Loading...
PFI2015-00026 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PFI2015-00026 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 04/21/2015 Parcel: 2S 111 CA00500 Jurisdiction: Tigard Site address: Subdivision: ALDERBROOK FARM Lot: 10 Project: Sattler Sewer Extension Project Description: Extend public sanitary sewer line and install manhole to serve two new single-family homes. Owner: FEES PHOENIX REDEVELOPMENT INC Description Date Amount 516 SE MORRISON ST, STE 700 PFI Permit Fee 03/09/2015 $300.00 PORTLAND, OR 97214 Erosion Control Only-Eng 04/21/2015 $322.80 PHONE: PFI Permit Fee 04/21/2015 $225.00 Contractor: PHONE: FAX: Applicant: CALE DONEY 1815 NW 169TH PL. BEAVERTON, OR 97006 PHONE: 503-969-8298 Total $847.80 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12015-00026 Type: Condition Name: Status: Severity: PFI_Sidewalk/[ 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI—Sidewalk/1 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI—Sidewalk/1 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI—Sidewalk/1 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI—Sidewalk/1 05- PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI—Sidewalk/1 06-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Sidewalk/[ 07- PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI—Sidewalk/1 08-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2) persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing,of any/all assignment changes. PFI—Sidewalk/1 09-OTHER Applied Notice