Loading...
Report (56) 7409 SW Tech Center Dr,Ste. 145 Tigard,OR 97223 "' sa3.a$s.3�gv Special Inspection Ph:503-443-3799 Fax:503-620-2748 Final Report Date: 10-8-13 Job# 13-4474-D00 Permit#2013-00084 Mail To: Project: FAROUK H. AL HADI HUNZIKER BUILDING 155 B AVENUE, SUITE 222 7940 SW HUNZIKER RD LAKE OSWEGO, OR 97034 TIGARD, OR 97224 To Whom It May Concern: ACS Testing, Inc. attests that their inspectors performed special inspection(s)on a continuous and/or Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed For the following: Steel Construction Concrete Construction Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications, and the applicable codes and standards for the jurisdiction. (34 ti\k,k, Approved by: Bob Brown/President BB/sa .raa. +" Proud to be Nationally Accredited by International Accrediting Service ACCREDITED