PFI2015-00026 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PFI2015-00026
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 04/21/2015
Parcel: 2S 111 CA00500
Jurisdiction: Tigard
Site address:
Subdivision: ALDERBROOK FARM Lot: 10
Project: Sattler Sewer Extension
Project Description: Extend public sanitary sewer line and install manhole to serve two new single-family homes.
Owner: FEES
PHOENIX REDEVELOPMENT INC Description Date Amount
516 SE MORRISON ST, STE 700 PFI Permit Fee 03/09/2015 $300.00
PORTLAND, OR 97214 Erosion Control Only-Eng 04/21/2015 $322.80
PHONE: PFI Permit Fee 04/21/2015 $225.00
Contractor:
PHONE:
FAX:
Applicant:
CALE DONEY
1815 NW 169TH PL.
BEAVERTON, OR 97006
PHONE: 503-969-8298
Total $847.80
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature:
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12015-00026
Type: Condition Name: Status: Severity:
PFI_Sidewalk/[ 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI—Sidewalk/1 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI—Sidewalk/1 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI—Sidewalk/1 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI—Sidewalk/1 05- PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>, to establish a preconstruction meeting.
PFI—Sidewalk/1 06-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI_Sidewalk/[ 07- PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI—Sidewalk/1 08-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2) persons who have
authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing,of any/all assignment changes.
PFI—Sidewalk/1 09-OTHER Applied Notice