Loading...
Report Bend Office (541)330-9155 Geotechnical Office (503)601-8250 Carlson Testing, Inc. Eugene Office (541)345-0289 Salem Office (503)589-1252 Tigard Office (503)684-3460 Special Inspection RECEIVED SEP 9 2013 FINAL SUMMARY LETTER August 23, 2013 T1308567 CITY OFTIGARD BUILDING DIVISION City of Tigard 13125 SW Hall Blvd Tigard, OR 97223-8199 Attn: Building Division Re: Project Name: Washington Square— New Chiller Plant Address: 9585 SW Washington Square Rd —Tigard, OR Permit#: MEC2013-00173 Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the following item(s) per our inspection reports only: Adhesive Anchors Structural Steel The non-compliance (NC) items recorded for each of the above inspection categories, as listed on the non-compliance report, have been either repaired and re-inspected by CTI for compliance or reviewed and accepted by the engineer of record for the project in the"As-Built Condition" or through an RFI. The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re-inspected by CTI. CTI did not provide any additional review or re-inspection of those items beyond the inspections that initially generated each of these individual items on the non-compliance list. The engineer of record has provided the acceptance of the non-compliance items and as-built conditions. All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. P\Projects\Final Letter Forms\New Final Letter Templates\City of Tigard.doc Updated 11/30/11 August 23, 2013 T1308567 /Washington Square- New Chiller Plant Page 2 of 2 CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC. '34/4141-1(}t.dtil Neil Shannon Project Manager NS/ks cc McKinstry Co - Melisa Garwood EMAILED KPFF - John Mayer EMAILED Macerich - Roger Ott EMAILED