Report Bend Office (541)330-9155
Geotechnical Office (503)601-8250
Carlson Testing, Inc. Eugene Office
Salem Of (541)345-0289
Office (503)589-1252
Tigard Office (503)684-3460
Special Inspection RECEIVE])
FINAL SUMMARY LETTER
Date: March 18, 2015 MAR 2 5 2015
Job#: T1309125
CITY OF l I(.AKD
BUILDING DIVISION
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223-8199
Attn: Building Division
Re: Project Name: Durham WWTP—Cogeneration & Brown Grease Receiving Facility
Address: 16375 SW 85th Avenue—Tigard, OR
Permit#: SIT2013-00013/BUP2013-00117
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Reinforced Concrete
Cast-In-Place Anchors, Adhesive Anchors or Expansion Anchors
Structural Masonry
Structural Steel
High Strength Bolts
The non-compliance (NC) items recorded for each of the above inspection categories, as listed on the non-compliance
report, have been either repaired and re-inspected by CTI for compliance or reviewed and accepted by the engineer of
record for the project in the"As-Built Condition"or through an RFI.
The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re-inspected by
CTI. CTI did not provide any additional review or re-inspection of those items beyond the inspections that initially
generated each of these individual items on the non-compliance list. The engineer of record has provided the acceptance
of the non-compliance items and as-built conditions.
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested/inspected only.
P:\Projects\General\2013\T1309125\03-18-15 Final Letter.doc Updated 11/30/11
Date: March 18, 2015
Job#: T1309125
Page 2 of 2
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
to en W. Leach
Project Manager
SWL/jk
cc: Clean Water Services (Durham)—Randy Naef EADOC
City of Tigard Building Division—Walter'Chip' Barnett EMAILED/MAILED
Carlson Testing, Inc. •
Incompleted Items List (NCL)
Mar 18,2015
T1309125.
Project Name: DURHAM WWTP — COGENERATION & BROWN GREASE RECEIVING FACILITY
Project Address: 16375 SW 85TH AVENUE TIGARD OR
Permit No: SIT2013-00013/BUP2013-00117
P.O.No: PROJECT NO. 6471 Project Manager: STEVEN W. LEACH
Item# Insp. Date Item Description Compliance CTI Sign-Off Date
p. P Corrected
1 RB 01/20/2014 THE WELDING WAS ACCEPTABLE EXCEPT FOR T—PLUS WELDER CERTIFICATION R. BATY 01/21/2014
WELDER CERTIFICATION FOR THE FCAW. RECEIVED AND REVIEWED.
THIS ITEM IS NOW IN
COMPLIANCE.
2 KP 05/19/2014 THERE ARE NO PUDDLE WELDS ON RAFTER BEAMS DUE TO ACCEPTABLE PER CCR #34 K. PARKIN 07/18/2014
CONFIGURATION. ENGINEER OF RECORD TO REVIEW. SUBMITTED 05/28/14.
3 KP 05/19/2014 THERE ARE NO WELDS AT INTERIOR PARTITION WALLS ACCEPTABLE PER CCR #34 K. PARKIN 07/18/2014
DUE TO CONFIGURATION. ENGINEER OF RECORD TO SUBMITTED 05/28/14.
REVIEW.
CC:CLEAN WATER SERVICES (DURHAM) — RANDY NAEF
CITY OF TIGARD BUILDING DIVISION — WALTER 'CHIP' BARNETT
CH2M HILL INC (PORTLAND) — STEVE REYNOLDS