Loading...
Report rs d► Information t f.To Build On Engineering•Consulting•Meting October 11, 2013 William Maestas RH Mechanical PO Box 295 Boring, Oregon 97009 Subject: Final Summary Report 9009 SW Hall Blvd,Tigard,Oregon PSI Report No.07021249-3 Dear Mr.Maestas: Professional Service Industries, Inc. (PSI) is writing this letter to document that, in accordance with Section 1704.1.2 of the State Building Code a representative from our firm performed special inspection during construction for the following project: Permit No: MEC2013-00562 Project Address: 9009 SW Hall Blvd,Tigard,Oregon Project Description: Tigard Target Our project file indicates that PSI special inspection activities listed below were conducted as scheduled on October 1, 2013. This letter represents a summary of work observed and reported by a PSI representative and the resolution of any documented noncompliance. • Epoxy Anchors To the best of our knowledge, the periodic special inspection referenced herein were performed by our firm in general accordance with the requirements, approved plans and specifications, provided change orders that impacted plans and/or specifications,and applicable workmanship provisions of the State Building Code and Standards. If you have any questions or we can be of further assistance,please do not hesitate to call. Sincerely, Prof ssional Serv'• I dustries,Inc. John Eakman Medhanie Tecle Project Manager Department Manager PSI Construction Services Department PSI Construction Service., Department Professional Service Industries,Inc.•6032 N.Cutter C.rcle,#480•Portland,OR 97217•Phone 503:'289.1778•Fax 503=289.1918•CCB#176269