014 CITY OFTIGARD City of Tigard BUILDING DIVIS110N 13125 SW Hall Blvd Tigard, OR 97223-8199 Attn: Building Division Re: Project Name: Robinson Construction—Remodel Address: 11117 SW Greenburg Rd—Tigard, OR Permit#: BUP2014-00010 Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Adhesive Anchors Structural Steel (Shop Only) The non-compliance (NC) items recorded for each of the above inspection categories, as listed on the non-compliance report, have been either repaired and re-inspected by CTI for compliance or reviewed and accepted by the engineer of record for the project in the "As-Built Condition" or through an RFI. The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re-inspected by CTI. CTI did not provide any additional review or re-inspection of those items beyond the inspections that initially generated each of these individual items on the non-compliance list. The engineer of record has provided the acceptance of the non-compliance items and as-built conditions. All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. P:\Projects\General\2014\T1401170\07-25-14 Final Letter.doc Updated 11/30/11 Date: July 25, 2014 Job#: -T1401170 Oage2of2 CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC. eith Gauvin Project Manager KG/jk cc: Robinson Construction Co—Ryan Robinson - ryanr @robcon.com City of Tigard Building Division—Walter'Chip' Barnett' Mail/Email Carlson Testing, Inc. Incompleted Items List (NCL) Jul 25,2014 T1401170. Project Name: ROBINSON CONSTRUCTION — REMODEL Project Address: 11117 SW GREENBURG RD TIGARD OR Permit No: BUP2014-00010 P.O.No: 61919 Project Manager: KEITH R. GAUVIN Item# Insp. Date Item Description Compliance CTI Sign-Off Date Corrected 1 ML 02/13/2014 NO PERMIT ON SITE PERMIT IS NOW AVAILABLE. KEITH R. GAUVIN 05/02/2014 2 ML 02/13/2014 NO APPROVED PLANS FROM CITY OF TIGARD ON SITE. APPROVED PLANS ARE NOW KEITH R. GAUVIN 05/02/2014 THIS WORK WAS PER DETAIL 3 & 4 S1.1 FOM CIDA AVAILABLE. ENGINEERS FOR HEADERS FOR NEW OPENINGS. 3 KRT 04/02/2014 MIX #242 (4000 PSI) WITH AEA NOT APPROVED BY MIX DESIGN IS ACCEPTABLE KEITH R. GAUVIN 05/02/2014 ENGINEER OF RECORD. PER ENGINEER OF RECORD, CURTIS GAGNER, MEMO DATED 4/30/14. 4 KRT 04/03/2014 MIX #241 (4000 PSI) FROM CALPORTLAND NOT APPROVED MIX DESIGN IS KEITH R. GAUVIN 05/02/2014 BY ENGINEER OF RECORD PLACED IN NEW OPENING AT 15 ACCEPTABLE, PER ENGINEER AND B—D.5 SLAB ON GRADE. OF RECORD, CURTIS GAGNER, MEMO DATED 4/30/14. 5 RT 04/03/2014 NO APPROVED DETAIL ON SITE FOR THE ANCHORAGE OF VERTICAL HSS SECTIONS KEITH R. GAUVIN 05/02/2014 THE 6X6 HSS STRONGBACKS ON EACH SIDE OF THE ARE NON—STRUCTURAL SHIMS GARAGE OPENING. AND ARE ACCEPTABLE AS INSTALLED, PER EOR, CURTIS GAGNER, MEMO DATED 4/30/14. CC:ROBINSON CONSTRUCTION CO — RYAN ROBINSON CITY OF TIGARD BUILDING DIVISION — WALTER 'CHIP' BARNETT Page: I