Report (31) EMIConsulting Engineers
November 17, 2014
Mr. Brian Mares
Scott Edwards Architecture LLP
2525 East Burnside Street
Portland, Oregon 97214
RE: The Adrienne—Mixed Use—Building/Site Work
7148 SW Gonzaga St. —Tigard, OR
Permit#BUP2013-00225
Permit#SIT2013-00024
Dear Brian:
We are in receipt of the final summary report by Carlson Testing, Inc., dated November 14, 2014. Based on
the reports submitted to us, to date, including the final summary report, as well as our own observations, we
believe that the Adrienne Mixed Use Building project was constructed in general compliance with the
Structural Drawings S0.1 through S7.3 and the project specifications.
If you have any questions or need further information, please call me.
Sincerely,
fi'dAj Qom'
r ?aC
Michael Arellano, PE 3
' , bar
1577
MA:kw 4
213043IConformance.doc V OREGON
V 1 2 L' \
'DLO L. �,4J
111 SW Fifth Avenue, Sults 2500 Portland, Oregon 97204-3628 (503) 227-3251 Fax (503)227-7980
Seattle Everett Tacoma Lacey Portland Eugene Sacramento Grass Valley San Francisco Walnut Creek Los Angeles Lang Beach Pasadena
Items San Ciego Boise Phoenix St. Louis Chicago New York