Report rs d► Information
t f.To Build On
Engineering•Consulting•Meting
October 11, 2013
William Maestas
RH Mechanical
PO Box 295
Boring, Oregon 97009
Subject: Final Summary Report
9009 SW Hall Blvd,Tigard,Oregon
PSI Report No.07021249-3
Dear Mr.Maestas:
Professional Service Industries, Inc. (PSI) is writing this letter to document that, in accordance with Section
1704.1.2 of the State Building Code a representative from our firm performed special inspection during construction
for the following project:
Permit No: MEC2013-00562
Project Address: 9009 SW Hall Blvd,Tigard,Oregon
Project Description: Tigard Target
Our project file indicates that PSI special inspection activities listed below were conducted as scheduled on October
1, 2013. This letter represents a summary of work observed and reported by a PSI representative and the resolution
of any documented noncompliance.
• Epoxy Anchors
To the best of our knowledge, the periodic special inspection referenced herein were performed by our firm in general
accordance with the requirements, approved plans and specifications, provided change orders that impacted plans
and/or specifications,and applicable workmanship provisions of the State Building Code and Standards.
If you have any questions or we can be of further assistance,please do not hesitate to call.
Sincerely,
Prof ssional Serv'• I dustries,Inc.
John Eakman Medhanie Tecle
Project Manager Department Manager
PSI Construction Services Department PSI Construction Service., Department
Professional Service Industries,Inc.•6032 N.Cutter C.rcle,#480•Portland,OR 97217•Phone 503:'289.1778•Fax 503=289.1918•CCB#176269