Loading...
Report (44 rwi ... Request to Energize an Electrical Installation RECE!VEJ) r^?2 APR 2 7 2015 REOUEST4NGSUPERVISING ELECTRICIAN INFORMATION_ " . .- .. Name of supervising electrician: Robert Bruene Date o,r,�`pp�t:(y1_ ,Ilio ,. . Supervising electrician's license number: 52155 Date installation was eompittPI t'PEVSiOl�' Electrical permit no.: ELC2 015-0 0 2 901f,temporary permit is posted at the joh site,please include a copy of it with this form. EMPLOYING:ELECTRICAL.CONTRACTOR INFORMATION Name of electrical contractor: Christenson Electric, Inc License no.: 26-340 Business address: 111 SW Columbia,Suite 480 City: Portland State: OR ZIP: 97201 Phone: 503 -419^3300 Fax: 503/r+/-4419- 3333 E-mail: bob.bruene@christenson.com 1:RMA7TON,E;F:. : ... M .. Customer's name: Meadow Creek Apartments Customer'sa.ddress: 12505 SW North Dakota, Unit 1708 City: Tigard State: OR .ZIP: 97223 Address of installation if different than customer's address: City: State: ZIP: .y - "INSPECTING.:AUTHORITY INFORMATION - Authority having jurisdiction to inspect: City of Tigard Phone: 503 .71 X24 3 9 Address: 1312 5 SW Hall B lvd City: Tiagrd State: OR ZIP: 97223 : • a RECEIMING:_ELECTRIC UTILITY INFORMATION _ _. Name of electric utility receiving request: PGE Phone: 503 -736- 5771 Address: 121 SW Salmon St. City: Portland State: OR ZIP: 97204 W ,. y"L,:'REAS!DI31, OIiE!QW S; . T. A. Restoring electrical service that was interrupted or disconnected because of either a: ❑ Service change or [Uncontrollable event,such as fire,flood,or severe weather; or B. Electrical service at a remote location needs to be: ❑Initialized ❑Restored COMPLETION INSTRUCTIONS AND SIGNATURE Supervising electrician Electrical contractor Note:p cr sending this form to the electric utility Note: By close of business on the first business day following name ar, ve, 'u must send a copy of this form to: energizing of a completed installation in response to the above (1)th; ectri•',] ontractor,(2)the customer,and request,you must (1)notify the authority having jurisdiction (3)th:1- spec}n, authority. that the installation has been energized,and (2)request that the I authority inspect the completed installation. • Supe ,ising ele 'deism's signature Date Electric utility 4-2 7_15 Note: Please consider notifying the inspecting authority identified in this request when an installation is energized pp before inspection. eEUN�EM R StKVIC�. S 440-0048-COM(10/(18/COM