Loading...
Report (22) Bend Office (541)330-9155 Geotechnical Office (503)601-8250 Carlson Testing, Inc. Eugene Office (541)345-0289 Salem Office (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER Date: October 14, 2014 RECEIVE] Job#: T1402687 OCT 2 0 2014 City of Tigard 13125 SW Hall Blvd d''1TY OF r�iGARp Tigard, OR 97223-8199 BUILDING DIVISION Attn: Building Division Re: Project Name: Washington Square—Macerich Address: 9585 SW Washington Square Rd—Portland, OR Permit#: BUP2014-00222 Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the following item(s) per our inspection reports only: Structural Steel High Strength Bolts All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTIN INC. Keith R. G uvin Project Manager KG/jk cc: Culp Construction (Irvine)— Dan Dault ddault @culpco.com City of Tigard Building Division —Walter'Chip' Barnett walter @tigard-or.gov Culp Construction (Irvine)— Erin Pearce epearce @culpco.com Culp Construction (Irvine)—Jeffery Morgan jmorgan@culpco.com Culp Construction (Irvine)— Kim Hartshorn ddault @culpco.com P:\Projects\Genera112014\T1402687\10-14-14 Final Letter.doc Updated 11/30/11