FINAL SUMMARY LETTER
March 10, 2014
T1309088
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223-8199
Attn: Building Division
Re: Project Name: Snyder Roofing—Building Expansion
Address: 12650 SW Hall Blvd—Tigard,OR
Permit#: BUP2013-00165
Per Chapter 17, Section 1704.1.2 of the International Building Code(IBC),we have performed special inspection of the following
item(s) per our inspection reports only:
Reinforced Concrete
Cast-In-Place Anchors
Adhesive Anchors
Expansion/Wedge Anchors
Structural Steel
High Strength Bolts
All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of
our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable
workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and
verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of
any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work
may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members
of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to
be conclusive representations of fact. Our reports pertain to the material tested/inspected only. CTI's services did not include
responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or
procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further
questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC
K rtis arkin
Project Manager
KP/ks
cc: Precision Construction Co—Jay Marsh EMAILED
T M Rippey Consulting Engineers—Ray Watson EMAILED
Cameron Rutz Architect LLC EMAILED
Snyder Roofing Inc—Ron Newton EMAILED
T M Rippey Consulting Engineers—Kyle Kruger EMAILED
P:\Projects\Final Letter Forms\New Final Letter Templates\City of Tigard.doc Updated 11/30/11